Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.

Slides:



Advertisements
Similar presentations
1 Revisions to M2 and RT Final Component of UFTA CWG/MCWG ERCOT Public January 22, 2014.
Advertisements

Zonal ADR Resettlement & Data Retention ERCOT CSWG 04/20/2015.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
ERCOT Billing, Settlement Disputes & Data Extracts
Commodities Futures Trading Commission (CFTC) Exemption Proposals for Settlements and Billing Changes COPS June 14, 2011 Cheryl Yager, Mandy Bauld, Leslie.
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
Next Steps to Reduce the RTM Settlement Timeline August 29, 2013 COPS Workshop Update to TAC Harika Basaran COPS Chair September 5, 2013.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Real Time Settlement Timeline Workshop Debrief To TAC 11/29/2012 Evaluation and consideration of reducing the RT Settlement Timeline Jim Galvin- CSWG Chair.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
SEWG R EPORT TO COPS Jim Galvin- Chair, Settlements and Extract Working Group.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
10/11/2011 COPS Schedule for Upcoming Resettlements ERCOT Mandy Bauld.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
ESI IDs Retired in Error! RMS – August 10, 2005 Discussion.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 UFE Workshop Sponsored by COPS October 19, 2004.
COPS conference call PRR 638 Implementation COPS January 30 th 2006.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
1 RMS Update By Don Bender January 9, RMS Approved Resolution Upon TAC approval, suspend further True-up settlements for True-up resettlement.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
Nodal Market Settlement and Invoicing Timeline ERCOT COPS Meeting January 9, 2006 Eric Woelfel, Formosa Utility Ventures Jim Galvin, Tenaska Power Services.
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013.
PRR 568 – Day 17 to Day 10 Analysis Implementation Recommendation TAC December 2005.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Real Time Settlement Timeline Workshop Evaluation and consideration of reducing the RT Settlement Timeline Harika Basaran- COPS Chair Jim Galvin- CSWG.
Proposed Timeline for Extract, Variances, True-Ups Extracts 10/1/03 Clear all “old” extracts from Portal 9/26/03 Post last “old” daily extract 10/6/03.
PRR 568 – Settlement Timeline September day Analysis COPS October 25, 2005.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Retail Workshop ERCOT Nodal Update October 06, 2010.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
TAC Report to the ERCOT Board
Settlement Timeline Workshop
Profiling Working Group
COPS MAY 2014 UPDATE TO TAC 5/29/2014
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Presentation transcript:

Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE

2 Why are we talking about this? –Multiple parties are interested in reducing the RTM Settlement timeline to help Reduce collateral requirements Reduce risk of uplift –The NPRR347 and NPRR391 invoicing and payment timeline changes shortened the total billing cycle by ~10-13 days –Previous efforts made minimal change to the timeline for posting the RTM Statement

3 Refresher – Current Settlement Timelines Day-Ahead MarketReal-Time Market Statement Post DateOD + 2OD + 9 Invoice Post DateOD + 2OD + 14 to 24 Invoice Due DateOD + 5OD + 21 to 30 Invoice Payout DateOD + 6OD + 22 to 31 Invoice FrequencyBusiness DailyWeekly Current Protocol Requirements: Day-Ahead MarketReal-Time Market Statement Post DateOD + 2OD + 9 Invoice Post DateOD + 2OD + 9 Invoice Due DateOD + 4OD + 11 Invoice Payout DateOD + 5OD + 12 to 18 Invoice FrequencyBusiness Daily After November 2012 Implementation (NPRR347 & NPRR391) : Note: The timelines are stated generally in relation to the Operating Date and do not reflect all variations due to holidays and bank holidays.

4 High-Level Considerations The existence and magnitude of the impacts mentioned below depends entirely on the extent of the reduction to the settlement timeline Quality of Market Settlements –Potential impacts to data availability and accuracy: Unavailable input data Inability to perform manual settlement calculations Minimized data validation Limited time for issue resolution Staffing Impacts –Potential impacts to support weekend and holiday workloads and/or to execute existing functions in shorter period of time

5 Data Considerations Increasing availability of AMS data is not the only data consideration. Various types of data is required for RTM settlements: –Load Data Usage is estimated if not available for use in the initial Data Aggregation process (OD + 7) Approximately 70% of August 2012 initial settlement load was based on actuals AMS (40%), Competitive IDR (24%), NOIE (26%), and NIDR (10%) all need to be considered –Generation Data Current processes strive to have the data available for use in the initial Data Aggregation process (OD+7) ERCOT performance indicators require no more than 1% change after initial settlement –Markets & Operations Data Current processes complete the transfer data to the settlement system by end of day on OD+1. Prices are not considered final until 1600 of the next Business Day after the Operating Day (6.3 (4)) Energy trades can be entered as late as 1430 on OD +1 (4.4.2(3)) –Manual Calculations or Data changes Utilize upstream data and complete prior to use in settlement (OD+8) Examples include: emergency energy settlements (manual overrides, QSGR dispatch, SCED failure), processing VDIs, processing price corrections, and other ad-hoc data correction

