CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th 2008 1 Architecture of powering and protection systems for high field.

Slides:



Advertisements
Similar presentations
LHC Machine Protection
Advertisements

Concept & architecture of the machine protection systems for FCC
FCC-hh Injection and Extraction
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CRYOGENICS AND POWERING
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
E. Todesco HL-LHC: OUTLOOK ON PROTECTION FOR IR MAGNETS (WP3) E. Todesco CERN, Geneva Switzerland CERN, 23 rd April 2015 MPE meeting.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Preliminary Power Estimates for the FCC-hh FCC Week 2015 Washington, 26 April 2015 Rende Steerenberg, CERN - Geneva2 Rende Steerenberg, Paul Collier,
Interlock and Protection Systems for SC Accelerators: Machine Protection System for the LHC l The Risks l The Challenge l The LHC Layout l The Systems.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
PostMortem Workshop January LHC “Post Mortem” Workshop: Introduction Initiative by Robin Lauckner, Adriaan Rijllart and myself, helped by many other.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
The integration of 420 m detectors into the LHC
K H Meß AT-MEL CARE HHH-2004 Session2 Machine Protection 1 Machine Protection Can the upgraded LHC be protected? Scenarios Intensity upgrade (from 0.58.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Comparison of magnet designs from a circuit protection point of view Arjan Verweij, CERN, TE-MPE with input from M. Prioli, R. Schmidt, and A. Siemko A.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
HL-LHC IT STRING and Series test of SC link
D1 and D2 powering and protection
MQY-30 Test Result Report
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
Introduction: FCC beam dumping system
Superconducting Circuits, a generic view
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Circuit-protection aspects of different preliminary magnet-design options
Powering the LHC Magnets
Concepts for magnet circuit powering and protection M
FCC hh dump kicker - switch topologies and impact on beam
Comparison of magnet designs from a circuit-protection point-of-view
Dipole circuit & diode functioning
Powering from short circuit tests up to nominal
Status of studies on FCC magnet circuit architecture and protection
Detailed global view on protection and detection of the circuits
3 issues identified in review
Rüdiger Schmidt and Karl Hubert Mess
FCC-hh injection group 7
Initial Experience with the Machine Protection System for LHC
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field circuits same material as in Challenges and limitations of a 100 km magnet string (talk on Wdn) Rüdiger Schmidt and Andrzej Siemko, CERN FCC week 2015

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 2 FCC-hh challenges Stored magnet energy Stored energy in dipole magnets about 160 GJ 16 times higher than LHC, equivalent to nine A380 (560 t) at nominal speed (900 km/h) Magnet energy can melt 200 tons of copper Protection of individual magnets Protection of electrical circuits to be addressed early on!

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 3 Incident September 19 th 2008 Energy stored in a magnet string has the potential of creating large damage

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 4 Energy versus momentum

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 5 Energy stored in superconducting magnets

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 6 Electrical circuit for superconducting magnets Elements attached to the circuit ● Magnets ● Power converters ● Warm bus-bars (..might be water cooled) ● Cold bus-bars ● Possibly superconducting links ● Interconnections ● Warm-to-cold transitions (current leads) ● Instrumentation (monitoring and protection) ● Quench heaters and power supplies ● High-current switches ● Resistors for energy extraction ● Interlocks +cryogenics, vacuum, …

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 7 Some lessons from LHC ● Stored energy in LHC dipole magnets: 9.2 GJ All other circuits contribute with less than 10% of total energy ● Magnet system is sectorised Split for LHC in 8 sectors powering independently No worries about many power converters to track the current accurately (10 -6 ), works very well, more sectors could be considered for FCC ● There will be quenches, and there might be many quenches ● Discharge time of 100 s for dipole string Quench propagation to other magnets by warm helium Other mechanisms of quench propagation, not all are fully understood Quenches will be more violent in FCC (more energy in one magnet) ● Increase the time constant: reduction of voltage ● Decrease time constant: less quench propagation, diodes and bus-bars simpler Needs more studies Retraining to 6.5 TeV

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 8 Layout of FCC-hh – defines options Injection Experiment Collimation and extraction Sector Feed / Return Injection Experiment Collimation and extraction Sector Feed / Return Sector Feed / Return Sector Feed / Return Arc (L=16km, R=13km) MiniArc (L=3.2km, R=13km) DS (L=0.4km, R=17.3km) Straight (L=1.4km and 2.8km) Long arcs most challenging

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 9 Siting study 93 km perimeter PRELIMINARY J. Osborne & C. Cook Difficult to imagine more access points

