GLD DOD to do list and plan for IR section What to write in DOD What do be done before Jan-19 meeting (and after up to Bangalore meeting) - length : (guideline.

Slides:



Advertisements
Similar presentations
Selected topics from the recent GLD studies Akiya Miyamoto KEK 19 July, 2006 GLD lunch time meeting At VCLW06.
Advertisements

GUINEA-PIG: A tool for beam-beam effect study C. Rimbault, LAL Orsay Daresbury, April 2006.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Pair backgrounds for different crossing angles Machine-Detector Interface at the ILC SLAC 6th January 2005 Karsten Büßer.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
The GLD Concept. MDI Issues Impact on Detector Design L*  Background (back-scattered e+-, , n) into VTX, TPC Crossing angle  Minimum veto angle for.
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
August 2005Snowmass Workshop Instrumentation of the Very Forward Region of a Linear Collider Detector Wolfgang Lohmann, DESY.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Ronen Ingbir Collaboration High precision design Tel Aviv University HEP Experimental Group Cambridge ILC software tools meeting.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
Jan MDI WS SLAC Electron Detection in the Very Forward Region V. Drugakov, W. Lohmann Motivation Talk given by Philip Detection of Electrons and.
Analysis of Beamstrahlung Pairs ECFA Workshop Vienna, November 14-17, 2005 Christian Grah.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
Beam Monitoring from Beam Strahlung work by summer students  Gunnar Klämke (U Jena, 01)  Marko Ternick (TU Cottbus, 02)  Magdalena Luz (HU Berlin, 03)
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
September, 19 FCAL Worlshop in Tel Aviv W. Lohmann, DESY Physics Requirements Input From Theory Lessons from LEP LumiCal Simulations BeamCal.
February 13. FCAL Workshop in Cracow W. Lohmann, DESY Bunch charge effects and diff. Bhabha cross section News From Theory and Generator Diamond.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Karsten Büßer Instrumentation of the Forward Region of the TESLA Detector International Europhysics Conference on High Energy Physics Aachen, July 19th.
Beam-Beam Background and the Forward Region at a CLIC Detector André Sailer (CERN PH-LCD) LC Physics School, Ambleside 22st August, 2009.
Software tools and Computing Akiya Miyamoto KEK 29-September-2006 At FJPPL meeting.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
Fast Beam Diagnostics at the ILC Using the Beam Calorimeter Christian Grah, Desy FCAL Workshop February Cracow.
TESLA R&D: Forward Region Achim Stahl DESY Zeuthen Cracow Tel Aviv Minsk Prague Colorado Protvino UC London Dubna.
Impact parameter resolutions for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
Plans to study the Readout design in the forward region June 12 th 2007 Hans Wenzel  Currently: one big sensitive silicon disks: we record the Geant 4.
Software Status for GLD Concepts Akiya Miyamoto 31-October-2007 ILD Optimization Meeting References: - Y.Sugimoto, “GLD and GLDc”, talk at ALCPG07, ILD.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
J. Brau LCWS 2006 March, J. Brau LCWS Bangalore March, 2006 C. Baltay, W. Emmet, H. Neal, D. Rabinowitz Yale University Jim Brau, O. Igonkina,
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Beam-Beam interaction SIMulation: GUINEA-PIG C. Rimbault, LAL Orsay CARE 05, Geneva, November 2005.
Palaiseau, 13/1/ 2005 P. Colas - Optimising tracking 1 Optimising a Detector from the Tracking Point-of-View P.Colas, CEA Saclay constraints role Optimisation.
LumiCal background and systematics at CLIC energy I. Smiljanić, Vinča Institute of Nuclear Sciences.
2007/7/111 Pair Monitor studies K.Ito (Tohoku University) 2007/7/11.
Eunil Won/Korea U1 A study of configuration for silicon based Intermediate Trackers (IT) July Eunil Won Korea University.
FCAL Krakow meeting, 6. May LumiCal concept including the tracker R. Ingbir, P.Růžička, V. Vrba.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
William Morse ILC R&D April 19, ILC Detector R&D William Morse Physics Dept., BNL.
FCAL Takashi Maruyama SLAC SiD Workshop, 15 – 17 November, 2010, Eugene, Oregon.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
SiD Calorimeter R&D Collaboration
The Optimized Sensor Segmentation for the Very Forward Calorimeter
CLIC detector at SiD meeting 28/3/2010
FPCCD Vertex Detector for ILC
Study of e+ e- background due to beamstrahlung for different ILC parameter sets Stephan Gronenborn.
Progress report on PIC simulations of a neutralized electron beam
GLD IR optimization and background study
Yasuhiro Sugimoto KEK Feb.4, 2008
Crab Crossing Named #1 common technical risk (p. 6 of the report)
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Option 1: Reduced FF Quad Apertures
Presentation transcript:

