A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
INTRODUCTION TO e/ ɣ IN ATLAS In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to identify.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Pascal PERRODO, ATLAS-LAPP
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 Hadronic In-Situ Calibration of the ATLAS Detector N. Davidson The University of Melbourne.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
ATLAS Liquid Argon Calorimeters Geneva Group Alain BLONDEL Arno STRAESSNER Ahmed ABDELALIM Daniel LA MARRA Eric PERRIN Gabriel PELLERITI Gilbert VIOLLAT.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Intercalibration of the CMS Electromagnetic Calorimeter Using Neutral Pion Decays 1 M. Gataullin (California Institute of Technology) on behalf of the.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
Introduction Construction, Integration and commissioning on the surface Installation and commissioning after installation in the cavern Selected performance.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Ian Ross Rose-Hulman Institute of Technology Mentor: Dr. Richard Teuscher University of Toronto ATLAS Group ATLAS Calorimetery: Cosmic Ray Commissioning.
HEC Parameters from As-Built knowledge HEC is a homogeneous detector and any mechanical tolerances are well below any significance for physics..... this.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
8 June 2006V. Niess- CALOR Chicago1 The Simulation of the ATLAS Liquid Argon Calorimetry V. Niess CPPM - IN2P3/CNRS - U. Méditerranée – France On.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Uniformity in ATLAS EM Calo measured in test beams  Constraints on the EM calorimeter constant term  Energy reconstruction  Uniformity results with.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
CTB04: electron Data vs MC Stathes Paganis University of Sheffield LAr CTB04 WG 25-Aug-05.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Combined Longitudinal Weight Extraction and Intercalibration S.Paganis ( Wisconsin ) with K.Loureiro ( Wisconsin ), T.Carli ( CERN ) and input from F.Djama(Marseille),
Marco DelmastroCALOR Recent results of the ATLAS combined test-beam1 Recent results of the ATLAS Barrel Combined Test-beam (on behalf of the ATLAS.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
ATLAS Tile Hadronic Calorimeter:
Fast Shower Simulation in ATLAS Calorimeter Wolfgang Ehrenfeld – University of Hamburg/DESY On behalf of the Atlas-Calorimeter and Atlas-Fast-Parameterisation.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
First CMS Results with LHC Beam
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
The ATLAS Tiles Hadronic Calorimeter
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
The ATLAS Electromagnetic and Hadronic End-Cap Calorimeter in a Combined Beam Test Tamara Hughes University of Victoria WRNPPC 2004.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
First Measurement of Jets and Missing Transverse Energy with the ATLAS Calorimeter at and David W. Miller on behalf of the ATLAS Collaboration 13 May 2010.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
Introduction of my work AYAKO HIEI (AYA) Hiroshima Univ 2008/5/30 me.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
Performance of jets algorithms in ATLAS
on behalf of ATLAS LAr Endcap Group
CMS Preshower: Startup procedures: Reconstruction & calibration
CMS ECAL Calibration and Test Beam Results
BESIII EMC electronics
Plans for checking hadronic energy
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University of Toronto on behalf of the ATLAS Liquid Argon Calorimeter Group ICATPP 2009, Villa Olmo, Como October 5, 2009

A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 2

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 3 5,632 channels 173,312 channels 3,524 channels

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 4 5,632 channels 173,312 channels 3,524 channels

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 5 5,632 channels 173,312 channels 3,524 channels

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 6

Detector Status (from September 26, 2009) ~182k total channels Only 36 (<0.02%) permanently dead –E.g. problem inside cryostat ~1.2% with dead readout –Mostly bad optical transmitters on front end boards –To be fixed at next access <0.4% with broken calibration lines (calibration degraded by ~2%) <0.1% with large noise Channels exercised with regular calibration and cosmic runs. October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 7

Ionization and Signal Processing Shower develops in absorber LAr ionization electrons collected with ~1 kV/mm HV Front End Boards, on detector, receive ionization signals and –Amplify them, give them a bipolar shape (3 gains, ~1:10:100) –Sample and store them (~2.5 μs) while awaiting a L1 trigger decision –Select the gain, digitize, and transmit the signal upon L1 accept –Energy is calculated in back-end, off-detector, electronics October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 8

Pulse Samples Cell energy Optimal Filtering Coefficients ADC to DAC (Ramps) Pedestals Calibration board Sampling fraction Energy Reconstruction and Calibration Electronic calibration runs taken regularly –Calibration board delivers precise current to injection resistors at cell input (for EM calorimeters) –Pedestal runs, ramp runs to measure gain (ADC to DAC), delay runs to measure pulse shape –Exponential calibration input vs. triangular input from ionization Optimal Filtering Coefficients from ionization pulse prediction, using delay runs as input Sampling fraction from test beam and simulation DAC  μA property of calibration board Cell energies computed in back-end electronics or offline October 5, 2009 p. 9 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning

