1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, 23 - 25 January 2008.

Slides:



Advertisements
Similar presentations
Collimation in the ILC BDS Carl Beard ASTeC Daresbury Laboratory People Requirement Recent Successes Future Aims.
Advertisements

HiRadMat Beryllium thermal shock test Kavin Ammigan PASI 2 nd Annual Meeting RAL, UK April 2013 Contributors: P. Hurh, B. Hartsell.
08/01/2007Juan Luis Fernandez-Hernando End Station A Measurements on Collimator Wakefields 4th Wakefield Interest Group - CI 05/03/2008 Luis Fernandez-Hernando,
Jonathan Smith, LC-ABD, 12 th April 07, RHUL 1 Towards Improved Collimation for the ILC Jonathan Smith (Lancaster University/Cockcroft Institute)
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
R.M. Jones (University of Manchester/Cockcroft Inst.) on behalf of CLIC Collaboration., ESTB Workshop, SLAC, 17 th March Collimator Wakefield Measurements.
Wakefield Implementation in MERLIN Adriana Bungau and Roger Barlow The University of Manchester ColSim meeting - CERN 1-2 March 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
The Compendium of formulae of kick factor. PLACET - ESA collimation simulation. Adina Toader School of Physics and Astronomy, University of Manchester.
ILC BDS Collimation Optimisation and PLACET simulations Adina Toader School of Physics and Astronomy, University of Manchester & Cockcroft Institute, Daresbury.
ILC BDS Collimation Optimisation and PLACET simulations Adina Toader School of Physics and Astronomy, University of Manchester & Cockcroft Institute, Daresbury.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Plans for collimator survival and SLAC tests J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, January 2008.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Beam Delivery System collimators for the International Linear Collider J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Collimator design and short range wakefields Adriana Bungau University of Manchester CERN, Dec 2006.
2 nd EuroTeV Annual Meeting, Daresbury 9 th January 2007 WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, CCLRC Daresbury Laboratory.
Collimator wakefields - G.Kurevlev Manchester 1 Collimator wake-fields Wake fields in collimators General information Types of wake potentials.
Slide 1 FP7: Collimator Wakefields program Building on the achievements in EuroTeV to provide a comprehensive system of knowledge of wakefield effects.
Beam Delivery System collimators J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Collimation for the Linear Collider, Daresbury.1 Adam Mercer, German Kurevlev, Roger Barlow Simulation of Halo Collimation in BDS.
ILC-BDS Collimators - Simulation and Experiment Adriana Bungau The University of Manchester Group Annual Meeting December, 2007, Manchester Adriana Bungau.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
Nigel Watson / Birmingham CollimationCollimation EDR to specify and find optimal solutions for  Damage survival, 2 (1) bunches at 250 (500) GeV  Jaw.
Issues in Simulating the Effects of Wakefields Roger Barlow LET Workshop 13 th December 2007.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
G.Kurevlev - Daresbury meeting Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
Russian Research Center” Kurchatov Institute” Shock wave propagation near 450 GeV and 7 TeV proton beams in LHC collimator materials Alexander Ryazanov.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Nigel Watson, 17 Nov 2008 ILC08/LCWS08 FNAL ILC: Beam Delivery System Collimation System Outline Comments on changes since EDR plan Nigel Watson / Birmingham.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Jonathan Smith, 27 th August 2008, Uppsala 1 Optimal Collimators for the ILC Jonathan Smith (Lancaster University/Cockcroft Institute)
Jonathan Smith, COLSIM, 4 th December, CERN 1 GdfidL Simulations of ESA Prototype Collimators Jonathan Smith (Lancaster University/Cockcroft Institute)
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Wakefield effect in ATF2 Kiyoshi Kubo
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
G.Kurevlev - Manchester meeting1 Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
Jonathan Smith, European LCW, 8 th January 2007, Daresbury 1 GdfidL Simulations of ESA Prototype Collimators Jonathan Smith (Lancaster University/Cockcroft.
Towards Improved Collimation for the ILC
Status of Collimator Damage Studies
Experimental tests of wakefields and material damage for ILC spoilers
Radiation damage simulations for CLIC and ILC spoilers and ATF tests
Design and testing of the Beam Delivery System collimators for the International Linear Collider J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
Collimator design and short range wakefields
PLACET collimator studies
2th EuCard Col/Mat WP Meeting
CLIC Undulator Option for Polarised Positrons
Beam Optics Set-Up at SLAC End Station A
Nigel Watson (Birmingham) LAL, 16-May-2006
RC1 Prototype Conceptual Design Review 15 December, 2005
Presentation transcript:

