PowerGEM Power Grid Engineering & Markets 1 LMP’s and Congestion Relief Lens, Crystal Ball, or Alice’s Looking Glass ? January 30, 2003 Jim Mitsche

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Demand Response in the Reliability Pricing Model Chuck Whitlock.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Carbon Markets: Volatility & Trading Institutions Craig Pirrong Bauer College of Business University of Houston.
December 4, 2000© 2000 Fernando L. Alvarado1 Reliability concepts and market power Fernando L. Alvarado Professor, The University of Wisconsin Invited.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Valuing Load Reduction in Restructured Markets Supply Cost Curve Regressions Market Price vs. Value of Load Reduction Photovoltaic Case Study William B.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
EIUG – Wheeling Methodologies
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? An Overview of Various RTO Capacity Constructs and their Impact on Load.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Australian Energy Market Commission Congestion Management Review and related projects ACCC Regulatory Conference Thursday, 26 th July 2007.
LMP Electricity Markets: Market Operations, Market Power, and Value for Consumers EMRI Symposium American Public Power Association February 5, 2007 Presented.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Nothing below this point Subtitle Nothing below this point Congestion.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Bulk Power Transmission System
PowerGEM Power Grid Engineering & Markets 1 New York Congestion Costs Experience and Plans FERC Offices April 14, 2005 James Mitsche.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
1 CRR Credit Policy Task Force Update WMS April 16, 2008.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
1 SMD and Efficiency Programs Standard Market Design (SMD) –Implemented March, 2003 –Major feature, locational assignment of costs and locational price.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Illinois Wholesale Market Update December 10, 2003.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Operating Reserves and Extended Locational Marginal Pricing 1.
Highlights of Midwest ISO: 2004 State of the Market Report and Day-2 Energy Markets Prepared by: David B. Patton, Ph.D. Independent Market Monitor Midwest.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Benefits of ICAP Reliability Economics
Electricity Wholesale Markets: Designs for a low-carbon future
Flexible Forward Contracts for Renewable Energy Generators
Scott Harvey California ISO Market Surveillance Committee Meeting
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Scott Harvey California ISO Market Surveillance Committee Meeting
Transmission Pricing & Regional Electric Markets
Ahmad Elberry, Abdelghani Aljayyousi
Tom Welch October 18, 2002 Boston, Massachusetts
Presentation transcript:

PowerGEM Power Grid Engineering & Markets 1 LMP’s and Congestion Relief Lens, Crystal Ball, or Alice’s Looking Glass ? January 30, 2003 Jim Mitsche

PowerGEM Power Grid Engineering & Markets 2 Opinions, Based on What ? Analysis of NY State Congestion Cost and Causes 2000 – 2002 –Report at Analysis of Delmarva Peninsula (PJM) Congestion Cost and Causes 2000 – 2002 –Report At Years of Decision Support to Major TCC Owner in New York Thanks to my co-workers Boris Gisin and Manos Obessis, and to Scott Gass of PJM !

PowerGEM Power Grid Engineering & Markets 3 LMP’s Add to Price Volatility, What Do We Get for That ? In A Nutshell LMP’s point to congestion causes and impacting load/generation very well (with a little more data than usually available) LMP differences (congestion cost) patterns are often very mysterious and difficult to predict Financial products based on LMP differences are good for hedging, but not investment Some new approaches may reduce LMP price volatility and encourage LMP based transmission investment

PowerGEM Power Grid Engineering & Markets 4 LMP’s Point to Congestion Causes

PowerGEM Power Grid Engineering & Markets 5 LMP’s Point to Impacting Load/Generation

PowerGEM Power Grid Engineering & Markets 6 A Little More Data is Needed Shadow Prices Are More Useful than LMP’s for Cause Impact & Analysis –Shadow Prices (value of relieving a constraint) reflect Multiple Constraints –(1.9 per hour in PJM, 5+ is common) Outages –(4 per hour average in Delmarva alone, 10+ is common in ISO’s) Relief Cost & Effectiveness –PJM Shadow Prices vary $0 to $1269 Amount of Load Affected These Data + LMP’s Inform Markets

PowerGEM Power Grid Engineering & Markets 7 Why is Congestion Occurring at All Load Levels ? Why Doesn’t Congestion Cost Go Up with the Supply Curve ? Congestion Patterns are Often Mysterious

PowerGEM Power Grid Engineering & Markets 8 Does Congestion Increase with Increasing Load Level ? Generally No ! Somewhat more frequent congestion with no outages at higher loads

PowerGEM Power Grid Engineering & Markets 9 What Causes Congestion At Shoulder Load ? Transmission Outages Generation Outages Unit Commitment Decisions and Restrictions –Unit Minimums –Ramp Rates –Minimum Run Times Bidding Patterns & Generation Location

PowerGEM Power Grid Engineering & Markets 10 Delmarva Peninsula Summary of Congestion by Cause August August 2002 Hours Cost No Outages Planned Maintenance Outages Forced Outages Construction Outages

PowerGEM Power Grid Engineering & Markets 11 CRR’s Make Good Hedges but Bad Investments

PowerGEM Power Grid Engineering & Markets 12 Why Spend $$ on New Transmission ? Reliability Needs Entry Fee –Safe Interconnection and Capacity Deliverability Costs Insurance Policy –LMP’s Provide Actuarial Data –CRR’s Define Hedges Investment –Volatile and Unpredictable –Where is the Pay-Back ?

PowerGEM Power Grid Engineering & Markets 13 Improving LMP Based Markets Is There a Way ? Embryonic Ideas –Reducing LMP Volatility Create a financial resource (bilateral transactions or bilateral secondary market ?) to use in commitment/dispatch to avoid going over the congestion “cliff”. Clear congestion with a longer term (one week?) to reduce the effect of outages and unit commitment. More volatile and transient (Day Ahead and real time?) congestion charged to load. –Transmission Investment Flowgate Set Asides –Identify Persistent but Somewhat Approximate Transmission Weaknesses –Identify or Offer Flowgate Increase Opportunities –Calculate & Use Flowgate Shadow Prices –Reserve and Pay-out a New Set Aside Like CBM