Team West Pharmaceutical Sponsor: Tim Miller Adviser: Dr. Harris.

Slides:



Advertisements
Similar presentations
Ethernet Switch Features Important to EtherNet/IP
Advertisements

1.Twist top casing to release top platform 2.Turn switch to on position 3.Wait 12 seconds for full injection 4.Turn switch to off position 5.Wait 4 minutes.
CONTROL SYSTEMS: WHAT THEY ARE
Connor O’Leary, Micah Uzuh, Brandon Zimmerman, Matthew Howard Advisor: Dr. Dyer Harris.
Modeling the Process and Life Cycle CSCI 411 Advanced Database and Project Management Monday, February 2, 2015.
Welcome to Recruitment Apprentice Training & Coaching Program 23th-24th June The Recruitment Guru.
EQUIPMENT VALIDATION.
Critical Path and Gantt
Fitbit accuracy had to be verified Able-bodied test subject wore Fitbit Subject was asked to perform various activities Assistant recorded actual ambulation.
PRESENTATION ON LOAD CELL AND ITS APPLICATION
Project Management.
Project Scope Management
Team RopeIt Melanie Davis, Marissa Eppes, Zach Firth, Chris Hazel, Andrew Singles, Christine Wilkerson CategoryMetrics Functionality Feedback Time Accuracy.
Simulation of End-of-Life Computer Recovery Operations Design Team Jordan Akselrad, John Marshall Mikayla Shorrock, Nestor Velilla Nicolas Yunis Project.
Beth Madsen Jessie Holderman Adam Oster Sponsor: 1.
FRIDAY, JANUARY 8, 2010 RYAN MILLER – ME, PROJECT MANAGER CHRIS OXLEY – EE, LEAD ENGINEER RYAN ENYEART – ME, SYSTEM ENGINEER ALEX MANLEY – EE, SYSTEM ENGINEER.
Chapter 5: Project Scope Management
Effective Human Factors in Software-Intensive Systems Jo Ann Lane CSE Annual Research Review – March 2006 © USC CSE 2006 University.
Damian Ashmead Adam Binkley Angela Huenerfauth Beth Miller Jonathan Rashidi.
Senior Design: Validation of Design December 15, 2008.
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
Team 12 Amelia House Paul Jaffa Johanna Miller Brian Ortega.
GE Energy Silicon Wafer Measurement System Team 10 Olin Biddy Scott Johnson Chetwyn Jones Rob McCoy Tim Weber.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
The Quality Improvement Model
The Premier Software Usage Analysis and Reporting Toolset Maximizing Value for Software Users.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
The New Medical Device Audio & Video Player The interactive learning tool that is full of possibilities! from CMO Digital.
Team West Pharmaceutical Services Sponsors: Reginald Motley and Chris Evans Advisor: Dr. Singh BMEG: Ryan O’Boyle, Madison DeFrank, and Derek Hunter MEEG:
Computer System Analysis
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Chapter 6 System Engineering - Computer-based system - System engineering process - “Business process” engineering - Product engineering (Source: Pressman,
Somerset Berkley Regional High School Robotics Engineering with LabView.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
A substance used in the diagnosis, treatment, or prevention of a disease or as a component of a medication A substance used in the diagnosis, treatment,
Reverse Engineering Unit 3, Lesson 3 Explanation.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Agile Principles: Leadership-Collaboration.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Project Scope Management Process
Chapter 5: Project Scope Management Information Technology Project Management.
Quality by Design (QbD) Myth : An expensive development tool ! Fact : A tool that makes product development and commercial scale manufacturing simple !
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
COLIN PAYNE-ROGERS JACOB LENNOX DR. BENJAMIN VARELA (GUIDE) COOPER CROUSE-HINDS (SPONSOR) Senior Design P13472 Final Presentation – Change of Resistance.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
Ben Roberts – BME Nicole Riddle – BME Daniel Pierre – EE Kevin Kirby – EE Zac Wingard – ME Jordan Smith – CS/HOD.
Friction Wear Tester Voice of the Engineer Chris Williams Harrison Sprague Ben Wolfe Eric Kutil Noah Barker-Eldon R14600 Customer: Dr. Iglesias Guide:
Sami Lottes Team Leader Electrical Engineer David Sawyer ElliottChief Engineer Mechanical Engineering Coty Winchell Mechanical Engineering Michael Ballow.
Glass Fab Inc. Design Project Leadership: R15601.
DAVID ANDERSON RYAN DUNN BRYON ELSTON ELIZABETH FISCHER ROBERT MENNA GUIDE : BILL NOWAK CUSTOMER: DR. MICHAEL SCHRLAU (ME DEPARTMENT) P13375 : Computer.
Mid-Semester Presentation Senior Design October 5, 2010
The New Pharmaceutical Audio & Video Player The interactive learning tool that is full of possibilities! from CMO Digital.
M204 - Data Representation
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
P15051: Robotic Eye Final Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
1 Controls in Strategic management Dr. Fred Mugambi Mwirigi JKUAT.
Recommended Guide for Determining and Reporting Uncertainties for Balances and Scales Val Miller NIST Office of Weights and Measures.
A substance used in the diagnosis, treatment, or prevention of a disease or as a component of a medication recognized or defined by the U.S. Food, Drug,
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Biomechanical Tissue Stimulator Matt Brady (BME/EE) Ankeet Choxi (BME) Misha Kotov (CS) Steven Manuel (ME) Adviser: Dr. V. Prasad Shastri.
Copyright © 2009 Pearson Education, Inc.
P07203 Dynamometry Laboratory Infrastructure
Instrumented Walker Status Update 2
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
2.2 Dealing with Errors LEARNING GOAL
Automated Screw Organization System
Suspension arm system.
Presentation transcript:

