GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!

Slides:



Advertisements
Similar presentations
User Board - Supporting Other Experiments Stephen Burke, RAL pp Glenn Patrick.
Advertisements

GLite Status Stephen Burke RAL GridPP 13 - Durham.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
UCL workshop – 4-5 March 2004 – HEP Assessment of EDG – n° 1 HEP Applications Evaluation of the EDG Testbed and Middleware Stephen Burke (EDG HEP Applications.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
INFSO-RI Enabling Grids for E-sciencE Logging and Bookkeeping and Job Provenance Services Ludek Matyska (CESNET) on behalf of the.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
A DΙgital Library Infrastructure on Grid EΝabled Technology ETICS Usage in DILIGENT Pedro Andrade
INFSO-RI Enabling Grids for E-sciencE The gLite Software Development Process Alberto Di Meglio EGEE – JRA1 CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks PPS All sites Meeting: Introduction & Agenda.
Δ Storage Middleware GridPP10 What’s new since GridPP9? CERN, June 2004.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
JRA1 Middleware Frédéric Hemmer on behalf of Alberto Aimar, Maite Barroso, Predrag Buncic, Alberto Di Meglio, Steve Fisher, Leanne Guy, Peter Kunszt, Erwin.
Security Vulnerabilities Linda Cornwall, GridPP15, RAL, 11 th January 2006
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Owen SyngeTitle of TalkSlide 1 Storage Management Owen Synge – Developer, Packager, and first line support to System Administrators. Talks Scope –GridPP.
Stefano Belforte INFN Trieste 1 Middleware February 14, 2007 Resource Broker, gLite etc. CMS vs. middleware.
EGEE is a project funded by the European Union under contract IST Tools survey status, first experiences with the prototype Diana Bosio EGEE.
1 LHCb on the Grid Raja Nandakumar (with contributions from Greig Cowan) ‏ GridPP21 3 rd September 2008.
INFSO-RI Enabling Grids for E-sciencE gLite Data Management and Interoperability Peter Kunszt (JRA1 DM Cluster) 2 nd EGEE Conference,
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans Plzeň, 10 July 2006 Steve Fisher/RAL.
INFSO-RI Enabling Grids for E-sciencE Experience of using gLite for analysis of ATLAS combined test beam data A. Zalite / PNPI.
15 December 2015M. Lamanna “The ARDA project”1 The ARDA Project (meeting with the LCG referees) Massimo Lamanna CERN.
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
Documentation (& User Support) Issues Stephen Burke RAL DB, Imperial, 12 th July 2007.
INFSO-RI Enabling Grids for E-sciencE Technical Roadmap 3 rd JRA1 All Hands Meeting Erwin Laure Deputy EGEE Middleware Manager.
CERN LCG Deployment Overview Ian Bird CERN IT/GD LCG Internal Review November 2003.
David Adams ATLAS ATLAS-ARDA strategy and priorities David Adams BNL October 21, 2004 ARDA Workshop.
1Maria Dimou- cern-it-gd LCG November 2007 GDB October 2007 VOM(R)S Workshop report Grid Deployment Board.
LCG User Level Accounting John Gordon CCLRC-RAL LCG Grid Deployment Board October 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The LCG interface Stefano BAGNASCO INFN Torino.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
Summary of the EDG review Some info for the next future of the WP1 software Massimo Sgaravatto INFN Padova.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
JRA1 Testing Current Status Leanne Guy Testing Coordination Meeting, 13 th September 2004 EGEE is a project funded by the European.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
GridPP2 Data Management work area J Jensen / RAL GridPP2 Data Management Work Area – Part 2 Mass storage & local storage mgmt J Jensen
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
EGEE is a project funded by the European Union under contract IST Issues from current Experience SA1 Feedback to JRA1 A. Pacheco PIC Barcelona.
Acronyms GAS - Grid Acronym Soup, LCG - LHC Computing Project EGEE - Enabling Grids for E-sciencE.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
Comments on SPI. General remarks Essentially all goals set out in the RTAG report have been achieved. However, the roles defined (Section 9) have not.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
LCG/EGEE Operational Issues Stephen Burke RAL. November 1 st 2004LCG Operations - Issues Introduction List of problems to initiate discussion –A personal.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Nov 05, 2008, PragueSA3 Workshop1 A short presentation from Owen Synge SA3 and dCache.
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
Claudio Grandi (INFN and CERN)
INFNGRID Workshop – Bari, Italy, October 2004
SRM2 Migration Strategy
Savannah to Jira Migration
Quality Control in the dCache team.
Leanne Guy EGEE JRA1 Test Team Manager
gLite The EGEE Middleware Distribution
Presentation transcript:

gLite – An Outsider’s View Stephen Burke RAL

January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative! –Some things may be wrong Accurate information can be hard to obtain History Current situation Future

