Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 TPTF Update for TAC December 4, 2008 Joel Mickey
Advertisements

Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 5, 2009 Joel Mickey
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Lead from the front Texas Nodal 1 TPTF Update for ROS October 16, 2008 Stacy Bridges
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC Nov 2, 2006 Trip Doggett.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
May, 2007 PMO Briefing Texas Nodal Market Implementation Program Overview of Nodal Change Control (w/Updated Appendices 05/24/07)
Lead from the front Texas Nodal 1 TPTF Update for TAC September 4, 2008 Stacy Bridges
Protocol Revision Subcommittee Tom Burke January 3, 2013.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris August 4, 2011.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Texas Nodal Market Implementation Transition Planning Task Force Metric Framework Review Readiness Advisor January 24, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 2, 2008 Stacy Bridges
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
TPTF Update for TAC October 5, 2007 Trip Doggett
Protocol Revision Subcommittee
Texas Nodal Market Go-Live Procedure
Presentation transcript:

Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett

Lead from the front Texas Nodal 2 Agenda ItemDescriptionPurpose 1. Meeting SummarySummary of recent TPTF activitiesFor review 2. Next MeetingsUpcoming activitiesFor review 3. Approval of Milestones Request TAC approval of Milestone – Business Requirements Complete for Market Management System Outage Scheduler Request TAC approval of Milestone – Conceptual System Design Complete for Market Management System Request TAC approval of Milestone – Conceptual System Design Complete for Commercial Systems – MP Registration For Vote

Lead from the front Texas Nodal 3 Meeting Summary  Meetings February 5-7, February 12, February 20, and February  On February 5, TPTF discussed the following:  Nodal Program Update  Energy Management System (EMS) Impact Status Update  Determination of Generation to be Dispatched in Security Constrained Economic Dispatch  Remedial Switching Action White Paper  EMS Definition of Outage  EMS Draft NPRR - Generation Subsystem Changes to Incorporate Approved White Papers

Lead from the front Texas Nodal 4 Meeting Summary – February 6  On February 6, TPTF discussed the following:  Alternate Wind Power Forecasting Methodology  Draft NPRR - Wind Power Forecasting  Recommended Language for Opportunity Outages  API for CRR System  CRR Optimization Run Time Options  MIS Update  Market Readiness Advisor Update  IRT Qualification Approach  Discussion of ERCOT Comments on NPRR037  MMS Outage Scheduler Requirements

Lead from the front Texas Nodal 5 Meeting Summary – February 7  On February 7, TPTF discussed the following:  COMS Review of NPRRs to align with Requirements  Section 4, Day Ahead Operations  On February 7, TPTF approved the clean up NPRR for Commercial Systems Section 4, as modified by TPTF, with the exception of Section The motion was approved by a ballot vote of 100% in favor, with four abstentions (City of Dallas, City of Allen, City of Eastland, and Town of Flower Mound). All Market Segments were present.  Section 5, Transmission Security Analysis and Reliability Unit Commitment  On February 7, TPTF approved the clean up NPRR for Commercial Systems Section 5, as modified by TPTF. The motion was approved by a ballot vote of 100% in favor, with two abstentions (City of Allen and City of Eastland). All Market Segments, except Independent Generators and Independent Power Marketers, were present.

Lead from the front Texas Nodal 6 Meeting Summary – February 7  On February 7, TPTF discussed the following:  COMS Review of NPRRs to align with Requirements  Section 6, Adjustment Period and Real-Time Operations  On February 7, TPTF approved the clean up NPRR for Commercial Systems Section 6. The motion was approved by a ballot vote of 100% in favor, with three abstentions (CenterPoint, City of Allen, and City of Eastland). All Market Segments, except Independent Generators, were present.  Section 7, Congestion Revenue Rights  On February 7, TPTF approved the clean up NPRR for Commercial Systems Section 7, as modified by TPTF. The motion was approved by a ballot vote of 100% in favor, with two abstentions (City of Dallas and Town of Flower Mound). All Market Segments were present.  COMS Draft NPRR for Credit Monitoring  Decided to schedule a special meeting, on February 20) to address questions in more detail.  COMS Update on Registration CSD

Lead from the front Texas Nodal 7 Meeting Summary – February 7  On February 7, TPTF discussed the following:  IDA Review disposition of comments for MP API Docs and Nodal Sandbox  IDA update on integration Activities  NPRR035, Net Metering  On February 7, TPTF approved ERCOT Staff’s clarifications in their comments on NPRR 035. The motion was approved by a ballot vote of 88.9% in favor, with three abstentions (City of Garland, City of Allen, and City of Eastland). All Market Segments, except Independent Generators and Cooperative, were present.  Draft NPRR - Removal of a Pseudo Resource

Lead from the front Texas Nodal 8 Meeting Summary – February 12  On February 12, TPTF discussed the following:  Review Disposition of Comments and Consider Possible Approval of Market Management System (MMS) Outage Scheduler Requirements Specification  On February 12, TPTF approved Outage Scheduler Requirements contingent upon incorporation of proposed changes documented in comments disposition spreadsheet as modified by TPTF on February 12, 2007 and by Remedial Switching Action white paper. The motion was approved by a ballot vote of 100% in favor, with two abstentions (CenterPoint and Exelon). All Market Segments, except Independent Generators and Consumers, were present.  Review MMS Draft NPRR for Confirmation of Trades  Review MMS Draft NPRR for Clarification on Re-submittal of AS Offers for SASM  On February 12, TPTF approved a motion to endorse the draft NPRR on resubmittal of AS Offers in SASM as modified by TPTF. The motion was approved by a ballot vote of 87.5% in favor, with no abstentions. All Market Segments, except Cooperatives, Independent Generators and Consumers, were present.