Team West Pharmaceutical Sponsor: Tim Miller Adviser: Dr. Harris

Sponsor and Business Leadership in Drug Administration Systems and Components Project Focus: rubber manufacturing for various rubber device components

The Problem Rubber is being tested far too late in the manufacturing process and takes too long Results in excessive material waste, as production continues with wrong formulations

Project Scope Create a rapid, at-line testing method to determine whether a rubber compound was properly mixed and will cure correctly.

Technical Basis Focus on Rubber Production Scorch time, cure rate, performance, viscosity Factors relate to quality of batch

Questions?

Wants/Needs/Constraints Wants –Simple Readout –Cost Effective –Automated Needs –Accuracy of Prediction –Fast Testing –Minimize amount of sample destroyed Constraints –OSHA –FDA

Key Metrics MetricTarget Uncertainty± 2σ Time< 10 min Weight Destroyed< 1/2 lb

Selected Concept At-Line Viscosity Compression Test

Supporting Theory

Preliminary Testing Tests were performed in the CCM to verify testing method using the Instron 5567

Design Determine Viscosity via compression test

Fabrication The device was built from a combination of purchased motor components and machined framework

Calibrations and Programming Labview & GalilTools –Automatically converts and sends appropriate commands to the controller –Allows user to set number of data points –Safeguard to power off motors before critical loads are reached.

Video

Results and Statistical Analysis SampleViscosity (lb-s/in 2 ) A A A A A A Standard Deviation = 2.48×10 -4 (lb-s/in^2) Viscosity factor= (w^4)*8*(1/(h^3))*dh/dt

Meeting Key Metrics

Deliverables Prototype with ability to perform the desired tests Labview program for controlling the tests Method for performing tests and gaining useful data

Path Forward More Calibration Testing Develop a more polished program Build Database of viscosity data The device needs to be a bit more refined, with proper electrical enclosures

Cost Summary Sponsor given range: $5,000 Actual Costs: $4, –Zaber: Stepper Motors-> $ –McMaster Carr and Materials-> $ –Galil: Controller-> $ –Omega: Load Cell->$

Thank You Comments/Questions?