ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Goal Parameters How Tools Results Increasing Revenues by Optimizing Generation Relative to PJM Forecasted Price Signals.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Current FRRS Language & Explanation of Posted Data
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Principles of Participation in Real-Time Co-optimization
A Midsummer Night’s DREAM
Interpreting DREAM NPRR 777.
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presentation transcript:

ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues

ERCOT Public 2 RT Energy + Ancillary Service Co-Optimization Issue 1: What to do about SASM? What should be done if ERCOT analysis indicates AS shortage well in advance? RT co-optimization leads to high prices but there is a potential reliability issue with insufficient reserves – NERC compliance issue? How to deal with AS Deliverability? The awarded AS will be based on economics. What will be the procedure when a resource behind a constraint is awarded but can’t deliver? Other ISOs have addressed this by: Minimum AS zone requirements/demand curves Processes to disqualify Resources from offering AS due to deliverability issues

ERCOT Public 3 RT Energy + Ancillary Service Co-Optimization Issue 2: What are the options when coming out of DAM with AS insufficiency? Will need further discussions that include ERCOT operations and stakeholders

ERCOT Public 4 RT Energy + Ancillary Service Co-Optimization Issue 3: What happens when the RT market fails? Which units would provide AS under this scenario? Last SCED awards? DAM awards? How would we handle the hour boundary under each scenario? What MCPC would we use? During emergency conditions we have Emergency Operations settlement to compensate for uneconomic dispatches. Would we need same type of AS treatment for AS deployed when not economic based on offer? What would happen if we lost ICCP node with a large QSE? How would we redistribute the awards?

ERCOT Public 5 RT Energy + Ancillary Service Co-Optimization Issue 4: Operations would need new tools to monitor and react to the potential changes in AS responsibility every 5 minutes We will need to think outside of the box on this one and try to anticipate what the needs may be and how we may best solve those needs. Ideas? Issue 5: Will regulation deployment be unit specific or at the QSE level?