Doc.: IEEE 802.11-15/1084r00 Submission September 2015 Adrian Stephens, Intel CorporationSlide 1 802.11WG Chair comments to TGah Date: 2015-09-13 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1562r0 Submission January 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for January 2015.
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0236r0 Submission March 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for March 2015.
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0642r0 Submission May 2008 Jesse Walker, Intel CorporationSlide 1 IEEE JTC1 Ad Hoc Mid-Week Status May 2008 Date:
Doc.: IEEE COEX 02/016r1 Submission May 2002 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group Update Jim Lansford
Doc.: IEEE /0038r0 Submission Jan 2012 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report – Jan 2012 Date: Authors:
Doc.: IEEE /0481r1 Submission May 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for May 2015 Date:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /1444r2 Submission November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: TGad November 2011 Report.
Doc.: IEEE /0481r3 Submission May 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for May 2015 Date:
Doc.: IEEE /1511r0 Submission January 2016 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for January 2016.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE /1229r4 Submission November 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for November.
IEEE DASC Report January, 2009 Yokohama Pacifico Victor Berman, IEEE DASC Chairman.
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
Doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0983r0 Submission September 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for September.
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0096r6 Report September 2013 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report September 2013 Date:
Doc.: IEEE /2448r0 Submission September 2007 Ganesh Venkatesan (Intel Corporation)Slide 1 Waikoloa Report Date: Authors:
Doc.: IEEE /238r0 Submission January 2006 Simon Barber, Devicescape Software IncSlide 1 Process for simultaneous balloting Notice: This document.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0491r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /0592r0 Report May 2014 Adrian Stephens, Intel CorporationSlide 1 IEEE 802 Wireless Chairs – Formalization of Meeting Date:
Doc.: IEEE /0217r7 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: May 2016.
Doc.: IEEE /0051r1 Submission May 2011 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - May 2011 Date: Authors:
Doc.: IEEE /0983r3 Submission September 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for September.
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
Doc.: IEEE /0882r1 SubmissionEldad Perahia, Intel CorporationSlide 1 Date: Authors: TGad July 2012 Report July 2012.
September Session Supplementary Material
Resolving Deadlocks in Comment Resolution
January Session Supplementary Material
September Session Chair’s Supplementary Material
July Session Supplementary Material
March Session Supplementary Material
IEEE ah Sub 1 GHz license-exempt operation Agenda for July 2014
May Session Supplementary Material
November 2008 doc.: IEEE /1437r1 July 2011
P802.11n report to EC on request for approval to proceed to RevCom
P802.11n report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
IEEE P Motions at the July Plenary EC Meeting
nd Vice Chair’s Report – Mar 2012
IEEE TGmb Sept 2010 Agenda Date: Authors:
IEEE Motions at the November Plenary EC Meeting
IEEE TGw September Agenda
November Session Chair’s Supplementary Material
Avoiding unnecessary delays in the WG Letter Ballot process
P802.11w report to EC on request for approval to proceed to RevCom
September Session Chair’s Supplementary Material
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
July Session WG Chair’s Supplementary Material
July Plenary Opening Report
November Session Supplementary Material
July Session Chair’s Supplementary Material
July Session WG Chair’s Supplementary Material
July Session Chair’s Supplementary Material
IEEE P Motions at the July Plenary EC Meeting
Avoiding unnecessary delays in the WG Letter Ballot process
TGaq Closing Report Date: Authors: July 2016 July 2016
March Session Supplementary Material
November Session Supplementary Material
IEEE P Motions at the July Plenary EC Meeting
November Session Supplementary Material
January Session Supplementary Material
Presentation transcript:

doc.: IEEE /1084r00 Submission September 2015 Adrian Stephens, Intel CorporationSlide WG Chair comments to TGah Date: Authors:

doc.: IEEE /1084r00 Submission Abstract This submission is intended to be presented to TGah at the start of their next F2F time-slot to give advice on the conduct of their current business. September 2015 Adrian Stephens, Intel CorporationSlide 2