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 10 Powering and Protection of LHC dipole string ● Time for energy ramp is about min (Energy from the grid) ● Time for regular discharge is about the same (Energy back to the grid) 10 Power Converter Energy Extraction: switch closed Magnet 1 Magnet 3 Magnet 153 Magnet 2Magnet 152Magnet 154 Magnet 5 Magnet 4 Energy Extraction: switch closed DFB

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 11 Powering and Protection of LHC dipole string ● Quench in one magnet: Resistance and voltage drop across quenched zone ● Quench is detected: Voltage across magnet exceeds 100 mV 11 Power Converter Magnet 1 Magnet 3Magnet 153 Magnet 2Magnet 152Magnet 154 Magnet 5 Magnet 4 Energy Extraction: switch closed Quench Detector DFB Energy Extraction: switch closed

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 12 Powering and Protection of LHC dipole string ● Quench heaters warm up magnet : energy deposited inside magnet (~200 ms) ● Diode in parallel becomes conducting: current in magnet string through diode ● Resistance is switched into circuit: energy of 153 magnets is dissipated into resistance (time constant of 100 s for main dipole magnets) 12 Power Converter Energy Extraction: switch open Magnet 1 Magnet 3Magnet 153 Magnet 2Magnet 152Magnet 154 Magnet 5 Quench Detector Magnet 4 Energy Extraction: switch open DFB Quench Heater PS

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 13 Magnet String in FCC ● To be considered: Inductance of a magnet string ● Ramping magnets needs energy => power converters need to provide electrical power ● Discharge after a quench in a given time => voltage Start with scaling from LHC parameters

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 14 FCC magnet string: dipoles ● Consider magnet strings of 8 km – one dipole circuit ● Assume magnet lengths as for LHC ● Assume field of 16 T ● Use three versions of magnet parameters (inductance, current) Preliminary magnet parameters that were available (three options, D.Schoerling ) are assumed ● Assume filling factor slightly better than LHC (length of field / length of sector) ● Calculate number of dipoles in a sector and circuit parameters ● Assume time for ramping the energy ● Calculate Voltage and Power required for ramp ● Assume time for discharge, e.g. after a quench ● Calculate discharge voltage during discharge with two (or more) energy extraction systems

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 15 FCC magnet string: dipoles Some parametric studies

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 16 Circuit parameter ● Split 16 km sector in two 8 km long powering sectors ● Length of a powering sector 8 km ● Consider dipole magnets LHCFCC option 1 MB – cos(  1.9 K MB – 1.9 K Magnetic Length [m] Mechanical Length [m] Magnets in one sector Total number of magnets Current at top energy [kA] Field at top energy [T] Inductance [H/m] Inductance [H] per magnet Energy in one magnet [MJ] Inductance in one sector [H] Energy in one sector [MJ] Energy in accelerator [MJ] Design by D. Schoerling

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 17 Ramping the dipole string ● In one powering sector: 474 dipoles ● Ramping time of 20 min is assumed ● High voltage during ramping (magnets and all associated instrumentation must cope with it) ● Very high power to be provided by power converters during ramping LHCFCC option 1 Voltage in ramp [V] Max power for ramping [MW] Ramp time [min]20 Max power for ramp all machine [MW]

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 18 Discharge of the dipole string ● Option 1 as LHC: Discharge time of 100 s, two energy extraction systems, one at each end of the string LHCFCC option 1 Discharge time [s]100 Number of EE systems2222 Total resistance required for discharge [Ohm] Total Voltage across resistance [V] dIdt at the start of discharge [A/s] Voltage for discharge [V] - 2 EE systems LHCFCC option 1 Discharge time [s]10020 Number of EE systems2222 Total resistance required for discharge [Ohm] Total Voltage across resistance [V] dIdt at the start of discharge [A/s] Voltage for discharge [V] - 2 EE systems ● Option 2 as LHC: Discharge time of 20 s, two energy extraction systems, one at each end of the string

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 19 Discharge of the dipole string ● Option 3 : Discharge time of 20 s, many energy extraction systems (in this example 100) ● Option 4: Increased time constant (40 s = 50 EE systems) LHCFCC option 1 Discharge time [s]10020 Number of EE systems2100 Total resistance required for discharge [Ohm] Total Voltage across resistance [V] dIdt at the start of discharge [A/s] Voltage for discharge [V] - 2 EE systems LHCFCC option 1 Discharge time [s]10040 Number of EE systems250 Total resistance required for discharge [Ohm] Total Voltage across resistance [V] dIdt at the start of discharge [A/s] Voltage for discharge [V] - 2 EE systems

