RF surface aspects at power couplers Wolf-Dietrich Möller Fundamental Power Coupler Workshop June 23 – 24, 2015, CERN, Geneva.

Slides:



Advertisements
Similar presentations
Work Smart. Is our vessel ready on site Or has there been a delay.
Advertisements

Technology Education Dept. Bellwood-Antis High School Mr. Crowell Mr. Mackereth.
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
MarineMend Repair Kit Procedure
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
ILC Power Coupler – Fabrication & Cost CPI Beverly Microwave Division November 12, 2013.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
By Stephen Huse. Outline Abrasion and adhesion description Variables that change the wear rate Variables changed by coatings Surface coating processes.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Soldering & Brazing ALWAYS USE LEAD FREE SOLDER!!!!
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Topics for discussion WWFPC01, CERN, Geneva, June 2015.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
Metal Finishing and Painting TSM 233 Unit 16. TSM 233 Metallurgy and Welding Processes Metal Finishing – No Applied Finish  No finish is applied as some.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
SURFACE TREATMENT AN OVERVIEW
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
Hanyang University 1/15 Antennas & RF Devices Lab. MODERN ANTENNA HANDBOOK by CONSTANTINE A.BALANIS ch Jeong Gu Ho.
SHEET METAL REPAIR & MAINTENANCE
CERN co-worker: Thomas Eisel (lecturer) Diego Perini Friedrich Haug
PROTECTION SHELLS TE-VSC.
TDR guideline discussion on Cavity Integration
ILC-SCRF Test Facilities considerations
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
World-Wide Fundamental Power Coupler meeting #3
Manufacturing of the IFMIF series power couplers
FKPPL and FJPPL Joint Workshop
Findings in RF Power Couplers after operation on cavities in PXFEL2
Superconducting RF Crab Cavities
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
Cylinder Head: Parts and Service
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
XFEL Collimation and Beam Switchyard Vacuum Issues
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Please plug the 4 rudder pedal attachment bushings prior to powder coat also plug all nut plate holes.
V. Veshcherevich Cornell University
Presentation transcript:

RF surface aspects at power couplers Wolf-Dietrich Möller Fundamental Power Coupler Workshop June 23 – 24, 2015, CERN, Geneva

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 2 Ceramic fabrication and treatment Career of the ceramic (TTF Coupler) > Preconditions  One supplier for quality stability  One batch of powder for one seriens fabrication  Measurement of tangδ and ε in the lab  Sintering at the supplier > at the coupler fabrication: CPIRI Firing at air, inspectionin houseat supplier Metallizationin houseat supplier 800C in vacuum-in house Brazingin house Inspection and sand blasting if necessaryin house TiN coatin house E- beam weldingsubcontractin house Inspectionin house

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 3 Ceramics after brazing

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 4 Ceramic inspection after brazing, before TiN coating Appeared after brazing, is inside the material and cannot removed by surface sand blasting Appeared after brazing on surface, can be removed by sand blasting

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 5 Ceramic inspection after e-beam welding Copper evaporation from e-beam welding, Cannot be removed because TiN would be damaged No TiN – can be sand blasted Metallic residues from friction with tooling Edge broken, ceramic has to be replaced Can be sand blasted when not TiN coated Otherwise ceramic replacement

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 6 Ceramics after RF operation > After RF conditioning on test stand Dark stains Origin unknown Analysis underway Ceramic must be replaced

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 7 Ceramics after RF operation Wave guide window after years of operation Brown discoloration due to X-ray Gray discoloration unknown, no electrical resistance Can be used without restrictions

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 8 Ceramics after RF operation Wave guide window after month of operation Strong vacuum and light activities Gray discoloration unknown, brown comes from X-ray no electrical resistance measured (measurement days after disassembly) No increase of thermal heating observed Looks like metallization => window was exchanged,

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 9 Copper plating before RF conditioning Bellow valley Circular defects With copper Without copper Multiple holes Questions: How many acceptable? Outgassing? SEC?

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 10 Copper plating before RF conditioning Bellow valley missing copper Question: Acceptable? Up to what size?

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 11 Copper plating before RF conditioning Bellow valley Particles on surface and embedded Loose particles and sharp edges => not accepted Some could be removed Embedded particles with soft edges are accepted

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 12 Copper plating after RF conditioning Discoloration on copper Can be removed by citric acid => must be CuO RGA is OK Acceptable?

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 13 Copper plating after RF operating in modules (FLASH) Many stains and discolorations No restrictions during operation No hints in RGA Acceptable? FERMI

W.-D. Möller, DESY| FPC Workshop, CERN| June 23-24, 2015 | Page 14 Questions > What are the surface roughness limitations by scratches (brushing)?  see Chris’s talk at TTC > What is the source of stains and discolorations after RF operation at ceramics and at copper? > Do we need to prevent stains and discolorations and how? > ….