PANDA FTOF Prototyping Anton A. Izotov, Gatchina 25.12.13.

Slides:



Advertisements
Similar presentations
FToF Status Report CLAS Collaboration Meeting1 Test Results, Ongoing Work, Still To-Do, and More … FToF Progress Report CLAS Collaboration Meeting June.
Advertisements

Design and First Results of a Cosmic Ray Telescope For Use In Testing a Focusing DIRC M. P. Belhorn University of Cincinnati The BELLE group at the University.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
Abstract We constructed and tested seven scintillation counters using photomultiplier tubes, in order to create a fast electronic coincidence “trigger”
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
Performance of the PANDA Barrel DIRC Prototype 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt 2 Goethe-Universität Frankfurt Marko Zühlsdorf.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
CLAS12 activity at IPNO D2I: Design, realization and test of the Central Neutron Detector J. Bettane, J.L. Cercus, B. Genolini, G. Hull, M. Imre, A. Maroni,
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
KOPIO Catcher System RSVP Baseline Review Brookhaven National Laboratory April 20, 2005 Noboru Sasao / Tadashi Nomura (Kyoto U.)
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)
Aerogel Cherenkov Counters for the ALICE Detector G. Paić Instituto de Ciencias Nucleares UNAM For the ALICE VHMPID group.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
CLAS12 – CND PARAMETERDESIGN VALUE Detector typeBarrel of scintillators Angular coverage40 o to 120 o Number of radial layers3 Number of azimuthal segments48.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Design of Time zero(T0) counter contents Characteristic of p+p collision Time of Flight method Systematic scintillator performance Scintillator selection.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
FTOF Status Anton A. Izotov, Frascati
SiPM Workshop EU-FP7(HP3), Vienna, 16 Feb F.G. H.O. Study of scintillator detectors time resolution with different SiPM readout on T10 test beam.
The high performance PANDA detector International Workshop on Antiproton Physics and Technology at FAIR Julian Rieke, JLU Giessen on behalf of the PANDA.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
Hall B and GEANT4 Mark Ito Jefferson Lab GEANT4 Tutorial May 22, 2006.
FToF wall TDR review D.VeretennIkov GSI
The Status of the SciTil
Prospect of SiPM application to TOF in PANDA
Seoul National University On behalf of J-PARC E18 Collaboration
Activities and Results from PNPI GATCHINA
Status of HESR 18th March Gießen Dieter Prasuhn.
MDT and analog FEE mass production:
IFR Status Summary W. Baldini on behalf of the IFR Group
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
Focusing Aerogel RICH with SiPM Photodetectors
Luminosity Monitor Status
Central detector for CLAS12: CTOF and Neutron detector
Времяпролетный детектор PANDA
Particle ID Diagnostics in the MICE Beamline
Forward TOF Anton A. Izotov, PNPI.
Presentation transcript:

PANDA FTOF Prototyping Anton A. Izotov, Gatchina

A.A.Izotov, Gatchina, FAIR, HESR, PANDA.

Forward TOF and Dipole TOF DETCTORS Central part 20 counters 40 Hamamatsu R4998 Side parts 2x23 counters 92 Hamamatsu R4998 Configuration of DTOF not yet finalized, PM 187 (Electron) ? FTOF

A.A.Izotov, Gatchina, Tests in PNPI, April 2009: Yes, we can! But thicknes >=2.5 PNPI, November 2012: Better than 100 ps FTOF prototype COSY-2012, December 2012, PANDA Readout June December 2013.

A.A.Izotov, Gatchina, PNPI-2013 proton beam tests Protons: 920 MeV Plastic: B х5х2.5/1.5 cm 140х10х2.5 /1.5 cm 100x10x2.5 cm 140x2.5x2.5 cm PMT’s: R4998, R2083, FEU187, FEU 143 TDC: CAEN V775N QDC: CAEN V792 Preamps: Y/N

A.A.Izotov, Gatchina, PNPI June 2013 Protons, 920 MeV, 1.5x5x140 cm 3 with Hamamatsu R4998,worse than 120 ps 1.5x10x140 cm 3 with Hamamatsu R2083,worse than 150 ps 2.5x5x140 cm 3 with Hamamatsu R4998,better than 80 ps 2.5x10x140 cm 3 with Hamamatsu R2083,better than 80 ps 2.5x10x100 cm 3 with PMT 187, with and without PA,worse than 150 ps 2.5x5x140 cm 3 with PMT 187, with and without PA,worse than 150 ps 2x2x2 cm 3 with combination of R4998 and PMT ps

A.A.Izotov, Gatchina, Hamamatsu R4998 and R2083 results

A.A.Izotov, Gatchina, PNPI December 2013 Protons, 920 MeV, 2.5x5x140 cm 3 with PMT187, 2.5 cm along beam,worse than 200 ps 2.5x5x140 cm 3 with PMT187, 5cm along beam,worse than 160 ps 2.5x10x100 cm 3 with PMT143,worse than 400 ps 2.5x5x140 cm 3 with Hamamatsu R4998,  Count rate 230 k/sec better than 100 ps  Count rate 430 k/sec better than 100 ps  Count rate 700 k/sec better than 130 ps  Count rate 820 k/sec worse than 150 ps 2.5x2.5x140 cm 3, PMT187 better than 80 ps

A.A.Izotov, Gatchina, ФЭУ187 Электрон

A.A.Izotov, Gatchina, Prototyping Status Quo - December 2013 Forward TOF Wall prototypes are done better than 80 ps Intensity higher than 1MHz? worse than 120 ps Side TOF Walls 187 3x3cm without light guides? better than 80 ps Magnetic field ? to do Back to SiPMs?

Global plan for FTOF / DTOF design, fabrication and installation TDR approval, funding, tender, agreement, manufacturing concept. from to months 2.Material procurement, manufacturing and final prototype tests, manufacturing all components, detector pre-assembly. from to months 3.Shipment to FAIR: good inspection, test inspection, approval for installation, shipment from to months 4.Installation at HESR from to months 5.Commisioning from to months M3 9/2014 M8 04/2016 M10 06/2017 M11 10/2018 Approval of TDR Prototype tested pre-series accepted Approval for installation Ready for beam

Supporting slides

Time-of-flight PANDA stop detectors (top view) 2 T superconducting solenoid Barrel TOF DIRC TOF Dipole TOF Forward TOF wall

Work Package 2014 Monte Carlo simulation In PANDAROOT Framework Study various PID options using TOF/DTOF detectors; Optimize configuration of DTOF in the dipole; Update calculations of Individual FTOF/DTOF slabs at max luminosity; Design and prototyping Finalize prototyping FTOF counters; Complete study of PM-187 in strong magnetic field for DTOF prototyping; Work out project of GMS Work out project of supporting mechanical structures and cabling TDR first draft ready by March, approval September

Global Detection Efficiency Generated by DPM Detected by FTOF wall detection efficiency ,

Λ selection using FTOF wall 2-hadrons of opposite charge are detected Same with time-of-flight and kinematic criteria

planning January 2014 to July 2016

TOF Detector Goal : identification of forward going charged particles detected by FS with momenta below 4-5 GeV/c. TOF resolution ~50 ps. TOF detector consist of : - scintillation wall (1.4*5.6 m 2, 66 strips, 132 PMT) - side-TOF, inside the dipole magnet -two (1*1 m 2, 10 strips 20 PMT) Cost estimation: - materials (scintillators, light-guides, optical cement..) – € - PMT (PMT, housings, dividers, µ-metal shielding,…) – € - electronics (TDC, CFD, VME crates, …..) – € - HV power supply, cabling – € - Support structure – € - Test stand – € total – €