1 Collimator Design Adriana Bungau The University of Manchester, UK Annual EuroTev meeting - Frascati, Italy, January 2008

2 Content - Introduction - SWMD collaboration - Collimator design - requirements - Wakefield Measurements at SLAC-ESA - T480 experiment (collimators, beam parameters) - data analysis - Collimator Damage Tests at ATF - test plan - schedulle - test equipment - Conclusion

3 People - SWMD collaboration Birmingham: N.Watson, M Slater SFTF: L.Fernandez, G.Ellwood, J.Greenhalgh, B.Fell, S. Appleton CERN: G.Rumolo, D.Schulte, A.Latina Lancaster : D.Burton, J.Smith, R.Tucker Manchester : R.Barlow, A.Bungau, R.Jones Darmstadt : M.Karkkainen, W.Muller, T.Weiland Also: a strong collaboration with SLAC (S.Molloy and M.Woods) for wakefield beam tests and KEK for collimator damage.

4 Requirements Significant problems: - short-range wakefields ->lead to emittance dilution and beam jitter at the IP - impact of a no of high density bunches can damage the spoilers 1. Spoiler geometry must reduce the wakefields to an acceptable level - long, shallow tapers of ~20 mrad, - short flat upper section of 0.6 r.l. - high conductivity surface coating the wakefield aspects of the design are addressed by experimental work centered around T480 project at SLAC-ESA and simulations with Gdfidl, Echo, Merlin, Placet (see Daniel’s talk) 2. Spoilers are required to survive 1 bunch at 250 and 2 bunches at 500 GeV - use bulk material to minimise fractures, stress but optimal for heat flow - long path length for errant beams striking spoilers (large r.l : graphite, beryllium etc) the design approach consider simulations with FLUKA, Geant4, EGS4, ANSYS and experimental work at KEK 0.6 r.l 20 mrad

5 T480 experiment at SLAC-ESA

6 Beam Parameters at SLAC ESA and ILC ParameterSLAC ESAILC-500 Repetition Rate10 Hz5 Hz Energy28.5 GeV250 GeV Bunch Charge2.0 x Bunch Length 300  m Energy Spread0.2%0.1% Bunches per train1 (2*)2820 Microbunch spacing- (20-400ns*)337 ns Beam size: 100 um vertically mm longitudinally Wakefield tests at SLAC-ESA Aim: measure the beam kick and compare it with theoretical predictions and simulations

7

8

9 Designed Collimators

10 T480 “wakefield box” ESA beamline

11 Wakefield Box - readings from each BPM were recorded together with the bunch charge and energy - the kick was determined by performing a straight line fit to the upstream BPM and a separate one to fit the downstream ones - the kick was calculated as the difference in the slopes of these fits

12 Col. 12  = 166 mrad r = 1.4 mm Angular kick (V/pC) Collimator y (mm) T480 (prelim.) 2007 data T480 (prelim.) 2007 data Luis Fernandez - Daresbury Data analysis

13 Col. 1 Col. 3 L=1000 mm  = 324 mrad r = 2 mm  = 324 mrad r = 1.4 mm Col. 12  = 166 mrad r = 1.4 mm Col. 6  =  r = 1.4 mm (r = ½ gap) Luis Fernandez - Daresbury

14 Collim No Experimental measurements (V/pC/mm) Gdfidl calculations (V/pC/mm) Analytic predictions (V/pC/mm) 3-D Modeling prediction kick (V/pC/mm)                                 1.50 Measured and calculated kick factor Note: quoted errors are estimates

15 Collimator Damage Experiment at ATF

16 Previous simulations Luis Fernandez - DL Aim: the collimators can be damaged by the impact of several bunches

17 Stress wave George Ellwood - RAL

18 First run at ATF - commisioning of the vacuum vessel, multi-axis mover, beam position and size monitors - validate the mode of operation required for ATF tests - measurement of the size of the damage region after individual beam impacts on test target (validation of FLUKA/ANSYS simulations of properties of material) - ensure that the radiation protection requirements can be satisfied Next phase at ATF2 - measure the shock waves within the sample (VISAR or LDV) for single bunch and multiple bunches at ~ILC bunch spacing Purpose of the ATF test

19 ATF Schedule February: 1st week - mover commisioning at RAL 2nd week - installation at KEK 3rd week - testing readout of beamline instrumentation 4th week - measurement of samples - shock wave measurements are planned at ATF2

20 Test location

21 Sample Target we would like to use a 100µm thick Ti-6Al-4V sample. the sample will probably be held between knife edge grips, similar to those illustrated. we could leave the top of the sample free from the grips. Grip Exposed edge of sample

22 Reference Location y x Beam does not touch sample. No signal from detector 1 y x Move sample in Y until beam is in contact. Signal from detector. 2 y x Move sample in X until beam is no longer in contact. No Signal from detector 3

23 Beam operation Move sample in X & Y until sample is in required location. Increase charge to damage sample. y x 4 Once the reference edge has been found we will use the VG manipulator to step the sample a known distance in X and Y. We will then increase the charge and try to damage the sample. Then we will move the sample to a new location and try to damage with a different charge. We will continue to do this until we have performed all the planned tests.