January 31 st 2005gLite overview What was supposed to happen The original idea was to harden/re-engineer the deployed LCG middleware –Short development cycles driven by user feedback –No “big bang” releases –No major new development Autumn 2003: the ARDA RTAG recommended a new architecture based on AliEn –Set up a prototype system quickly –Rapid development endorsed

January 31 st 2005gLite overview What actually happened EGEE started well after EDG finished –Large gap: December > April 2004 EDG infrastructure (cvs, build system, bug tracking, developer guidelines, testbeds, …) all scrapped –New system may be better (?), but it took ~7 months to put it in place JRA1 “prototype” was essentially AliEn –Only two sites, of which one was hardly supported –ARDA project was set up and started using the prototype The members (some with no LCG experience) got used to AliEn LCG forged ahead with middleware improvements –Middleware quality/stability much improved –But the experiments are still unhappy

January 31 st 2005gLite overview AliEn -> gLite JRA1 wrote architecture and design documents for a major middleware development project –EDG experience suggests it will take years, not months –Not obviously driven by NA4 or SA1 requirements –AliEn pushed aside RB will support pull model as well as push –Migration to web services – everyone seems to like this, but what is the real gain in the short term? Web service code mostly not available yet anyway Big bang release is back! –Hardly any testing so far by SA1/LCG –Or most users –Information is limited

January 31 st 2005gLite overview Testbeds EDG testbed(s) and ITeam were successful –Both effectively lost in EGEE “Prototype” testbed not very useful –Effectively just one site, few machines –Not really a prototype – misled people about what to expect JRA1 testing testbed and test team effectively co-opted for integration –Reduced resources for testing –Few sites, limited manpower –Already ~600 bugs in savannah, growing rapidly 260 closed, another 130 fixed and being tested EDG had ~2500 bugs by the end SA1 PPS just starting at the start of 2005 –Role still unclear

January 31 st 2005gLite overview Workload management Development of the EDG/LCG RB –Seems to be largely backward-compatible –Only user docs so far are the EDG manuals Not clear what new features are available –Or whether LCG mods are included Not AliEn! –Support for pull model via new CEMon component Still uses BDII with GLUE schema –Should change to R-GMA (?)

January 31 st 2005gLite overview Data Management Very complex design, largely new code –No real user documentation, just javadoc –Mostly not delivered yet –Not clear how much will be in RC1 Metadata activities also in ARDA and GridPP Still seem to be developing the architecture –Particularly the interaction with the WMS –WMS hedging its bets Supports both (gLite and LCG) systems LCG has also been developing DM tools –New file catalogue on its way –How do they relate to gLite?

January 31 st 2005gLite overview Data Storage gLite has no development of its own, relying on SRM projects EDG-SE was not stable enough for production –Still in development? dCache almost ready, but has taken ~18 months and still has many bugs –Support unclear New LCG Disk Pool Manager –Only an alpha version so far Is storage management really this hard? –Will the “classic SE” ever die?!

January 31 st 2005gLite overview R-GMA Should be an information system –But both LCG and gLite still use BDII Some user documentation available gLite version is fairly backward compatible with LCG version –No web services yet –gLite version getting “fast track” into LCG Still few users –But needed for APEL accounting

January 31 st 2005gLite overview Security “Security must be built in from the start” –So it gets a separate activity! EGEE security requirements document nearly identical to EDG D7.5 from May 2002 –Which was mostly not implemented … Both LCG and gLite intend to use VOMS –But still not yet integrated with most middleware –No real strategy for how to use it? –Who “owns” VOMS?

January 31 st 2005gLite overview Others Package management –gLite is developing a software package manager and so is LCG! –May be useful, no experience yet GAS –Came with AliEn, not clear if anyone wants it

January 31 st 2005gLite overview Operational issues System Design –Neither SA1 nor JRA1 has anyone designing how the complete system should work Configuration –The existing system has a very complex configuration which is the source of many problems –Being addressed in JRA1, but not clear if it will really make things better Stability and debugging –In a big Grid some things are always broken –Error messages and logging must allow problems to be traced –Services need to be fault-tolerant –Not clear if JRA1 is addressing this

January 31 st 2005gLite overview What happens next? Code being delivered to SA1, will run on PPS All serious bugs supposed to be fixed by March –EDG experience is that it took >1 year to go from code delivery to production use – some things never made it! Migration strategy? –Hard if you don’t know what will work –LCG has its own developments, especially in data management –New R-GMA is largely backward-compatible And not critical yet –New RB seems similar to current version At least in push mode ALICE (and LHCb?) want AliEn –Data management is completely different Big bang releases –Code has now been branched –Will developers be keen to fix bugs in the “old” branch? –“Wait for the next version, it will all be fixed then”!