Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30, 20019.

Slides:



Advertisements
Similar presentations
Transwestern Pipeline
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
WECC TEPPC Meeting SWAT Update
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Available Capacity to Serve AZ
Natural Gas Market Conditions and Unisource Natural Gas Bills Bob Gray, Arizona Corporation Commission Staff February 24, 2004.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Arizona Corporation Commission Summer Peak 2000 Preparedness Workshop May 17,
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
RB:UMT Arizona Corporation Commission Workshop on Natural Gas Infrastructure NOI February 13, 2004 Phoenix, Arizona.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Arizona Corporation Commission Energy Workshop February 16, 2001.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
APS Ten-Year Plans th BTA Presentation
Puerto Rico Electric Power
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Fuel Prices TEPPC 2026 CC Data Work Group January 26, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
California Gas System Overview
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Navajo Transmission System
Four Corners Wind Resource Center Webinar
Deliverability Maps for 2017 Peaking Capacity RFP
Presentation transcript:

Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30, 20019

10/30/01 ACC Siting Summary 2 A.R.S. § B ACC Balance Test Adequacy Economics Reliability Public Interest Environment Ecology

10/30/01 ACC Siting Summary 3 House Bill 2040 Effective 8/9/01: Power Plants shall file a plan with the Commission 90 days prior to filing an application for a CEC Filed Power Plant plan is confidential All Plans filed with the Commission must now be accompanied by a power flow and stability analysis report showing the effect on the current Arizona transmission system

10/30/01 ACC Siting Summary 4 Generation Adequacy Determination Existing Loads with Reserve Margins Projected Loads with Reserve Margins Replace Older, Less Efficient Plants Competitive Margin Ancillary Services

10/30/01 ACC Siting Summary 5 Proposed Plants in Arizona

10/30/01 ACC Siting Summary 6 Water / Gas Usage All Filed Power Plants

New AZ Power Plants, Gas Supply Basins And Pipelines Approved Plants Pending Plants Future Plants

10/30/01 ACC Siting Summary 8 Source: Presentation to East of California parties by El Paso Natural Gas Company on April 26, 2001

10/30/01 ACC Siting Summary 10 Staff Proposed Measures of Adequacy & Security There should be sufficient transmission import capacity to reliably serve all loads in a utility’s service area without limiting access to more economical or less polluting remote generation New power plants must have sufficient interconnected transmission capacity to reliably deliver its full output without use of remedial action schemes or displacing apriori generation at the same interconnection for single contingency (N-1) outages

10/30/01 ACC Siting Summary 11 Arizona EHV Transmission San Juan Navajo Glen Canyon North Gila Palo Verde Silver King Kyrene Liberty South Saguaro Vail Greenlee Cholla Mohave Mead Four Corners Springerville McKinley Tortolita Phoenix Tucson Yuma Westwing Coronado Pinnacle Peak Transmission Import Constrained Areas

10/30/01 ACC Siting Summary 12 Comparison of Proposed Generation &Transmission

10/30/01 ACC Siting Summary 13 When is Enough ENOUGH? Water Resources Over Utilized Gas Supply or Delivery Capability Exceeded Transmission System Deliverability Exceeded Market Saturated

10/30/01 ACC Siting Summary 14 Questions ?