24 Bunch  x  y (  m 2 ), material Estimated damage region, x Estimated damage region, y Estimated damage region, z 1.9  0.5, Ti alloy11 (14)  m4 (5.6)  m 5 (8) mm 20  2, Ti alloy45 (90)  m5 (9)  m 2 (7) mm Fluka Predictions Luis Fernandez - Daresbury - after testing, we intend to measure the are of damage of each impact with a Scanning Electron Microscope - we will know the location of each damaged region because know the distance from the reference edge. - this will help validate our predictions on beam damage.

25 SWMD: Deliverable Summary “Engineering design for ILC mechanical spoiler, including prototype evaluations of wakefield and beam-damage performance.”  Wakefields: T480 at SLAC to evaluate wakefield performance of candidate spoiler designs, benchmarking calculations/modelling  16 jaw designs studied  Beam damage: detailed simulations of beam damage to spoiler jaws, including transient shockwave effects  Achieved designs which satisfy beam damage requirements  Phase 1 of beam test to verify modelling, starts at ATF 18 Feb  Outcome of ongoing wakefield optimisation likely to require further iteration on candidate designs  First conceptual design for mechanical spoiler design available, to report at EPAC’08.

26 1)Specification of requirements for LC spoilers - Complete  Eurotev Report and ILC RDR 2)Report on applicability of bench tests for ILC collimator design - Achieved  Initial report EPAC’06/EUROTeV Report  2007 work  method not suitable for quantitative tests of collimator jaws, had been identified as risk in EUROTeVAnnex I (amended).  Final report in preparation. 3)3D simulation of wakefields for various candidate spoiler prototypes - Achieved  For 16 ESA collimators, most recently using non-conformal moving mesh GdfidL  Also for ECHO-3D at EPAC’06  Additional mesh dependence studies ongoing, esp. for smallest  z  PAC’07, EPAC’06, EUROTeV-Reports (GdfidL) and (MAFIA) 4)Parametrised wakefield characteristics of spoilers for full simulation of the BDS  See COLSIM WP SWMD: Deliverables Summary

27 SWMD: Deliverables Summary 5)Report on wakefield beam tests - Achieved  Analysis of 2007 and 2006 T480 data for publication in progress, including:  BPM uncertainties/calibrations, bunch length monitoring  Original plan was to use SCP and established instrumentation See PAC’07, EPAC’06, EUROTeV Reports , , )ECHO-3D: new code suitable for LC regime (long structures, short bunches), with predictions verified by experimental data  No public version so far 7)Report on spoiler damage estimates and comparison with test beam data – Partially achieved  Simulations carried out with Fluka, Geant4 (+EGS with Keller), see EPAC’06 and EUROTeV Reports and  FEA studies in ANSYS3D/Fluka of transient stress waves, see PAC’07, EPAC’06  ATF beam test approved, see PAC’07, scheduled for run 18 Feb )Optimal spoiler design to achieve requirements – Partially achieved  We have designs for material and geometry which can satisfy beam damage requirements  Outcome of ongoing wakefield optimisation likely to require further iteration on candidate designs  First conceptual engineering design produced

28 2mm depth10mm depth 250GeV 111  9 µm GeV 80  6 µm GeV 111  9 µm GeV 80  6 µm 2 Ti420 K870 K850 K2000 K Al200 K210 K265 K595 K Cu1300 K2700 K2800 K7000 K C+Ti325 K640 K380 K760 K Be+T i K C+Ti290 K575 K295 K580 K C+Al170 K350 K175 K370 K C+C u 465 K860 K440 K870 K C+Ti300 K580 K370 K760 K Temperature increase from 1 bunch impact Exceeds: melting temp. Best candidate designs fracture temp. Previous Simulations beam Made most detailed Simulations of spoiler jaw damage to date. Made most detailed Simulations of spoiler jaw damage to date. heated zone compressive waves Reflected tensile waves reflected shear waves beam collimator beam Aim: quantify collimators damage from impact of several bunches