RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Machine - Experiments January 12, 2005 Machine status.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Luminosity Optimization for FCC-ee: recent results
LHC (SSC) Byung Yunn CASA.
Summary Thursday h21: Stable beams fill #1303.
Proposal for a CESR Damping Ring Test Facility
MEIC New Baseline: Luminosity Performance and Upgrade Path
Presentation transcript:

RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12

Outline Startup schedule Improvements for Run 12 – Further LLRF commissioning – 9 MHz – Luminosity Slight reduction in beta* (100 GeV) Emittance measurement, reduction and maintenance – Polarization Source improvements (Einzel lens + suppression tune) Store energy change (250 GeV polarization lifetime) Emittance improvements Possible ramp transmission improvements (100->250 GeV) Lattices and projection

Start Up Outline Jan 3-9: Successful, addressing outstanding items now Jan 17 : Start of final cooldown Jan 21: Earliest injection into blue Followed by 9 MHz capture Instrumentation setup Jan 24: Yellow injection Followed by 9 MHz capture Instrumentation setup Sat Jan 28: Power supplies ready for ramp Actual readiness for ramp depends on LLRF progress Beam-to-flattop time expected to be short (~ 1 ramp) by Friday Feb 3: Midnight shift collisions (day/eve still development) week of Feb 6: Final ramp up and into production with 100 GeV

RF: Low-level Addresses problems from last year: reliability, emittance growth – 9 Mhz bouncer feedback loops improved for less noise – ‘bunch-gating’: will allow bunch-to-bucket phase feedback during injection, preserves emittance while sitting at injection Independent control of AGS extraction energy for extraction to blue/yellow – 9 MHz matching very sensitive to energy error I expect this to be the pacing item for startup

RF: High level - 9 MHz Cavity Burned up spring fingers Loose linkage in tuning servo Two source of downtime in Run 11: 1.Mechanical linkage in the tuning servo of the 9 MHz cavity was loose. This was very hard to trouble shoot 2.High-level rf failure (spring fingers) Loose linkage slowed the startup/ramp Burned RF spring fingers caused the version to 28 MHz ramps in the last week of the run Both issues resolved. RF shield redesigned to eliminate hot spot We will start Run 12 with the 9MHz cavity Rebucketing to 28 MHz at store and squeeze with 197 MHz

Emittance Monitoring Vertical emittance in AGS is difficult to measure/maintain (near integer) New dipole installed to measure the (rapidly changing) optics immediately at the IPM through the cycle – Can better quantify growth at injection – Maybe can identify growth on the ramp Similar method available for optics measurement in RHIC New flags installed in AtR for precision measurement of transfer optics – Addresses discrepancy between blue and yellow transmission and possible emittance dilution at RHIC injection

Emittance: Consistency If the Run 11 ZDC calculated emittances were capped at their MEDIAN value, that is a 10 % decrease in average emittance. 20 % increase in luminosity, just from consistently meeting a relatively weak constraint. More precise measurement and monitoring will help (from lumi)

Polarization Transmission in RHIC Acceleration of beam from 100 GeV to 250 GeV and back to 100 GeV suggests 10 % (absolute) polarization loss between 100 and 250 GeV. The mechanism for the remaining loss is not well-understood and continues to be studied with tracking. Not a clear step down at the location of an identifiable resonance

Possible RHIC Polarization Loss Mechanisms Sub-optimal store energy: polarization lifetime (loss of 5%, absolute, during 250 GeV store) Transverse coupling during the ramp – Global coupling appears well-corrected – Fast local coupling measurement for Run Hz orbit oscillations – Feedback on the ramp demonstrated with Au in Run 11 Vertical dispersion – Primary source is our own coupling correction, new correction algorithm to be tested in Run 12

Ramp coupling Betatron frequency Horizontal Vertical BlueYellow GeV

Orbit oscillations at 10 Hz Vertical position (um) Time since ramp start (s) Mechanical vibration of triplet quads causes transverse position oscillations. Horizontal change is of order 2-3 mm, but 200 um (peak-to-peak) in vertical --- Feedback off --- Feedback on Feedback routinely used at store through Run 11, demonstrated effective on the ramp only at the end of Run 11 during the heavy ion run.

RHIC 100 GeV Polarized Proton Parameters ParametersRun 12 Goal Interaction points6 8  * in blue [m] 0.85  * in yellow [m] 0.85 Working points (ramp and store)28.695, Luminosity/Week10 pb -1 (max) Polarization (Jet)60-65% Peak bunch intensity 1.35  Peak luminosity 0.5  cm -2 s -1 No tune swing Down from 1 m in Run 9

RHIC 250 GeV Polarized Proton Parameters ParametersRun 11 AchievedRun 12 Goal Interaction points6 8 (AnDY test at 2)6 8  * in blue [m]  * in yellow [m] Working points Ramp: (28.680, ) Store: (28.69, 29.68) Ramp: (28.680, ) Store: (28.69, 29.68) Luminosity/Week25.4 pb -1 (the best, 4/5-12)40 pb -1 (max) Polarization (Jet)46%*~50% Peak bunch intensity 1.65  Peak luminosity 1.6  cm -2 s  cm -2 s -1 *Average of jet polarization is 46% for both rings. Taking into account for the polarization profile correction factor (R=0.2), The polarization seen by experimenters is boosted by Sqrt(1+R)=> 50%.