doc.: IEEE /1084r00 Submission Recent History of TGah Qualcomm has asserted that it owns essential IP in TGah [R1]. The letter was sent to PatCom on , and an update on The WG Chair asked Qualcomm to provide an LoA related to TGah on 3 occasions ( , , ). No letter of assurance (LoA) from Qualcomm related to TGah has (at the time of writing) been accepted by IEEE-SA. TGah asked IEEE-SA for advice on how to proceed, and IEEE-SA provided a response [R2]. There are a small number of comments related to IP for which a resolution has not been agreed. TGah is currently “near the end” of working group letter ballot. –95 % approval (255 Y, 11 N, 17 A, 2 Invalid) on the question “Should P802.11ah D5.0 proceed to sponsor ballot” TGah made no visible progress towards resolving these comments in the July 2015 session. Qualcomm sent a letter to PatCom [R4] indicating that the cited claimed essential IP was covered by an existing LoA. September 2015 Adrian Stephens, Intel CorporationSlide 3

doc.: IEEE /1084r00 Submission What are the options? Given TGah has 95% approval, can’t we just go ahead? –No. There are two steps that need 75% approval: resolution of the comments; and approval of a report to the EC. We need consensus (defined as 75% support) or the project cannot proceed. Do these particular comments need to be resolved? –Yes. All comments must be resolved (i.e., a resolution approved) and then circulated in a re-circulation ballot. Does TGah need to write the resolutions? –Well, the WG could, as a group, approve resolutions to the comments either in plenary session, or by an electronic ballot. But that is really “playing games” with process. We can assume those with an informed opinion are in TGah, so that is where the decision should be made. This does not limit the ability of a WG member to bring an individual motion in the WG on this topic. Whether the WG chooses to consider such a motion would be determined during approval of the WG agenda. September 2015 Adrian Stephens, Intel CorporationSlide 4

doc.: IEEE /1084r00 Submission What are the options – 2 What might happen if we can’t reach consensus in TGah? –Eventually the PAR will expire (Dec 2016). At that point the project is cancelled with immediate effect. –Delaying the project has an editorial impact and might have a technical impact on subsequent projects. –The group could choose to rescind the PAR. This requires a 75% vote (this requirement comes from the OM). Can we ask IEEE-SA for more advice? –We have already asked for advice. All IEEE-SA can do it point to and clarify its rules. It cannot offer other advice or bind what its committees will decide at some future time. September 2015 Adrian Stephens, Intel CorporationSlide 5

doc.: IEEE /1084r00 Submission How do we generally resolve conflict? “Agree on a compromise” –The principals of the two sides agree it is in their best interests to find a mutually acceptable resolution. –They sit down and work out their differences in private and then bring a consensus proposal for consideration by the TG. Rooms might be available for such “caucus” activities as a meeting, but no guarantees. “Show of strength” –The two sides engage in debate with the hope of convincing those “in the middle ground”. The two sides build voting strength. WG attendance and voter numbers increase. –This is a slow process over multiple WG sessions. –Experience tells me that creating “losers” is bad for future progress. September 2015 Adrian Stephens, Intel CorporationSlide 6

doc.: IEEE /1084r00 Submission Process in TGah A member of the WG executive will sit on the top table to advise the TG chair during any slot in which resolution of these comments is on the agenda. –Role is advisory. That person will not participate in debate. Members are reminded to adhere to the IEEE-SA patent policy. Some relevant points from the FAQ are shown in [R3]. Members are reminded to address the specific issues raised in the comments in debate. If debate looks like it might become “heated”, the chair will enforce strict rules of etiquette for debate (determining who has the floor, how many times people can talk). September 2015 Adrian Stephens, Intel CorporationSlide 7

doc.: IEEE /1084r00 Submission References [R1] “Communication from PatCom Re: ah” – communication-from-patcom-re ah.pdfhttps://mentor.ieee.org/802.11/dcn/15/ communication-from-patcom-re ah.pdf [R2] “Communication from SASB Re: ah” – communication-from-sasb-re ah.dochttps://mentor.ieee.org/802.11/dcn/15/ communication-from-sasb-re ah.doc [R3] “Answers to some possible IP questions” – answers-to-some-possible-ip-questions.dochttps://mentor.ieee.org/802.11/dcn/15/ answers-to-some-possible-ip-questions.doc [R4] “Communication to PatCom Re: ah” - communication-to-patcom-related-to ah.pdf September 2015 Adrian Stephens, Intel CorporationSlide 8