Lead from the front Texas Nodal 9 Meeting Summary – February 12  On February 12, TPTF discussed the following:  Review Disposition of Comments and Consider Possible Approval of MMS Conceptual System Design  On February 12, TPTF approved the MMS CSD as modified by TPTF. The motion was approved by a ballot vote of 100% in favor, with no abstentions. All Market Segments, except Cooperatives, Independent Generators and Consumers, were present.

Lead from the front Texas Nodal 10 Meeting Summary – February 20  On February 20, TPTF discussed the following:  Review Disposition of Comments on Commercial Operations draft NPRR on Credit Monitoring, including:  Review previous decisions by CWG and TPTF from last year  Discuss CRR forfeiture

Lead from the front Texas Nodal 11 Meeting Summary – February 22  On February 22, TPTF discussed the following:  Nodal Program Update  IRT Project  IRT Registration Approach  Market Readiness Advisor Update  EDS-1 Detailed Plan  Commercial Systems Project  Draft NPRR: Credit Monitoring and Management  On February 22, TPTF approved a draft NPRR on Credit Monitoring and Management. The motion was approved by a ballot vote of 100% in favor, with two abstentions (GEUS and City of Garland). All Market Segments, except Cooperatives and Independent Power Marketers, were present.

Lead from the front Texas Nodal 12 Meeting Summary – February 22  On February 22, TPTF discussed the following:  Commercial Systems Project  Registration CSD  On February 22, TPTF approved the MP Registration CSD with changes based upon all of the recommendations in the COMS Presentation, slide #6, presented at TPTF February 22, The motion was approved by a ballot vote of 100% in favor, with one abstentions (TXU). All Market Segments, except Cooperatives, were present.  CRR Project  Review of Steps to Review CRR Detail Design Documents

Lead from the front Texas Nodal 13 Meeting Summary – February 23  On February 23, TPTF discussed the following:  Market Management Systems Project  Remedial Switching Action Plan whitepaper  On February 23, TPTF approved the Remedial Switching Action Plan whitepaper. The motion was approved by a ballot vote of 100% in favor, with no abstentions. All Market Segments, except Consumers, were present.  Draft NPRR: Opportunity Outage  On February 23, TPTF approved the concept as described in the Reliant Protocol Language for Opportunity Outages as modified at TPTF on Feb 23rd provided a NPRR will be submitted to TPTF. The motion was approved by a ballot vote of 100% in favor, with no abstentions. All Market Segments, except Consumers, were present.

Lead from the front Texas Nodal 14 Meeting Summary – February 23  On February 23, TPTF discussed the following:  Discussion of issues regarding DC Tie, Controllable Load Resources  Issues with providing Responsive Reserve (RRS) over DC Ties  How should Controllable Load Resources (CLRs) be deployed for RRS?  Purpose of the Scheduled Power Consumption Snapshot  What is the intent of providing max deployment time and max weekly energy for CLRs  Should a Load be able to switch between Load Resource and CLR from hour to hour  CLRs providing Non-Spin  Review and consideration of draft NPRR: Pricing during EECP

Lead from the front Texas Nodal 15 Next Meetings  Next meetings  Wednesday, February 28 and Thursday, March 1  Monday, March 5 through Wednesday, March 7  Thursday, March 22 and Friday, March 23

Lead from the front Texas Nodal 16 Next Meetings (continued)  On February 28 and March 1, we plan to discuss:  EMS  Review and consideration of draft NPRR on Generation Subsystem Changes to Incorporate Approved Whitepapers (Possible Vote*)  Review of EMS Requirements Documents  Draft NPRR on Opportunity Outage  On March 5-7, we plan to discuss:  Nodal Program Update  CRR Optimization Runtime Options  NPRR on WGRs and Capacity Short Calculation  Hub Clarification NPRR  MIS Update  Training Update  NPRR on Removal of Pseudo Resource

Lead from the front Texas Nodal 17 TAC Approval of Milestones  On February 12, TPTF approved Outage Scheduler Requirements contingent upon incorporation of proposed changes documented in comments disposition spreadsheet as modified by TPTF on February 12, 2007and Remedial Switching Action white paper. The motion was approved by a ballot vote of 100% in favor, with two abstentions (CenterPoint and Exelon). All Market Segments, except Independent Generators and Consumers, were present.  On February 12, TPTF approved the MMS CSD as modified by TPTF. The motion was approved by a ballot vote of 100% in favor, with no abstentions. All Market Segments, except Cooperatives, Independent Generators and Consumers, were present.  On February 22, TPTF approved the MP Registration CSD with changes based upon all of the recommendations in the COMS Presentation, slide #6, presented at TPTF February 22, The motion was approved by a ballot vote of 100% in favor, with one abstentions (TXU). All Market Segments, except Cooperatives, were present.

Lead from the front Texas Nodal 18 TAC Approval of Milestones (continued)  The Transition Plan says: “Any declaration of the accomplishment of a major milestone (business requirements, conceptual design, and successful completion of Market Participant testing) or a decision to proceed is contingent on the approval of both ERCOT and TAC.”  Request that TAC approve the milestones  Approval of Business Requirements for Market Management System Outage Scheduler  Approval of Conceptual System Design for Market Management System  Approval of Conceptual System Design for Commercial Systems – MP Registration

Lead from the front Texas Nodal 19 Questions