GLD DOD to do list and plan for IR section What to write in DOD What do be done before Jan-19 meeting (and after up to Bangalore meeting) - length : (guideline from H.Y.) ~ 5 pages - contents: FCAL/BCAL and pair monitor (anything else?)

What to write (FCAL/BCAL) An optimized detector technology/geometry for FCAL/BCAL Currently, we have FCAL (mask) BCAL H.B.Park (2005) We also have inputs from Y.Sugimoto but similar to this (FCAL z was 230 cm) Any change against 2 mRad/20 mRad options? Proposed technology : W-Si CAL (note: other concepts consider W-Si/W-diamond/PBWO4 crystal)  FCAL: 13 < r < 44 mRad  BCAL: 1.4 < r < 13 mRad  FCAL: 260 cm ~ 285 cm in z-direction 12 cm ~ 36 cm in r-direction  BCAL: 430 cm ~ 450 cm in z-direction 2 cm ~ 18 cm in r-direction

What to write (FCAL/BCAL) Segmentation (I took the liberty of extracting parameters from H.B.Park’s idea originated from SLD experience) FCALBCAL # of layers1023 Interaction length (X 0 ) 1.74/layer0.86/layer Any change against 2 mRad/20 mRad options? How do they interface with the pair background core… Luminosity measurement performance: people are talking about  L/L ~10 -4 in other concepts. We need study on this if to be included

What to write (pair monitor) Beam profile monitor using pixel detector (H.Yamamoto, snowmass2005) - hit locations for zero crossing angle and 20 mrad angle - expected  y for various B fields and crossing angles - pixel size : 0.4 x 0.4 mm - sensor size : 2.54 x 1.27 cm by 54 pixels/sensor - readout electronics defined (preamp/discriminator/counter/latch) - readout circuit design and layout done (true?) - readout electronics submitted to fab (MOSIS, end of again true?)

What to be done (in general) FCAL/BCAL: Choice of technology and reason should be addressed - W-Si is baseline and W-diamond/PBWO4 as backup? (Need inputs from relevant people) FCAL/ECAL: Optimizing thickness/segmentation parameters - H.B.Park working on FCAL/ECAL: Performance - missing (simulation in progress, by H.B.Park) FCAL/ECAL: Readout electronics - completely missing (both technology and cost) FCAL/ECAL: Costing to Maki-san - communication with the company in progress for a rough estimation (H.B.Park) Pair monitor - realistic B field in sim., measurements on others (  x,horizontal shifts, azimuthal tilt of bunch, etc), updates on electronics R&D

What to be done (before Jan 19) Identify missing items to be included (need help from all of you) Rough cost estimate for FCAL/BCAL/pair monitor? - could it be delayed? - should it be easy? (It looks easy for FCAL/BCAL at least) Update on your R&D if not listed in this talk - I’ll be at KEK on Jan 19 so please use that slot (or to for communication before 19 th )

What to be done (longer term) Fill missing items FCAL/BCAL - Segmentation optimization - impact on background - electronics - simulation with physics Pair monitor - update on the readout electronics R&D - study with realistic B field - other parameters such as  x, horizontal shift, etc  Well defined technology choice (and reason) by the end of 2006