6 RTM Settlement Timeline What’s next? –CWG quantifying the credit benefit –Request COPS to determine its next step. As a starting point, COPS may want to consider efforts to: –Review the benefits described by CWG –Define the scope of the effort »Commissioner Anderson stated interest in a “material reduction” to the timeline. CWG is discussing an option of OD+3. Suggest that analysis includes discussion of an OD+3 option so that we are prepared with a specific response regarding considerations and feasibility of this option. »Identify the availability timelines for all data and any opportunity for improvements (TAC discussion) –Define guiding principles –Define options –Identify and document the impacts of each option on each segment (people, processes, technology) –Develop a recommendation ERCOT can help facilitate the COPS effort and documentation of the findings Other?

7 February 10, 2009 APPENDIX

8 Data Considerations Type% of ERCOT Load * % Available on initial settlement * Interval Basis Data Typically Settlement- Ready ASSUMPTIONS about Impacts and Challenges AMS39.6%39.3%15-min+4 to+6-A reduced timeline would narrow the window for data submission, and correction if necessary, for use on initial settlement. -Experience indicates that TDSPs target complete and accurate data submission for use on initial settlement. -TDSPs – what would be the impact to maintain similar levels of actual data on initial settlement? Would there be impact to staffing or business processes on weekends and/or holidays? COMP_IDR23.9%3.8%15-minMonthly-Submittal based on TDSP monthly read cycles. Shortening the timeline will reduce available data based on the TDSP monthly read cycles. NOIE26.5%24.8%15-min+6-A reduced timeline would narrow the window for NOIE data activities prior to use on initial settlement. -Experience indicates that NOIEs target complete and accurate data submission for use on initial settlement. -NOIEs – what would be the impact to maintain similar levels of actual data on initial settlement? Would there be impact to staffing or business processes on weekends and/or holidays? NIDR10.0%1.7%Monthly - Submittal based on TDSP monthly read cycles. Shortening the timeline will reduce available data based on the TDSP monthly read cycles. -NIDR represents a decreasing share of the ERCOT load, but assuming that NIDR will not drop to a 0% share Total100%69.6% Load Data Availability * Percentages reported for August 2012

9 Data Considerations Generation Data Availability % Accurate and Complete on Initial Settlement (target and stretch KPIs) Data Received VEE Complete and Issues Resolved Data Used in Settlement ASSUMPTIONS about Impacts and Challenges ERCOT Polled Settlement Meters 99% % To maintain similar standards of data availability and accuracy on initial settlement, it is reasonable to assume that there may be ERCOT staffing impacts to execute business processes on weekends and/or holidays. -TDSPs - what would be the impact to maintain similar standards of data availability and accuracy on initial settlement? Would there be impact to staffing or business processes on weekends and/or holidays?

10 Data Considerations Settlement Calculations ASSUMPTIONS about Impacts and Challenges Accuracy on initial settlements-Current systems and processes transfer markets and operational data to the settlement system at various times through the day after the Operating Day. Timelines for upstream data availability and integration into the settlement system will be a limiting factor. Impact to integration activities would be relative to the magnitude of the reduction of the timeline. -Certain settlement activities are handled on a manual basis prior to initial settlement. Examples of such processes that may be impacted include but are not limited to: emergency energy settlements for emergency base points or non-economic dispatch on a daily basis, price corrections on an ad-hoc basis, or data integration issues on an ad-hoc basis. Impact to settlement accuracy or completeness would be relative to the magnitude of the reduction in the timeline. -If an additional settlement iteration is incorporated into the settlement schedule, it is reasonable to assume that there may be staffing and procedural impacts to ERCOT. -QSEs/CRRAH – what would be the impact to support an additional settlement iteration? What is the impact of settlement is not “complete” on the first iteration?

11 History of Settlement Timeline Posting Date for Initial Settlement Statements Effective Period OD + 3August 2000 – March 2002 OD + 17March 2002 – January 2006 OD + 10January November 2011 OD + 9December current

12 Other Markets –Generally speaking, the FERC-jurisdictional ISOs/RTOs settle to cash clearing within 14 days –Specific timelines vary across the ISOs/RTOs