Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Huntman/Joe Lamy Aug 15, 2012.

Slides:



Advertisements
Similar presentations
1 NIST NwHIN Testbed. 2 What's NwHIN The nationwide health information network is a set of standards, services and policies that enable secure health.
Advertisements

HIT Standards Committee Privacy and Security Workgroup Recommendations for Electronic Health Record (EHR) Query of Provider Directories Dixie Baker, Chair.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly Aug 1, 2012.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Hutman September 5, 2012.
California Trust Framework Pilot Request for Funding Informational Webinar 24 June 2013.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
NOTICE OF CONFIDENTIALITY: This presentation is for the sole use of the intended recipient(s) and may contain confidential information. Any review, use,
Nick Vennaro, NHIN Team (Contractor), Office of the National Coordinator for Health IT Michael Torppey, CONNECT Health IT Security Specialist (Contractor)
Electronic Submission of Medical Documentation (esMD) for Medicare FFS Presentation to HITSC Provenance Workgroup January 16, 2015.
360Exchange (360X) Project Provider Directory Workgroup 09/07/2012.
360Exchange (360X) Project 10/25/12. Reminders / announcements Mission / scope review Workgroup updates Implementation sites 1 Agenda.
S&I Framework Provider Directories Initiative esMD Work Group October 19, 2011.
Outsourcing IAM in North Carolina
NHIN Specifications Richard Kernan, NHIN Specification Lead (Contractor), Office of the National Coordinator for Health IT Karen Witting, Contractor to.
NextGen Interoperability – Leading the Charge Presenter – David Venier DISCLAIMER: The views and opinions expressed in this presentation are those of the.
Public Health Reporting Initiative January 11, 2012.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
Discussion of 2015 Ed. NPRM Certification/Adoption Workgroup HIT Policy Committee April 2, 2014.
Regional Health Information Exchange: Getting There Ed Barthell – Wisconsin Health Information Exchange Hugh Zettel, GE Healthcare.
EsMD Background Phase I of esMD was implemented in September of It enabled Providers to send Medical Documentation electronically Review Contractor.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Federal Health Architecture How to Prepare for an HIE Connectathon Adeola Odunlami, Senior Solutions Architect Health and Civilian Solutions Division 1.
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup Wednesday, July 18,
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman Aug 22, 2012.
Public Health Reporting Initiative: Stage 2 Draft Roadmap.
Larry Wolf, chair Marc Probst, co-chair Certification / Adoption Workgroup March 19, 2014.
Data Access Framework (DAF) S&I Initiative Update June 19 th,
1 HITSP – enabling healthcare interoperability Current Framework and Fundamental Concepts  For those unfamiliar with the HITSP Harmonization Framework.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 15, 2011.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
Defining the 2016 CAS-2 cycle Timeline Slides used by the CAsC Committee on its July 23 rd T-con to establish the timeline for the main activities related.
S&I Framework Provider Directories Initiative All Hands Meeting 10/7/11.
PD Provider Directories Initiative Overview PD January 20, 2012.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
S&I Provider Directories Initiative Revisions to Initiative Charter July 1, 2011.
Cross-Enterprise User Authentication John F. Moehrke GE Healthcare IT Infrastructure Technical Committee.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup Wednesday June 13,
Security Checklists for IT Products. Agenda Overview of Checklist Program Discussion of Operational Procedures Current Status Next Steps.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.
Data Access Framework (DAF) John Feikema ONC Initiative Coordinator.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage (eDoC) Workgroup August 21, 2013.
Lab Results Interface Validation Suite WG July 28, 2011.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting May 9, 2011.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
HITPC - Information Exchange Work Group Meaningful Use Stage 3 Subgroup 2: Care Coordination and Patient and Family Engagement Co-Chairs: Jeff Donnell.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage PMD User Story & Harmonization August 7, 2013.
Electronic Submission of Medical Documentation (esMD)
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin Sept 19, 2012.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012.
1 DRAFT October 22, 2008 Ed Larsen Framework Review Working Group Plan.
HIE Certified Network Pilot Testing w CONNECT May 02, 2013.
Standards & Interoperability (S&I) Structured Data Capture (SDC) FHIR Profile IG SWG.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 29, 2011.
Provider Directories Tasking, Review and Mod Spec Presentation NwHIN Power Team April 17, 2014.
Lab Results Interface Validation Suite Workgroup and Pilots Workgroup Vision, Charter, NIST Collaboration, July 8,
“ Jericho / UT Austin Pilot” Privacy with Dynamic Patient Review November 5, 2013 Presented by: David Staggs JD, CISSP Jericho Systems Corporation.
Lab Results Interface Pilots WG Kick-Off August 1, 2011.
The Patient Choice Technical Project Pilots Working Group May 20, 2016.
July 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE / Submission Publicity Committee /.15.
HIT Standards Committee NwHIN Power Team Dixie Baker, Chair July 20,
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011.
S&I Framework Provider Directories Initiative All Hands Meeting 09/23/11.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
Security Checklists for IT Products
Regional Health Information Exchange: Getting There
Ctclink executive leadership committee May 31, 2018
Project Timeline Pre-proposal Conference July 18, 2016
Presentation transcript:

Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Huntman/Joe Lamy Aug 15, 2012

