Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003.

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Overcoming Barriers to Wind Development in Appalachian Coal Country Brent Bailey, Ph.D. Director, Appalachia Program The Mountain Institute An overview.
Critical Policy Issues for On-Site Generators An End-User’s Viewpoint Al Musur Chairman, Industrial Energy Consumers of America.
Combined Heat and Power (CHP) The Draft New Jersey Energy Energy Master Plan calls for the development of 1,500 MW of CHP generation over the next ten.
1. 2 The Problem 75% of our energy expenditures leave the state, versus growing jobs, incomes and revenues here at home. Indiana already imports essentially.
Overview Vermont Power Supply University of Vermont January 27, 2004 Dave Lamont Vermont Public Service Department.
1 WGA Clean and Diversified Energy Advisory Committee Briefing Brian Horii Energy and Environmental Economics, Inc
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Sustainable Energy Roundtable Series January, 2005 Pfizer Greenhouse Gas Management Program Experience.
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Innovative Financing for Urban Renewables Ken Nolan Manager of Power Resources May 14, 2015 Burlington Electric.
New York’s Energy Opportunities 2010 Gordon Boyd, EnergyNext, Inc. For Congressman Scott Murphy’s Economic Action Summit March 15, 2010.
Neeharika Naik-Dhungel, EPA CHP Partnership Program Central Pennsylvania AEE Meeting January 26, 2012 Combined Heat and Power: CHP Partnership and the.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Energy Production and Use in California Source: California Energy Commission
Consideration of Public Utilities Regulatory Policies Act (PURPA) Standards A Public Hearing- October 22, 2007.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Introduction to Bonneville Power Administration
MINISTRY OF ENERGY Energy Storage Presentation to APPrO Storage Symposium November 19, 2014.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Wind Energy Development In Illinois William S. Haas Energy Division Representative.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
New York’s Energy Opportunities Good News and Bad News 1.Historic low energy prices…today. 2.Capital Region still pays more than it should 3.Cap.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX:
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Confidential ADDRESSING CHALLENGES in PPP in the Power Sector A Private Sector Perspective The High Level Workshop on Public Private Partnerships Implementation.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
American Public Power Association Pre-Rally Workshop February 28, 2006 Washington, D.C. Climate Change: Making Community-Based Decisions in a Carbon Constrained.
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
El Gallo Hydroelectricity Project PDD Analysis
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
Sixth Northwest Conservation & Electric Power Plan CHP in the Sixth Plan?? Jeff King Northwest Power and Conservation Council Generating Resources Advisory.
Renewable Power Resources within Florida and Alachua County What are the needs, and why Alternative Energy Subcommittee - Energy Conservation Strategies.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
PURDUE’S SOLAR ENDOWMENT UTILITY SCALE SOLAR VALUE.
It was passed by Congress and designed to lessen the nation's dependence on imported energy, provide incentives for clean and renewable energy, and promote.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
GROWING A DISTRICT ENERGY START-up – QUEST 2017
The Ontario Energy Board and Demand-Side Management
Phase 3 Solar Feasibility Study Findings and Recommendations
Economic Development, Science and Innovation Committee
Future Energy Jobs Act: Public Sector Impacts
Renewable Energy Project Investments
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003

Project Profile Located at Weyerhaeuser mill, Kamloops 30 MW hog-fuelled turbo-generator Annual turbo-generator output : 200 GW.h Annual pulp mill displacement : 155 GW.h Excess 45 GW.h annually available for market sales Will become electrically self-sufficient

Project Profile (cont) Start-up scheduled for Spring 2004 Backup power and ancillary services available from BC Hydro

Project Profile (cont) Project cost : $28 million CDN Power Smart Incentive : $18 million CDN Incentive deal announced Jan 2003

What made Weyerhaeuser a Willing Partner ?? Interested in the project … a decade of effort to get the project advanced, but the financial hurdles had not been met Operates similar projects at this and other sites … technical basis well proven Positive economic spin-offs (construction jobs, permanent trucking jobs) Excess of hog fuel in the region

What made BC Hydro a Willing Partner ?? Open to non-utility options for generation Two options to acquire CHP projects --- Customer Based Generation (CBG) and Load Displacement (Power Smart) –CBG, establishment of year Electricity Purchase Agreements, payments over the life of the agreement –Power Smart, establishment of year Incentive Fund Agreements, payments provided as upfront capital to assist construction

What made BC Hydro a Willing Partner ?? (cont) Projects present a reasonable risk profile (technical, financial, credit, performance) Resource stack prioritization –DSM, Resource Smart, Private Sector (green & alternate, independent power)

How Did Government Policy Support This Project ?? Recent provincial Energy Plan promotes conservation, energy efficiency and low rates –#9, Electricity distributors will acquire new supply on a least-cost basis, with regulatory oversight by the BC Utilities Commission –#13, The private sector will develop new electricity generation, with BC Hydro restricted to improvements at existing sites

How Did Government Policy Support This Project ?? (cont) –#20, Electricity distributors will pursue a voluntary goal to acquire 50% of new supply from BC Clean Electricity of the next 10 years –#21, New rate structures will provide better price signals to large electricity consumers for conservation and energy efficiency –#23, The Utilities Commission Act will be amended to remove a disincentive for energy distributors to invest in conservation and energy efficiency

How Did Government Policy Support This Project ?? (cont)

How Did the Regulatory Regime Support This Project ?? DSM treated like generation projects for rate basing and rate of return Investments judged on Total Resource Cost (project cost being less than alternate resources) BC Utilities Commission historically supportive of DSM, alternate energies, net metering

Win-Win Project Weyerhaeuser –Receives staged payments totalling $18 million –Alleviates capital requirements –Utilization of hog fuel to generate electricity rather than beehive burner disposal BC Hydro –Receives 155 GW.h of load displacement for 1.5 ¢/kW.h –Avoids new generation at 5.5 ¢/kW.h –Supporting environmentally beneficial projects –Reduced transmission loadings