BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)

Slides:



Advertisements
Similar presentations
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Phase noise measurements in TRIUMF ISAC 2 cryomodule K. Fong, M. Laverty TRIUMF.
Commissioning requirements for Trajectory, Orbit and Tune measurements T. Lefevre on the behalf of the BI teams involved LBOC 9 September 2014.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
CAN WE BUILD A SINGLE BUNCH FEEDBACK Eric Plouviez ESRF Diagnostic group.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
M.Gasior, CERN-BE-BI 1 3D & the BBQ - Observing beam oscillations with sub-micrometre amplitudes Talk based on a Beam Instrumentation Workshop presentation.
M.Gasior, CERN-BE-BI8th DITANET Topical Workshop on Beam Position Monitors, January 2012, CERN 1 BPM Signal Processing with Diode Detectors Marek.
Collimator BPM electronics – Results from the lab, SPS and LHC
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Amplitude/Phase Modulation
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
LARP Berkeley Apr 2006 Tune/Coupling/Chromaticity Measurement and Feedforward/Feedback Peter Cameron.
M.Gasior, CERN-BE-BILHC Optics Measurement and Corrections Review, June Diode ORbit and OScillation (DOROS) System Marek GASIOR Beam Instrumentation.
U. Raich CERN Accelerator School on Digital Signal Processing Sigtuna Digital Signal processing in Beam Diagnostics Lecture 1 Ulrich Raich CERN.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Measuring Chromaticity Beam Dynamics meets Diagnostics Workshop Florence, Italy 4 th – 6 th November, 2015 Dr. Rhodri Jones Head of the CERN Beam Instrumentation.
RF acceleration and transverse damper systems
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Follow up on SPS transverse impedance
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Results of the LHC Prototype Chromaticity Measurement
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
M. Gasior, A. Boccardi, S. Jackson, O. R. Jones, R. J
Monday 18 October : Collimation system
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
SPS Transverse Damper System
LHC Morning Meeting - G. Arduini
Limits on damping times
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Thursday Fill 1364 (24 bunch) dumped at 07h
LHC - Week 38 Technical stop: Katy Foraz
Head-Tail Monitor for CC Diagnostics
Feedbacks & Stabilization Getting them going
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)

Agenda Objectives of the BBQ system Principle Things to remember Example Next steps

BBQ means BaseBand Q measurement  tune mesurement  goal: sensitivity below a μm in all tune measurement systems, the betatron amplitude modulation signal is very small compared to the overall signal created in the pickup electrodes  with standard electronics measuring μV on top of Volts is not possible  large beam excitation required (performed in general by dedicated tune kicker). The full name is 3D-BBQ (3D= Direct Diode Detection) The BBQ system can be used with a PLL excitation, but this was only tested on LHC during few MDs. In the LHC case with the current damper operation PLL is not efficient (beam transfer function dominated by the damper, PLL excitation damped by the damper, PLL excitation must be an order of magnitude larger than residual beam oscillations, which are sufficient for FFT operation) Objectives of the BBQ system Port 1 Port 2

Agenda Objectives of the BBQ system Principle Things to remember Example Next steps

Uses the same type of stripline BPM than the Headtail monitor) BBQ FFT1 “continuous” systems use BPLH, BPLV (as head-tail), betas m FFT2 “on demand” systems use BPLX, betas m DEV “development” systems use BPLH, BPLV, betas m … But the signal is treated in a very different way What is the BBQ system? BPLX type BPLH type

Principle The diode acts as a peak detector  detects small variations ( 100V)  differentiates the opposite electrode signals to make signal more robust for tunnel interference and noise (otherwise it would work fine with just one electrode) Reference: An overview of the LHC Transverse Diagnostics Systems

Agenda Objectives of the BBQ system Principle Things to remember Example Next steps

No gating on single buches  takes all bunches into account  signal reflects the tune from the most intense bunches (in fact gating by the beam itself at every bunch – no timing required) The transverse damper strongly affects the sensitivity of the BBQ measurement (decrease of the beam tune signal and increase of the beam noise) Data is only kept for 7 days in measurement database. After that most of the data is lost (only 1 spectrum per minute is kept in logging database). Huge files!!! Strong need to use the mulifile saving (need to cut the time range into files containing 1 or2 min for 1 beam for 1 plane to avoid crashing timber) Things to remember

PLL excitation system (now for MDs only, and only H.B1)  micrometer excitation by dedicated 1 m striplines (not meant to work in parallel with the damper) BQKH.6R4.B2 and BQKV.6R4.B2 BQKV.6L4.B1 and BQKH.6L4.B1 Chirp Excitation (generated by BI) also goes through the damper (RF) BBQ pickups  – “continuous “ FFT in Timber: B1  H: BPLH.B6R4.B1 and V: BPLV.C6R4.B1 B2  H: BPLH.A7L4.B2 and V: BPLV.A5L4.B2 – “on demand” FFT in Timber B1  H+V: BPLX.D6R4.B1 B2  H+V: BPLX.D6R4.B2 – development system “DEV” in Timber B1  H: BPLH.A6R4.B1 and V: BPLV.B6R4.B1 B2  H: BPLH.B7L4.B2 and V: BPLV.B5L4.B2 Where are the systems located?

Schematics of the BBQ system

Agenda Objectives of the BBQ system Principle Things to remember Example Next steps

Example: Switching feedback off (B1 and B2) Time on Oct 31 st 2010 after 01:00 AM (mm:ss) - Increase of the BBQ signal after switching the transverse feedback off - With the transverse FB on residual beam oscillations were damped

Instability rise times Rise times: B1H: 12 s B2H: 16 s B1V: 22 s B2V: 31 s Time on Oct 31 st 2010 after 01:00 AM (mm:ss)  Clamping of the BBQ signals -tunes measured still correctly -no good for instability observations  gain should have been lowered for instability observation

B1H B2H B1V B2V Tune spectra at 1:10:00 am (just before damper off) Damper off H tune

Agenda Objectives of the BBQ system Principle Things to remember Example Next steps

Marek is working on the possibility to be sensitive to all bunches (average instead of peak detection). He is also looking at gating the BBQ signal, but this is much more challenging. There is also a recent proposition to have a dedicated special bunch in the filling scheme (pilot? nominal?) on which the damper would not be active and which would be measured individually by the BBQ system  exact conditions to be discussed

LHC Transverse Diagnostics BDI-TB – Rhodri Jones – 21/6/2005 Tune Measurement Systems Standard Tune Measurement (FFT) and PLL tune tracker will use a new BaseBand Tune (BBQ) system developed at CERN using Direct Diode Detection (3D)

LHC Transverse Diagnostics BDI-TB – Rhodri Jones – 21/6/2005 3D Method Advantages / Disadvantages Advantages Sensitivity (noise floor measured at RHIC in the 10 nm range!!) Virtually impossible to saturate  large Frev suppression already at the detectors + large dynamic range Simplicity and low cost  no resonant PU, no movable PU, no hybrid, no mixers, it can work with any PU Base band operation  excellent 24 bit audio ADCs available Signal conditioning / processing is easy  powerful components for low frequencies Independence from the machine filling pattern guaranteed Flattening out the beam dynamic range (small sensitivity to number of bunches) Disadvantages Operation in the low frequency range  More susceptible to EMC It is sensitive to the “bunch majority”  gating needed to measure individual bunches