Stability of Calibration Constants Calibration runs planned between every LHC fill If significant changes are seen, calibration database is updated Pedestals are stable at the few MeV level over a period of months, here for one Front End Board (128 channels) Electronic noise for this layer ~25 MeV Amplitude of calibration pulses in delay runs stable at the 0.1% level Here comparing two calibration runs for whole LAr Barrel (~100k channels) Sensitive to stability of calibration pulse, shaper, pedestals, etc. October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 10

October 5, 2009 p. 11

LAr (Online) Monitoring and Data Quality Extensive suite of monitoring plots and data quality checks for online and offline use Energy-weighted pulse shape gives quick check of timing, by trigger and subdetector, and evidence of signal Sporadically noisy cells from damaged amplifiers repaired with front end board refurbishment October 5, 2009 p. 12 Energy-weighted average pulse shape. For each event, fraction of cells 3σ (DB) away from pedestal For each channel, fraction of events 3σ (DB) away from pedestal

Noise and E T Miss Electronic noise is measured in pedestal runs, but also in physics runs (random triggers) using the full reconstruction of the cell energy and recorded in the calibration database –Varies with layer, η, and subdetector across almost two orders of magnitude E T Miss reconstructed with cells, and with calorimeter clusters with additional noise suppression One faulty HV cable contributes significant coherent noise (now replaced) Aside from this, distribution is reasonably consistent with incoherent Gaussian noise October 5, 2009 p. 13

Noise and E T Miss Electronic noise is measured in pedestal runs, but also in physics runs (random triggers) using the full reconstruction of the cell energy and recorded in the calibration database –Varies with layer, η, and subdetector across almost two orders of magnitude E T Miss reconstructed with cells, and with calorimeter clusters with additional noise suppression One faulty HV cable contributed significant coherent noise (now replaced) Aside from this, distribution is reasonably consistent with incoherent Gaussian noise p. 14 With bad HV cable replaced

Cosmics as MIP’s to Test Response Uniformity Cosmic μ’s approximate minimum ionizing particles (MIP’s) Projective muons, passing through center of ATLAS, leave a clear signal in LAr Tests calorimeter simulation and calibration –Probes non-uniformity of calorimeter response at 1% level October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 15 Energy in cluster described by Landau + Gaussian Response uniformity in η Front and middle sampling layers Peak of Landau distribution vs. η

Some cosmic runs taken with 32 sample LAr readout (instead of nominal 5) –Large event size limits ATLAS trigger rate –But, allows detailed studies of signal shape Drift time of the freed electrons relates directly to the pulse undershoot –Allows in situ measurement of drift time –Tests ionization pulse model and detector simulation –In barrel, allows us to estimate gap uniformity (0.3%) and overall calo uniformity (0.4%) Testing Our Pulse Prediction With Cosmics: Measuring the Drift Time October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 16 Example pulse shape from cosmic run Drift time measurement in EM endcap Gap size varies with η

Test of Cell Timing With Single Beam Events October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 17 Single beam and collimator “splash” events –Large energy deposit in (nearly) every cell –Allows another pulse prediction quality check –Also, shown here, we check the time calibration Time computed with optimal filtering coefficients –Corrected for assumed time of flight –Prediction from calibration runs, and known calibration vs. signal path differences Agrees at ~2 ns level, except for presampler (and this artifact is now understood)

“Jets” in Cosmic Ray Events Cosmic rays can deposit significant energy in the EM and hadronic calorimeters –Either via hard bremsstrahlung events, or spectacular air showers –Good agreement with MC, aside from a few events in the tail (perhaps from air showers, unmodeled in the cosmic MC) With cosmics we can commission reconstruction software that will be used for collisions And look for unusual phenomena, like TeV jets October 5, 2009 p. 18

Rejecting “Jets” from Cosmic Ray Events These “jets” will be a significant background for some physics measurements (e.g. searches for beyond the Standard Model production of monojets + E T Miss ) Jets from collisions deposit energy throughout the calorimeter “Jets” in cosmic ray events are often single hard brem interactions in either the EM or hadronic calorimeter Simple cleaning cuts can almost completely eliminate the background October 5, 2009 p. 19

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 20

October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 21

Conclusions and Outlook The ATLAS Liquid Argon calorimeter is completely installed –Extensively commissioned with calibration, cosmic, and LHC single beam runs –Data Acquisition, reconstruction, monitoring and data quality infrastructure well developed Calibration system, including ionization pulse model, well understood –Regularly exercised, with stable calibration constants Cosmic ray events extensively studied –Gain confidence in reconstruction, calibration, detector simulation –Test detector uniformity and drift time, understand bad channels and noise, possible backgrounds to physics Ready and waiting for LHC collisions! –ATLAS Global cosmic run starts next Monday with 24-7 operation and shift crews –LHC beam anticipated in mid-November –LHC collisions would be an excellent Christmas present! October 5, 2009 A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning p. 22