Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
Operations Management R. Dan Reid & Nada R. Sanders
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Short-Term Scheduling Chapter 15.
Operations Management
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling Operations Scheduling Chapter Scheduling The Hierarchy of Production Decisions The logical sequence of operations in factory planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Scheduling Operations
Chapter 15 Scheduling McGraw-Hill/Irwin
CHAPTER 8 Operations Scheduling
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Chapter 17 Scheduling

Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment procurement Aggregate Planning 1. Facility utilization 2. Personnel needs 3. Subcontracting Master Schedule 1. MRP 2. Disaggregation of master plan Long-term (Chapter 5) Intermediate-term (Chapter 14) Short-term (Chapter 17) Intermediate-term (Chapters 14 and 15) Short-term Scheduling 1. Work center loading 2. Job sequencing

Management 3620Chapter 17 Schedule17-3 The Scheduling Problem Have the correct amount of resources at the right time and in the right place THE CHALLENGE Meet the job’s due date – customer service Utilization of the organization’s resources - productivity

Management 3620Chapter 17 Schedule17-4 Build A A Done Build B B Done Build C C Done Build D Ship JANFEBMARAPRMAYJUN On time! Scheduling Manufacturing Operations High-volume Intermediate- volume Low-volume Service operations

Management 3620Chapter 17 Schedule17-5 Work Center #1Work Center #2 Output High-Volume Systems Flow system: High-volume system with standardized equipment and activities Flow-shop scheduling: Scheduling for high-volume flow system –line balancing (Chapter 6) –design of work systems (Chapter 7)

Management 3620Chapter 17 Schedule17-6 High-Volume Success Factors Process and product design Preventive maintenance Rapid repair when breakdown occurs Optimal product mixes Minimization of quality problems Reliability and timing of supplies

Management 3620Chapter 17 Schedule17-7 Intermediate-Volume Systems (1 of 2) Outputs are between standardized high-volume systems and made-to- order job shops Three basic issues –run size of jobs –timing of jobs –sequence in which jobs should be processed

Management 3620Chapter 17 Schedule17-8 Intermediate-Volume Systems (2 of 2) Economic run size Base production on a master schedule developed from customer orders and forecasts of demand

Management 3620Chapter 17 Schedule17-9 Low-Volume Systems A variety of unique (customized) jobs arrive at the shop Someone must analyze each job regarding its routing (which work centers it will be required to visit), and the required amount of resources needed at each work center Typically the customer is told when the job will be finished (due date) The jobs are moved through the required work centers as each becomes available according to a scheduling system

Management 3620Chapter 17 Schedule17-10 Scheduling Low-Volume Systems Loading - assignment of jobs to process centers Sequencing - determining the order in which jobs will be processed

Management 3620Chapter 17 Schedule17-11 Loading Approaches (1 of 2) Infinite loading –assumes capacity of a work center is infinite –priority sequencing rule then used –managers may need to respond to capacity overload conditions

Management 3620Chapter 17 Schedule17-12 Loading Approaches (2 of 2) Finite loading –projects the starting and stopping times of each job at each work center –takes into account capacities of each work center and the processing times of jobs so that capacity is not exceeded In special cases, an algorithm such as the assignment method may be used

Management 3620Chapter 17 Schedule17-13 Everything is #1 Priority Sequencing Determine the order in which jobs waiting at a work center will be processed One approach is to use priority rules (simple heuristics) to select the order in which jobs waiting in line will be processed

Management 3620Chapter 17 Schedule17-14 Examples of Priority Rules FCFS - first come, first served SPT- shortest processing time DD- due date CR- critical ratio

Management 3620Chapter 17 Schedule17-15 Examples of Performance Measures (1 of 2) Job flow time – the length of time a job is in the shop at a particular workstation; includes processing time, wait time, transportation time Average job flow time – the sum of the flow time for each job in a group divided by the number of jobs Makespan – total time needed to complete a group of jobs

Management 3620Chapter 17 Schedule17-16 Examples of Performance Measures (2 of 2) Job lateness – the length of time the job completion time is expected to exceed the time the job is due Average lateness – the sum of the lateness for each job in a group divided by the number of jobs Average number of jobs – average work-in-process for a group of jobs; total flow time divided by makespan

Management 3620Chapter 17 Schedule17-17 Example 2, FCFS

Management 3620Chapter 17 Schedule17-18 Two Work Center Sequencing Johnson’s Rule –technique for minimizing completion time for a group of jobs to be processed on two processes or at two work centers. –minimizes total idle time of the two processes Several conditions must be satisfied

Management 3620Chapter 17 Schedule17-19 Johnson’s Rule Conditions Job time must be known and constant Job times must be independent of sequence Jobs must follow same two-step sequence (flow shop) Job priorities cannot be used All units must be completed at the first work center before moving to second

Management 3620Chapter 17 Schedule17-20 Example Problem first last

Management 3620Chapter 17 Schedule17-21 Gantt Chart Used as a visual aid for loading and scheduling Purpose is to organize and clarify the actual or intended use of resources in a time framework Two most commonly used types –load chart –schedule chart

Management 3620Chapter 17 Schedule17-22 Figure 17-2 Gantt Load Chart

Management 3620Chapter 17 Schedule17-23 Example Problem first last C A D B Data Entry Verify time

Management 3620Chapter 17 Schedule17-24 Scheduling Approaches Forward scheduling –scheduling ahead, from some point in time Backward scheduling –scheduling by working backward from the job’s due date

Management 3620Chapter 17 Schedule17-25 Input/Output Control Used to manage work flow so that queues and waiting times are kept under control Input to a work center is compared to the output of that work center for some time period An imbalance indicates management should investigate

Management 3620Chapter 17 Schedule17-26 Service Operation Problems Cannot store or inventory services Customer service requests are random Scheduling service involves –Customers –Workforce –Equipment Duh! Where’s Dilbert?

Management 3620Chapter 17 Schedule17-27 Scheduling Service Operations Appointment systems –Controls customer arrivals for service Reservation systems –Estimates demand for service Scheduling the workforce –Manages capacity for service Scheduling multiple resources –Coordinates use of more than one resource