East Texas Export Limit ERCOT Operations Planning ERCOT Market Presentation 11-06-2013.

Slides:



Advertisements
Similar presentations
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Advertisements

Discussion: Use of RAPs in system operations Kris Dixit 1.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
West Texas Congestion Chad Thompson Congestion Management Working Group August
Real-Time Transmission Congestion Management & Market Effects
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
Peak RCCo Performance Metrics Draft –November 2013.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
ERCOT and Utilicast Public Document ERCOT Board of Directors Meeting April 22, 2009 Nodal Program Oversight Report 10 – Infrastructure.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
VRT Study Update José Conto ERCOT System Planning.
1Texas Nodal Nodal Day-Ahead Market Update Special NATF Meeting July 19, 2010.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
© Property of ERCOT 2001 ERCOT Limit Calculation Process John Adams Operations Engineer.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
MISUG Meeting Materials ERCOT 02/14/ Agenda 02/14/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m Accomplishments.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
Page 1 TAC Program and Projects Update March 6, 2003.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Integrated Release Approach and Update TPTF 11/10/2008 Matt Mereness.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
Lead from the front Texas Nodal 1 Resource Node Locations WMS Subgroup Meeting.
Panhandle Renewable Energy Zone (PREZ) Study
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Role of Account Management at ERCOT Market Engagement and Readiness (MER) Training Update TPTF Meeting April 1 st, 2008 Market Education.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
EDS 2 Early Delivery Systems Approach March 2007.
Nacogdoches to Lufkin SS 345 kV Line Project
Transmission Planning in ERCOT- Overview
Texas Nodal Market Go-Live Procedure
Barrilla Junction Area Transmission Improvements Project
Phase Angle Limitations
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presentation transcript:

East Texas Export Limit ERCOT Operations Planning ERCOT Market Presentation

Outline Basis for GTL Study Results ERCOT steps to implementation

Stability limit Overview Clearances can create a stability limit. –N-1 in the base case + single-line-to-ground fault breaker stuck event

SOP-110 Overview Under planned or forced 345kV outages. Outages –Martin Lake – Tyler Grande 345 kV –Tyler Grande – TriCorner 345 kV –Martin Lake – Shamburger 345 kV –Shamburger – Royce 345 kV –Martin Lake – Elkton 345 kV –Elkton – Forney 345 kV –Martin Lake – Stryker 345 kV –Stryker – Trinidad 345 kV –Mt. Enterprise – Trinidad 345 kV

SOP-110 Overview GTL Limit 345-kV Line OutageInterface Limit Martin Lake – ShamburgerInterface Flow* less than 1900 MW Martin Lake – Tyler GrandeInterface Flow less than 1900 MW Mt. Enterprise – TrinidadInterface Flow less than 1900 MW Martin Lake – ElktonInterface Flow less than 2300 MW Martin Lake – StrykerInterface Flow less than 2300 MW Tyler Grande – TriCornerInterface Flow less than 2300 MW Shamburger – RoyseInterface Flow less than 2300 MW Elkton – ForneyInterface Flow less than 2300 MW Stryker -- TrinidadInterface Flow less than 2300 MW *The interface is consisted of six 345-kV lines: MartinLake – Shamburger, MartinLake – TylerGrande, MartinLake – Elkton, MartinLake – Stryker, MtEnterprise – Trinidad, MtEnterprise – Nacogdoches

SOP-110 GTL Overview GTL Limit An Interface has been tested in the EMS to verify ERCOTs ability to monitor the flows

SOP-110 GTL Overview GTL Limit ERCOT TCM has been tested to ensure the interface can be passed to SCED with the relevant shift factors. SCED processing has been confirmed via testing. Active and Inactive Network Security Constraints were checked and this will be posted in MIS when the constraint is active.

SOP-110 GTL Overview GTL Limit

SOP-110 GTL Overview Total generation capacity: 3250 MW Any one of nine 345kV line outages listed in the SOP- 110 will enforce the limit.

GTL steps taken ERCOT worked with Oncor in 2012 to reduce the breaker time from 14 cycles to 10 cycles for the critical contingency. Generator has provided updated dynamic model and GSU limits for units. ERCOT Planning completed study with limit provided to Ops Ops has built the interface and tested it.

GTL next steps ERCOT presentation to CMWG. Post GTL for comments. Target GTL implementation date of Dec