6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
April 2009 AAP Review Global Design Effort 1 “Minimum Machine” is code for Design and Integration Studies in 2009 toward a Re-Baseline in 2010 which will.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort1 September 20-22, 2006 MAC Review - Costs Toward a Cost Estimate for the ILC Tetsuo Shidara, Wilhelm Bialowons, and Peter H. Garbincius.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Date Event Global Design Effort 1 ALCPG Briefing on ILC Cost Reduction Studies Ewan Paterson Personal Views GDE May 15, 08.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
19july06 - Vancouver L.C. Workshop - DCB (PHG) Global Design Effort 1 Report from the Design & Cost Board Peter H. Garbincius* on behalf of: Wilhelm Bialowons*,
Summary of WG2 :CFS for staging
Status and Plan of GDE Design Work (Including Road Map for RDR)
Accelerator Physics Technical System Group Review
ILC Global Design Effort
K. Yokoya KEK For RDR Management Board
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK

6-10 Nov. 06 ILCWS Valencia Global Design Effort 2 What is RDR Management Board? Formed just after Bangalore to centralize the responsibilities for producing the RDR. Responsible for organizing and giving direction to the RDR efforts within the AS, TS and GS. Finish its role at RDR completion (and its reviews) Members –Barry Barish –3 Regional Directors (Dugan, Foster, Nozaki) –3 Accelerator Design Leaders (Raubenheimer, Walker (chair), Yokoya) –3 Cost Experts (Garbincius, Bialowons, Shidara) –Integration Scientist (Paterson)

6-10 Nov. 06 ILCWS Valencia Global Design Effort 3

6-10 Nov. 06 ILCWS Valencia Global Design Effort 4 From the Charge of the Board, March 19 1.Organize (weekly) RDR meetings, setting agendas and goals in advance 2.Act as a forum for general technical discussions on the machine design. 3.Understand performance overheads and cost-tradeoffs in the design of the machine 4.Monitor the progress of the required information flow between AS and TS. Identify (or take note) of bottlenecks to resolved. 5.Identify 'global' conflicts or design problems, resolve them if possible (straightforward) or escalate them to the EC 6.Begin to formulate a plan (possible design modifications) to reduce the costs for post-Vancouver.

6-10 Nov. 06 ILCWS Valencia Global Design Effort 5 Board Meetings Weekly telephone conference Face-to-face meetings –Vancouver July –KEK Aug.31-Sep.1 –KEK Sep –CALTECH Oct –Valencia Nov –SLAC Dec –Daresbury Jan.10-12, 2007 –BeijingFeb. 2007

6-10 Nov. 06 ILCWS Valencia Global Design Effort 6 Cost Reduction Target Vancouver cost is just too high Reduction target set at KEK mtg –Total reduction ~ 30% from Vancouver Accelerator (design, components) ~ 20% Physics scope ~ 10% Major reduction items proposed by KEK meeting Contact persons to AS/TS/GS defined for further reduction CFS cost savings ~14% at Caltech meeting

6-10 Nov. 06 ILCWS Valencia Global Design Effort 7 Design Changes Since Vancouver(1) Approved 2IPs with 14mrad crossing angle Single DR for positron 5m Muon wall Surface assembly of detectors Central injector complex (Nov.2) –1e-DR, 1e+DR in the same tunnel –DRs, KAS, e-injectors, all near the IP

6-10 Nov. 06 ILCWS Valencia Global Design Effort 8 Design Changes Since Vancouver(2) CCB pending Linac unit specification (CR#20) –9 + 8(with Q) + 9 cavities Larger waveguide (WR770) RF power system for 33.5MW/m Reduction of number of klystron 1/13 –Eliminate overhead of number of units (3.5%) –Reduce overhead for cryogenic static loss RTML for central injector complex

6-10 Nov. 06 ILCWS Valencia Global Design Effort 9 Design Changes Since Vancouver(3) Under preparation of Change Request (positive among Management Board) Electron source –Laser rooms to surface –Remove backup (except gun+buncher) Positron source –Half the number pf BPM+correctors –Remove 2 nd target –Minimize underground target hall Damping Rings –9mm bunch length to reduce RF power (with same momentum compaction) –Lattice modification to eliminate 2 shatfs

6-10 Nov. 06 ILCWS Valencia Global Design Effort 10 Design Changes Since Vancouver(4) CFS Many items discussed at CALTECH meeting by CFS Group –Linac tunnel diameter 5m  4.5m –Reduce number of shafts –Reduce the sizes of caverns –Reduce power and cooling equipments

6-10 Nov. 06 ILCWS Valencia Global Design Effort 11 Design Changes Since Vancouver(5) Those related to physics scope (Management Board is positive for change, waiting for physicists responce) Reduce number of bunches (and luminosity) to half –Same beam train length (2x bunch distance) –Reduce linac RF system (lower beam current) –Still upgradeable to the full luminosity 1 IP with push-pull detectors

6-10 Nov. 06 ILCWS Valencia Global Design Effort 12 Design Changes Since Vancouver(6) Examples of items which Management Board did not agree with, at least for RDR Souces –Conventional positron source –Remove KAS (keep-alive source) Damping Rings –Reduce momentum compaction –Use higher harmonic cavities –Reduce circumference to half (half luminosity) RTML –Single stage bunch compressor –Remove spare klystron in bunch compressor #1 Main Linacs –Separate cryostat for quads in main linacs –Sheet-beam klystron –Eliminate circulators –Marx modulator (pending in Mgmt Board)

6-10 Nov. 06 ILCWS Valencia Global Design Effort 13 Design Changes Since Vancouver(7) Items waiting for discussion 2K RF cavities in DR (6mm bunch without reducing momentum compaction) Share shafts between BDS and DR Share service tunnel between BDS and injectors

6-10 Nov. 06 ILCWS Valencia Global Design Effort 14 What to do here at Valencia Entering the final phase to RDR Consolidate Area System Designs, Check completeness of the costs Review the basis and justify the cost of individual components Wednesday: AS interview Thursday:TS/GS interview Absolute costs to be discussed  closed meetings

6-10 Nov. 06 ILCWS Valencia Global Design Effort 15 Wednesday Interviews

6-10 Nov. 06 ILCWS Valencia Global Design Effort 16 AS Interviews Is the proposed cost savings reasonable? –What is the risk associated with the savings? Is the cost list complete? Is anything missing? What is needed towards RDR? What is the required R&D to achieve the cost savings? Schedule of submitting Change Request

6-10 Nov. 06 ILCWS Valencia Global Design Effort 17 Thursday Interviews

6-10 Nov. 06 ILCWS Valencia Global Design Effort 18 TS/GS Interviews What assumptions did you use? How did you get these numbers? What reviews and cross-checks did you perform? Compared with other projects? What was the average cost factor for Production Quantities? Learning curve? Were you lacking in specifications or requirements? Did requirements substantially increase cost or complexity? How did you optimize cost vs. performance? Need to negotiate with AS leaders! (From Peter’s )

6-10 Nov. 06 ILCWS Valencia Global Design Effort 19 After Valencia Close design changes (submit Change Requests) by the end of November `Internal’ cost review at SLAC Dec ILCSC-MAC 3 rd meeting in Jan Funding Agency cost briefing ? RDR draft must be ready by Beijing GDE meeting Feb.5-7

6-10 Nov. 06 ILCWS Valencia Global Design Effort 20 RDR Schedule