1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

Example 1: In the following cash flow diagram, A8=A9=A10=A11=5000, and
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Evaluating Business and Engineering Assets Payback Period.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Engineering Economics
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
TM 661 Engineering Economics for Managers
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
InvestmentWorth Investment Worth. Given a minimum attractive rate-of-return, be able to evaluate the investment worth of a project using Net Present Worth.
Multiple Investment Alternatives Sensitivity Analysis.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Flash back before we compare mutually exclusive alternatives.
Dealing With Uncertainty
Economic Equivalence Lecture No.3 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
EGR Interest and Interest Rate Interest, I ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth.
Intro to Engineering Economy
Summer Time Value of Money Session 2 07/02/2015.
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
IEN255 Chapter 6 - Rate of Return Analysis
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
1 Reviewing…Reviewing… EAW and Types of Projects: Revenue projects are expected to make money at a rate at least as high as the MARR, select largest EAW.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
Time Value of Money, Discounted Cash Flow Analysis (NPV) & Internal Rate of Return.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
1 Chapter 7 Rate of Return Analysis. 2 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At.
Evaluating a Single Project
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Exam 3 Practice Problems For Engineering Economy By Douglas Rittmann.
InvestmentWorth Investment Worth. Investment Worth MARR Suppose a company can earn 12% / annum in U. S. Treasury bills No way would they ever invest in.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Time Value of Money Don’t put your.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
ENGM 661 Engineering Economics for Managers InvestmentWorth Investment Worth.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Chapter 6: Comparison and Selection Among Alternatives
Chapter 5: Evaluating a Single Project
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Engineering Economics
Let’s work some problems…
RATE OF RETURN ANALYSIS CHAPTER 7
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 11: Breakeven and Sensitivity Analysis
Let’s work some problems…
Let’s work some problems…
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Chapter 6: Comparison and Selection Among Alternatives
Presentation transcript:

1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back on What You Learned – What does your answer mean?

2 Reviewing… Complex Cash Flows – Must split- up and recombine at the SAME point in time. Linear gradient cash flows always begin at the end of year two. Strategy – comparisons must occur at the same point in time. Periods for i and n must match!

3 Present Worth Analysis Net Present Worth of initial and future cash flows can be used to select among alternative projects. It is important to understand what Net Present Worth means, especially when the cash flows include both revenue and expenses.

4 Present Worth Analysis Project selection based on Present Worth Analysis: If all expenses and revenues are included, select the largest NPW that is greater than zero. Doing nothing is an option (leaving the $ to earn “safe” interest) If some or none of the revenues are included, select the largest NPW. “ Must Do situation”

5 TerminologyTerminology Salvage Value – the amount of money you can expect to receive by selling an asset when you are done with it. What value does it have when you are done with it? MARR – Minimum Attractive Rate of Return – I expect or need this return in order to be willing to invest my money.

6 Example Problem Project A costs $10,000 and will last for 10 years. Annual, end of the year revenues will be $3,000, and expenses will be $1,000. There is no salvage value. Project B costs $10,000 and will also last for 10 years. Annual revenues will be $3,000 with annual expenses of $1,500. Salvage value is $5,000. Conduct an economic analysis to select the preferred project using a MARR of 10% per year, compounded annually.

7 Example Problem Project A costs $10,000 and will last for 10 years. Annual, end of the year revenues will be $3,000, and expenses will be $1,000. There is no salvage value. GIVEN: LIFETIME = 10 YRS MARR = 10%/YR, CPD ANNUALLY FIRST COST = $ ANNUAL REVENUES = $3 000/YR ANNUAL COSTS = $1 000/YR SALVAGE VALUE = $0 FIND NPW A : NET ANNUAL = ANNUAL REVENUES – ANNUAL COSTS = $3000/YR – $1000/YR = $2000/YR NPW A ? 0 10 $ DIAGRAM: $ $1 000 NPW A = A(P|A,i,n) – 1 ST COST = $2 000(P|A,10%,10) – $ = $2 000(6.1446) – $ = $2 289

8 Example Problem Project B costs $10,000 and will also last for 10 years. Annual revenues will be $3,000 with annual expenses of $1,500. Salvage value is $5,000. GIVEN: LIFETIME = 10 YRS MARR = 10%/YR, CPD ANNUALLY FIRST COST = $ ANNUAL REVENUES = $3 000/YR ANNUAL COSTS = $1 500/YR SALVAGE VALUE = $5 000 FIND NPW B : NET ANNUAL = ANNUAL REVENUES – ANNUAL COSTS = $3 000/YR – $1 500/YR = $1 500/YR NPW B ? 0 10 $ DIAGRAM: $ $1 500 $5 000 NPW B = A(P|A,i,n) + SALVAGE(P|F,i,n) – 1 ST COST = $1 500(P|A,10%,10) + $5 000(P|F,10%,10) – $ = $1 500(6.1446) + $5 000(0.3855) – $ = $1 144 ►PREFER A

9 What does this mean? NPW A = $2 289NPW B = $1 144 We prefer project A over project B. Does NOT mean a $2 289 profit! Concept: We favor Project A by $2 289 over taking $ and putting it in an account earning 10%.

10 In other words… With expenses and revenues known, select the largest NPW > 0  Select Project A What does this mean? At i = 10% (cpd yearly), $2 000 at the end of each of the next 10 years is worth, today, $2 289 more than the initial cost of $

11 Further… You would be willing to pay as much as $10, ,289 = $12,289 for the project. At that price and at i = 10%, you are indifferent between: 1. Investing $12,289 for 10 years at i = 10%. 2. Obtaining $2000 at the end of each of the next 10 years (and reinvesting each receipt at 10%).

12 Illustrating… F 10 = (10, ,289) (F | P, 10%, 10) = (10, ,289) (2.594) = $31,875 F 10 = 2000 (F | A, 10%, 10) = 2000 (15.937) = $31,875

13 Thus… The project only costs $10 000, but at i = 10% it is equivalent to investing $ $2 289 for 10 years. Since PW > 0, you are actually earning more than 10% on investment.

14 Present Worth Analysis When applied correctly, NPW can be used to select among various alternative projects. The larger the NPW the better. Requires establishing MARR. MARR is used as the (i) in the equations.

15 Plotting NPW vs. i Why does NPW decrease as i increases? NPW ($) i (%) %15.1% 0 IRR