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 20 Discharge of the dipole string ● Option 5: increase time constant from 100 s to 360 s to reduce voltage LHCFCC option 1 Discharge time [s] Number of EE systems2222 Total resistance required for discharge [Ohm] Total Voltage across resistance [V] dIdt at the start of discharge [A/s] Voltage for discharge [V] - 2 EE systems These values are approximate, and depend on several parameters, but will not change by more than, say, some 10%

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 21 Some parameters to be explored…. ● Best to have shorter powering sectors... civil engineering? ● Reduction of ramp rate reduces power… but 20 min is already long ● Powering each dipole aperture separately (gain a factor of 2, more bus-bars required) ● Fast extraction of energy by many energy extraction points Limited by maximum current decay that is permitted without quenching magnets (possibly 1000 A/s) Assume maximum voltage of about 1 kV ● Alternative to mechanical switches as in LHC: are superconducting switches possible? Stretch of sc cable heated by a quench heater, becomes conducting In parallel, resistor outside the cryostat with lower resistance ● Can we consider cold resistors?

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 22 Powering and Protection of LHC dipole string Power Converter Magnet 1 Magnet 3Magnet N Magnet 2Magnet 152Magnet 154 Magnet 5 Magnet 4 DFB Quench Heater

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 23 A long magnet string to be discharged… One example ● Needs current leads that carry current during time for extraction ● Assuming voltage across extraction resistor of 1 kV ● The value of one resistor is 62.5 mOhm ● Assuming a time constant of 20 s, 100 of such resistors are required ● Assuming a time constant of 20 s and a current of 16 kA, a bus- bar of about 120 mm2 is required to connect an extraction resistor ● Acceptable for cryogenic system? ● Volume of dump resistors to be considered

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 24 Providing the power

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 25 Energy in the FCC Magnets: 600 Teslas Is there a way to store and recuperate the energy of the magnets using batteries?

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 26 As for LHC: lot of electronics in the tunnel ?? ● FCC: Quench detection system requires several electronics cards and ~20000 quench heater power supplies ● Power supplies for orbit corrector magnets ● Beam loss monitors and their front-end electronics ● Equipment for vacuum control ● Equipment for cryogenics control Radiation, limitation in design, long access time, safety of personnel in tunnel imposes restrictions, … As little electronics as possible in the tunnel

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 27 Ideas to be looked at ● Excellent experience with powering of many circuits via long cold bus-bars (all 600 A circuits) in so-called N-line and other lines ● Orbit corrector magnet supplied by sc cables in the cold Powering of orbit power converters via type of “N-line” ● Quench heater power supplies / CLIQ system: can the High Voltage provided by a central HV supply and distributed to the magnets? Local switches still required ● Minimum complexity of front end electronics: communication from service computers to front-end electronics in tunnel will be critical -> R&D required (also for HL-LHC) Excellent experience with signal transmission via optical fibres Experiments are thinking about wireless communication ● What to do with electronics for vacuum and cryogenics?

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 28 Availability ● Availability: as far as possible, redundant systems should be used ● Availability: no single failure in an electronics component or in a cable connection should lead to a beam dump ● For protection systems: 2oo3 voting to be considered (quench detection system, interlocks, beam loss monitors) ● For other system, redundancy / hot spares To be designed such that beam survives switching to hot spare Monitoring of failed unit required Repair during maintenance period ● Longer sectors: longer intervention time, magnet training takes longer in case it is required

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 29 Reducing length of powering sector to 4 km ? Injection Sector feed / return Collimation / Extraction For the long arcs, this would result in 16 powering sector, each with 4 km length, ramp voltage in the order of 1 kV 16 km

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 30 Some questions ● Is it possible to reduce the length of a magnet string? Reduction by a factor of 2 by powering an 8 km long sector from both sides? Further reduction? ● What ramp time should we consider? ● What voltage for the magnets is acceptable? ● Are sc switches possible? ● What about the load of current leads (e.g. 120 mm2) to the cryogenics system?

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 31 Conclusion ● Magnets with a field of 16 T magnet are very challenging ● The FCC powering and protection system to safely power a string with such magnets is similarly challenging ● Simple scaling from LHC will result in a system that is too expensive, and cannot be efficiently operated ● Shorter powering sectors are preferred ● For the system to ensure safe and efficient powering of the magnets, new ideas and R&D on new technologies is required! Mike Syphers Tuesday

CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 32 Acknowledgment To many colleagues who were involved in LHC powering over the years Special thanks to…. ● Arjan Verweij ● Luca Bottura ● Daniel Schoerling