January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.

Slides:



Advertisements
Similar presentations
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Advertisements

NLC - The Next Linear Collider Paul Czarapata Engineering Test Facility What is it and what does it do?
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
April 22, 2002David Finley to TD HQ Slide 1 RF Technology Development Group Mission The mission of the.
May 9, 2002David Finley to NLC Fermilab Slide 1 Linear Collider R&D at Fermilab David Finley NLC MAC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
October 25, 2001David Finley to NLC SLACSlide 1 Status of X-Band Structure Fabrication at Fermilab Our First X-Band Structure Progress of RF Factory.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
Harry Carter 05/10/02 Slide 1 NLC - The Next Linear Collider Project Linac Girder Studies and Plans NLC MAC Meeting May 9-11, 2002 Linac Girder Studies.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Operations, Test facilities, CF&S Tom Himel SLAC.
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
NLC - The Next Linear Collider Project John Cornuelle 12/11/02 NLC Structure Cost Comparison ISG 9 Meeting December 10-13, 2002.
NLC - The Next Linear Collider Project NLC Program Overview D. L. Burke NLC Machine Advisory Committee Fermilab May 2002.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Next Linear Collider 8-Pack Project D. Atkinson MAC Review, May 2002 The 8-Pack Project at NLCTA An overview of the schedule and budget for the project.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Linear Collider R&D in the U.S. Steve Holmes Chicago Linear Collider Workshop January 9, 2002.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ILC R&D Board Meeting: SRF Cavities Status and Plans
Complementary ISTC Projects #3888, 3889p
MICE Project in the US: Completion of Efforts
Injector Performance Requirements Conventional Facilities Update
Introduction to Jefferson Lab
IHEP Cryomodule Status
Upgraded Injector Test Facility
LARP Rotatable Collimators for LHC Phase II Collimation
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
ThomX – Commissioning Meeting – 25/01/2018
Update on the JLEIC pCDR
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities and Plans Update David Finley (Harry Carter) Fermilab Technical Division

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 2 Fermilab NLC Activities and Plans Update FY02 Activities (and a bit before that) RF Factory Improvements/Additions Engineering Teams Implementation Structure Production and Testing Future Plans

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 3 FY02 Activities: RF Factory Improvements/Additions Small vacuum furnace was installed and commissioned in September ‘01 Presently in use for structure subassembly production and brazing and bonding studies Improvements in RF measurement techniques and fixtures ongoing. Also, we are developing our RF calculations capabilities (hardware, software, and X-band experience)

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 4 FY02 Activities: RF Factory Improvements/Additions Large vacuum furnace presently under construction at AVS (Ayer, Mass.). Installation and commissioning will occur in March ’02 and it will be utilized to produce FXA our first structure fully assembled at Fermilab.

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 5 FY02 Activities: Engineering Teams Implementation For X-Band (NLC) Fermilab RF Factory Structures (Mechanical) Structures (Electrical/RF) Girders Vacuum System Cooling Water System Specifications Development Quality Assurance Development 8 Pack Integration Both TESLA and NLC FNAL Cleaning Facility SBIRs Permanent Magnets Demonstration of Remote Accelerator Operation Siting LC’s near Fermilab Etc etc Originally created to help focus on Technical Division FY02-03 goals for Linear Collider R&D. A further goal was to strengthen the FNAL/SLAC collaborative engineering effort. Recall: Fermilab’s Linear Collider R&D Goal: By the end of 2003, complete the R&D work leading up to CD-1.

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 6 FY02 Activities: Engineering Teams Implementation 1 st Structures (Mechanical) team meeting was held at SLAC in early December ’01 1 st Structures (Electrical) team meeting was held at SLAC in mid December ’01 1 st Girders team meeting is planned for this coming Wednesday, Jan. 30, at SLAC FY02 Budget includes 180 FTE-days at SLAC, much of which is in support of engineering teams implementation

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 7 FY02 Activities: Structure Production and Testing Completion of FXA-001 Construction completed in September 2001 Mechanical and RF testing completed in November ’01 Vacuum/outgassing testing in progress FXA-002 Production underway Construction to be finished by the end of this month All testing to be completed by the end of February 2002

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 8 Goals for FXA-002 & FXA-003 and Beyond We intend to: make FXA-002 and FXA-003 “the same but better than” FXA-001, make ~1 structure / month rather than ~1 / year, make FXB series structures for high gradient testing, make FXC series structures good enough for the NLC Main Linac, make two girders with nine 0.6 meter long structures on each girder in support of the Eight Pack Test.

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 9 Structures for Eight Pack Test Eight Pack Test at SLAC (Dave Schultz) In Phase II, a “pack of eight klystrons” will feed GHz X-Band power into a modified DLDS system and power two girders worth of structures with the full power and energy required by the NLC design. The (impossible) goal is to be done by the end of FY03 Girder A: 9 High Gradient 0.6 m long Test Structures (FXBs) Girder B: 9 NLC Main Linac 0.6 m long Structures (FXCs)

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 10 The (Fermilab) Plan for X-Band Structures In FY02 (with $1.95M) Make FXA-002 and FXA cm long, conventional machined, high gradient tests, 45 mm OD Make FXB-001 thru cm long, conventional machined, high gradient tests, 61 mm OD Use the race track with elliptical iris coupler design used on H60VG3 Deliver FXB-001 to SLAC in May for high power testing at NLCTA Start to order parts for FXC First Pass NLC Main Linac Design >>> Almost the Real Thing 60 cm long, assume diamond turned, real accelerators Note: Need FXC design (including couplers) by July 2002

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 11 The (Fermilab) Plan for X-Band Structures In FY03 Make FXB-004 thru 009 (plus two extras) Assume better coupler design than we had in FY01. Make FXC-001 thru 006 (plus two extras) See how many we actually have in mid to late FY03 and decide what to do in FY04

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 12 Conclusion to Xband Comments Significant progress has been made in the past year at Fermilab in development of our infrastructure and its capabilities. We look forward to more fully participating and contributing to the ongoing work in the NLC R&D Project collaboration in the future.

January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 13 Budget Considerations $1.95M TD NLC $1.15M TD SRF $0.55M BD NLC $1.00 M BD SRF $0.30 M DO $4.0M TD LC (all NLC) $2.0M TD SRF (HTE* +  ) $4.0 M BD LC (mostly NLC) $3.2 M BD SRF (HTE* + FNPL) Zero M DO * HTE. = CKM, (3 rd Harmonic), Injector III $4.95M Lab FY02$11.2M Lab FY03 FY02. FY03. SDH 1/23/02 Initial