A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.

Slides:



Advertisements
Similar presentations
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Advertisements

30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Christopher Nantista ML-SCRF Technology Meeting July 28, 2010 REPORT.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Question 25: Delineate the R&D program remaining before a technical design review (TDR) and full cost estimate can be prepared. What are the major projects.
Particle-in-Cell Modeling of Rf Breakdown in Accelerating Structures and Waveguides Valery Dolgashev, SLAC National Accelerator Laboratory Breakdown physics.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
1.Energy reach  High power klystrons and modulators for X-band still need development and industrialization, and thus brings risk. But klystrons of similar.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Klystron Cluster RF Distribution Scheme Chris Adolphsen Chris Nantista SLAC.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
1.3GHz Input Coupler for ILC
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
TDR guideline discussion on Cavity Integration
ILC-SCRF Test Facilities considerations
Development of X-band 50MW klystron in BVERI
Power coupler at DESY & for XFEL
MICE RF Cavity Simulations and Multipactor
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
SNS Operational History
R&D Activity for Field Emission and Vertical EP
Findings in RF Power Couplers after operation on cavities in PXFEL2
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
Multipacting Simulations of TTF-III Coupler Components*#
Electron Source Configuration
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Nick Walker (DESY) EU GDE Meeting Oxford
V. Veshcherevich Cornell University
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important in establishing technical and cost risk, and in potentially uncovering show-stoppers. We are not the ideal technical evaluation panel. However, the ultimate criterion for choosing a technology is that the collider should make the best physics measurements possible. This is impossible to quantify, as we cannot know the nature of the physics at the TeV scale. We don’t have questions to address this, but in the end, the physics potential will have to be our primary guideline.

Question 4: Describe the tests and simulations needed to demonstrate that the couplers between waveguides to the linac vacuum within structures or cavities will be sufficiently robust. There are about 20,000 couplers to cavities or structures in either technology. In each case, they transmit and launch the rf pulse into the accelerating structure. However, the constraints on the couplers are quite different in the two technologies. Paul Grannis June 2004

Cold LC: The cold machine couplers must: Transmit the rf pulse, Isolate the cavity vacuum from the external world and protect the Nb surfaces from contamination. Make the transition from atmosphere (in external waveguides) to vacuum. Make the transition from room temperature to 2K. Reduce multipactoring, seen in previous SC couplers (multipactoring is resonant emission of electrons in standing waves between two surfaces, driven by the rf field).

The cold coupler provides for :  Two ceramic windows; one between room temperature atmospheric pressure and vacuum and the second between vacuum and the vacuum in the cavity at 2K  Coaxial transmission line through the coupler  DC bias on inner coax to reduce multipactoring  TiN coating of surfaces to reduce multipactoring (developed at DESY and ready for industrialization)  2 bellows to permit the 15mm motion on cryomodule cooldown  Ports for monitoring light and electron density, pumping between windows, introducing the DC bias.  External Q tuning

Cold Machine Input Coupler

Cold Machine Input Coupler

A particular problem in the cold coupler is desorption of gas at the warm window and recondensation on the cold window. In the presence of multipactoring, this gas can be released causing rf breakdown. This process occurs on the timescale of a year. Time to repair a major failure is ~4 weeks, so must wait for long shutdown. The cold coupler contributes a significant heat load for the cryogenic system: 44% of load at 2K 18% of load at 5-8K 24% of load at 40-50K So, attention to the thermal properties of the coupler and insertions is essential. Cold couplers:

MTBF spec (US cold/warm study) is 10 7 hrs. Couplers must be robust. TRC said that 1 trip/cavity in 30 hrs would be acceptable to keep the energy overhead. US cold/warm study assigned a combine risk factor of 36 Concern that industrialized coupler fails to meet specs (2) Effect on energy is linear (3) Problem not detected until project engineering done (2) Major redesign to mitigate problem (3) Industrial vendor (CPI) cites challenges: Quality of copper plating; hard to plate on bellows effectively Maintaining tolerances of welded assemblies Preventing contamination of windows during e-beam welds Cold couplers:

Previous TTF II coupler showed breakdowns (> 17/hr/cavity) at gradients of ~20 MV/m under somewhat abnormal operating conditions with cavities operated near the maximum gradient. About 10 6 hrs operation. No damage observed. Recent TTF III design operated satisfactorily for 25,000 hrs with no (few) breakdowns. This design introduced the DC bias on the central conductor. Tests were up to 2MW (2X operation) and 30 MV/m. US cold/warm study cites trip rates in CHECHIA at less than 1/1000 hrs. Cold couplers:

Couplers need fairly extensive conditioning – first independent of the cavities, then after installed on the cavities. This takes between 1 and several days at present. Controls system to detect and respond to faults is moderately complex. New bilateral agreement with Orsay/Saclay to study couplers, test performance, streamline conditioning, optimize interlock and controls. Cold couplers:

Warm LC couplers: X-band couplers have no windows (last window is at klystron exit) Input waveguide system operates at linac vacuum as there is no special contamination problem for structures. Entire system at room temperature rf wave enters from two sides in rectangular waveguides at front of structure, launched into the circular disk-loaded structures. Earlier designs showed some breakdowns in the couplers (as well as structures); new design with overheight waveguides shows no breakdown at SLAC for ~10 structures. At GLCTA, we heard preliminary suggestion of a few coupler breakdowns. Recovery from breakdown is the same ( <10s) as for the structures.

RF Accelerator Structure Warm Machine Input Coupler with Upstream Cover Removed

Assessment: Warm couplers seem relatively mature and low risk. Have not yet demonstrated full MTBF, but experience suggests that a robust design has been found. Cold couplers are complex, so there are more avenues for risk (vacuum, multipactoring & rf breakdown, thermal loads). Risk of failure is severe if vacuum failure allows contamination of Nb cavity surfaces. Conditioning time adds complexity to QA/certification process. In event of major failure (gas desorption and rf failures), repair time is large. Considerable risk will remain through engineering and into pre- operation phase. I imagine that the cold couplers can be successfully designed and operated, but there is risk of some delay or impact upon operation.