Roll 2 NameOrganizationRepresentation Nick VanDuyneNYeC State Ivan HandlerIL John DonnellyNJTask Group Co-Chair - IWG Marty PrahlSSA Federal agency Dennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDykeVHA Kevin BradyNIST David Tao, Dan HuberSiemens EHR Vendor Dave Cassel, Rob KlootwykEpic Bill Howard, Charles ParisotGE Jeff Cunningham, Tim DunningtonICA HIE vendor Mike LaRoccaIntersystems Vladi Reznikov, Jennifer PuyenbroekCONNECT PMO Matt Bell, Tom Wilson, Kathy LinAxolotl Teddy GedamuMedfx Melissa OwensMarshfield ClinicHealth System Steve LeightyMedVirginia Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve MichaelIHIE Anuj DesaiInterop WG Eric HeflinTHSATask Group Co-Chair - Exchange Mariann YeagerExchange Ed O'Connor, Judith HutmanNitorONC Testing Contractor Dennis Wilson, Alisa Ray, Sue Rieber CCHIT ATCBs and Testing SMEs Jim St. Clair IHE USA Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs Traci Mapps SLI Global Solutions Kyle Meadors, Timothy Bennett Drummond Group Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard

Roll Call – Cayla Announcements – Eric Review of Phases – Judith (10 mins) Vote on Harmonized Phase I Test Cases – John (10 mins) Execution of Test Cases – Judith/Joe (10 mins) Test Case Metrics – Judith/Joe (7 mins) Open Discussion – All Wrap Up - John Schedule Review - John Agenda 3

Harmonized PD/QD/RD/MP/AF (aka Patient Record Lookup) Tests Are Ready for Vote! Future changes are possible, but will be incorporated into the next phase of test cases design and implementation (post Oct 2012) RFP Has 5 respondents Contracting is expected to begin this week Announcements 4

Harmonization Phases Phase 1 – SOAP Send/Receive Phase 2 – Direct Send/Receive Phase 3 – Secondary Methods, Service Discovery, & Provider Directories Parent Use Cases (Done) Test Case harmonization (Done) Tests: Mess & Auth Framework (Done) Tests: Patient Discovery (XCPD, PIX, PDQ), Query for Documents, Retrieve Documents (Done) Test Execution Guides (Done) Parent Use Cases Test Case harmonization Tests: Direct Applicability Statement (Done) Tests: Direct XDM/XDR-Bridge (Done) Tests: Direct Certificate Discovery (Done) Test Execution Guide Parent Use Cases Test case harmonization Tests: Web Services Registry (Done) Tests: HPD+ Tests: Document Submission (Done) Tests: Administrative Distribution (Done) Test Execution Guides Unified Test Process – Has Been Proposed

Vote on Harmonized Artifacts PD, QD, RD, Messaging & Auth (Phase I) Vote to ratify this workgroups decision that the current written test cases for PD, QD, RD, MP, AF (aka Patient Record Lookup) are in “final” status ‘round-the-room vote: Approve Abstain – with reason stated Do not approve Artifacts may be found at: iwg.wikispaces.com/Test+Artifacts+Harmonizationhttp://exchange- iwg.wikispaces.com/Test+Artifacts+Harmonization

Harmonization Activity Status

8

Direct Harmonization: Deployment Models Deployment models: EHR-HIE Test Spec identifies actors: assumes specific deployment models ONC Test package: agnostic Direct Project specifications do not specify a model Issues: Specifying a deployment model may restrict testing or add requirements outside the scope of the specs Solution: Present EHR-HIE Test Spec deployment models and actors as examples of implementation models Map EHR-HIE Test Spec deployment models to our use cases Show the outliers (what they are testing that is not in our scope)

Harmonization: Modular Approach (PD-QD-RD) End User Auth TC 1 TC 2 TC 3 PD PD 1 PD 2 PD 3 QD QD 1 QD 2 QD 3 RD RD 1 RD 2 RD 3 Messag e Render MR1 MR2 MR3 EHR-HIE Applicant  Production Participant Messagin g & Auth TC 1 TC 2 TC 3 Event-Based Interop Testing TC 1 TC 2 TC 3 PD 1 PD 2 QD 1 RD 2 TC 1 TC 2 MR1 MR3 MR2

Harmonization: Modular Approach (Direct) End User Auth TC 1 TC 2 TC 3 Direct Messagi ng DM1 DM2 DM3 Cert Discove ry CD 1 CD 2 CD 3 Messag e Render MR1 MR2 MR3 EHR-HIE Applicant  Production Participant Deplmnt A Reqts A1 A2 A3 Event-Based Interop Testing TC 1 TC 2 TC 3 DM1 DM2 CD 1 CD 2 A1 A2 MR1 MR3 MR2 Deplmnt B Reqts B1 B2 B3 DM3 CD 3 A3 Deplmnt X Reqts X1 X2 X3

Automating Test Case Execution Messaging & Auth Modular: New scripts for each web service Some test cases implicitly covered by test cases in core specs Testing invalid SAML assertions Critical to exchange security Probably can’t be executed using CONNECT as test tool

Automating Test Case Execution Direct NIST: Direct messaging tool in development ONC Test: Prototype Direct Cert Discovery tool September 2012: Incorporated into NIST/ONC-Cert MU2 Test Procedures

Automating Test Case Execution: soapUI scripts complete

‘round-the-room What risks or other concerns do you have at this point in the process related to the harmonized test cases or automation approach?

Open Discussion

RFP released — July 2nd Questions received by 6 organizations Answers distributed — July 13th Bids due — July 20th Expected award — August 15th Contract start — TBD Schedule Review 18 We are here