Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
LHC Status Fri Morning 3-June
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Sunday 28 Nov. 00h00: Stable beams # x 121 b. Peak lumi 2.0e e25 cm-2 s-1. 09h52: Dump fill # delivered 440 (mb)-1. RCBCH8.L5B1 trip.
Friday 15th June 01:11 Injection.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Week 47 + Start Week 48
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
Summary of ion week 48 Last beam OP summary of 2010 Week 48
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Status Sun Morning 20-Mai
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Week 35 – Technical Stop and Restart
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Friday 25 bunch fill dumped just before (BLM in 5)
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Sat :24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to turn around, always in the same order Ready for injection 50 minutes after dump  14:20 During injection: TI8 magnet problem – EPC piquet  Wait for ATLAS SOLENOID to ramp up – on slow ramp rate…  Trip of power converter RCBCV7.L2B2. ‘Only’ a corrector, but needed….. (see later) Short access PM25, power converter rapidly changed  20:20 Problem on the door of power converter in TI2 RQID_20700 EPC piquet for TI2... unfortunately the CERN car that he has been issued with only summer tires on :30 Injecting for fill #1525  Pauses during filling because of PS cavity trips  23:56 Stable beams ! This time it took 11h32 min to get back in physics again 7:50 Ion source problem – wait with refilling LHC 8:30 meeting 28/11/2010

Fill #1523 Small emittances after filling at injection  B1H/V: 3/2.5, B2H/V: 3.3/3.6 Good start lumi’s, although no record beam intensities 04:00 Stable Beams 12:20 Dump LHC 8:30 meeting 28/11/2010

Power converter RCBCV7.L2B2 Trip of power converter RCBCV7.L2B2. ‘Only’ a corrector, but needed…..this is close to the IP Jorg: There would be two 1 mm bumps after correction and one of these is at the Q5. With such bumps the correction may be difficult and also could have an influence on the crossing angle Decision to do the access and fix the problem rather than creating new ones EPC access is needed to fix it. Due to the snow the earliest that the piquet can get here is ~5:45, so the access starts at about 18:30 MAD guardian got lost (in the snow) – another 30 min delay Power converter RPLB.UJ23.RCBCV7.L2B2 has been changed. Auxiliary power converter fault LHC 8:30 meeting 28/11/2010 Error not corrected out

Midnight: Stable beams fill #1525 LHC 8:30 meeting 28/11/2010

Beam currents and lumi’s since Wednesday LHC 8:30 meeting 28/11/2010 Can spend your time analysing the lumi’s...

(ALICE) Lumi vs. time 28/11/2010 Saturday: Fill # 1523 Friday: Fill # 1522 Fill # 1523 / Fill # 1522 ‘Elbow’ For both fills optimum time to keep it in would be about 5 hours, for 4 hours refill…. Keep it for 6 hours, for an 8 hours refill..... We tend to keep it longer: you know what you have Confirmed by yesterday’s experience

Total delivered lumi, this morning Very close to the target for this week of 6 (µb)-1 LHC 8:30 meeting 28/11/2010

Plan Get beam back again from Linac - refill More physics 121 x 121 Next Week:  Tuesday: Van der Meer Scans  Injection tests with 8 bunches  Discussing a few MD-style studies (IR aperture, …) LHC 8:30 meeting 26/11/2010