Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

Rodrick A. Crousey April 18, 2007 GEORGE W. HAYS PK-8 CINCINNATI, OH Mechanical Focus Senior Thesis The Pennsylvania State University Architectural Engineering.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
The Hearst Tower 959 Eighth Avenue New York, NY
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Science & Technology Center. Chestnut Hill Academy - Philadelphia, PA David Klug. Mechanical Option. Advisor - Dr. Freihaut April 15 th, 2009 Architectural.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
SENIOR THESIS PRESENTATION
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
David Sivin – Mechanical Bellevue Ambulatory Care Pavilion AE 882 Senior Thesis Faculty Advisor: Dr. Jelena Srebric The Pennsylvania State University.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Senior Thesis 2013 Ji Won Park Mechanical Option Advisor: Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
The Florida State University Ringling Conservation Center Sarasota, Florida Linda Lewis Mechanical Option Spring 2005.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Lecture Objectives: Cooling towers and modeling Project 1 Thermal storage systems.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Lecture Objectives: Learn about thermal storage systems
Harley-Davidson Museum
Lecture Objectives: Discuss Final Project
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Thermal Energy Storage
Eastern Pennsylvania Laboratory Facility
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Feasibility of Ice Storage
THERMAL STORAGE FEASIBILITY STUDY
Senior Thesis Presentation
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
Tri-Valley Jr./Sr. High School Hegins, PA
Presentation transcript:

Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

General Information BACKGROUND Location: Bronx, NY 6 stories plus 1 mechanical penthouse & 1 floor below grade Approx. Size: 114,000 SF Occupied: Sept Estimated Cost: 75 million PROJECT TEAM Owner: New York School Construction Authority Owner: New York School Construction Authority Architect: The Hillier Group Architecture Architect: The Hillier Group Architecture Structural Engineer: Ysrael A Seinuk, P.C. Structural Engineer: Ysrael A Seinuk, P.C. MEP/Telecom: Joseph R. Loring & Associates, Inc MEP/Telecom: Joseph R. Loring & Associates, Inc Civil Engineer: Langan Engineering Lighting: Lighting Design Collaborative Contractor: Silverite Construction

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Existing Systems (2) 250 Ton -York Air Cooled Reciprocating Chillers (2) 250 Ton -York Air Cooled Reciprocating Chillers (10) York AirPak packaged air handling units (AHU) (10) York AirPak packaged air handling units (AHU) (2) Duel-fired boilers (2) Duel-fired boilers Air Handling Units (AHU)TypeTotal [CFM]Min. Outdoor Air [CFM]OA % AHU 1 [Classrooms & misc.]VAV AHU 2 [Classrooms & misc.]VAV AHU 3 [Gymnasium]CAV AHU 4 [Library]CAV AHU 5 [Lobby & Corridor]CAV AHU 6 [Kitchen]CAV5200/ /100 AHU 7 [Administration]VAV AHU 8 [Dining]CAV AHU 9 [Plant Operations]CAV AHU-10 [Orchestra]CAV TOTAL

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Mechanical Redesign Proposed System Ice Thermal Energy Storage – –Full Storage – –Partial Storage Cold Air Distribution – –Supply Air at 44°F vs. 55°F – –Entering Chilled Water 39°F vs. 44°F Design Goals Reduce high demand costs Downsize the needed chiller capacity Increase chiller efficiency Reduce energy consumption Minimize first cost

Mechanical Redesign Design Procedure Screening Initial Economics Calculating Load Profiles Selecting Storage Type Selecting Operating Strategy Sizing Cooling Plant and Storage Determining Chiller & Equipment Parameters Sizing New Cooling Coils for Cold Air Distribution Laying Schematics Evaluating Economics Finalizing Design

Mechanical Redesign Screening Initial Economics On-Peak Demand Charge$12.17 per kW On-Peak$0.183 per kWh Off-Peak$0.147 per kWh Con Edison Electric Utility Rate for January 2006 *New York State Energy Research and Power Authority

Mechanical Redesign Calculating Load Profiles

Mechanical Redesign Selecting Storage Type Chilled Water Ice Harvesting External Melt Ice-on-Coil Internal Melt Ice-on-Coil Selecting Operating Strategy Full Storage Partial Storage Sizing Cooling Plant & Storage Full Storage Partial Storage

Mechanical Redesign Full Storage (2) 410 ton York propylene glycol chillers (2) 1400 gpm Marley cooling towers (6) 486 ton-hour Calmac IceBank (model 1500C) ice storage tanks (1) 162 ton-hour Calmac IceBank (model 1190C) ice storage tanks

Mechanical Redesign Partial Storage (2) 240 ton York propylene glycol chillers (2) 800 gpm Marley cooling towers (3) 486 ton-hour Calmac IceBank (model 1500C) ice storage tanks (2) 162 ton-hour Calmac IceBank (model 1190C) ice storage tanks

Mechanical Redesign Determining Chiller & Equipment Parameters “n+1” rule of thumb Chiller Upstream vs. Downstream Chiller Priority vs. Storage Priority

Mechanical Redesign Sizing New Cooling Coils for Cold Air Distribution CFMGPMSensible Original Coil Data Redesigned Coil Data Laying Schematics

Mechanical Redesign Partial StorageFull Storage Payback (yrs) ConventionalPartial StorageFull Storage Total$2,260,237.00$2,110,891.00$2,352, Savings -$149, $92, Evaluating Economics Operating Cost Payback Period First Cost Conventional SystemPartial StorageFull Storage Demand Cost (kW)26, , Operating Cost (kWh)49, , , Total Annual Cost75, , , Total Savings-13, ,466.17

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Electrical Considerations Electrical Considerations Construction Considerations Construction Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Structural Considerations Existing Conditions Steel Frame & Concrete on Metal Deck Beams in Question: HSS 16 x 6 x 3/8 Required Design Flex Strength = ft-k Required Design Flex Capacity = ft-k HSS 16 x 6 x 3/8 IS OK!!

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Construction Considerations

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Electrical Considerations Current System  A 6000A, 208/120 V, 3 phase, 4 wire 208/480/277 V Transformer (2) 1200A Motor Control Centers OriginalNew AHU AHU AHU AHU AHU AHU AHU-1010 RF-466 RF-510 RF-866 RF-910 RF-1066 Unchanged Loads846 Total Only 40A Reduction Keep Original Designed 1200A MCC

Presentation Outline General Information General Information Existing Systems Existing Systems Mechanical Redesign Mechanical Redesign Structural Considerations Structural Considerations Construction Considerations Construction Considerations Electrical Considerations Electrical Considerations Final Thought Final Thought Questions & maybe answers Questions & maybe answers

Final Thought Design Goals Met!! Reduce high demand costs Downsize the needed chiller capacity Increase chiller efficiency Reduce energy consumption Minimize first cost

Acknowledgements Professors Dr. William P. Bahnfleth Dr. William P. Bahnfleth Dr. James D. Freihaut Dr. James D. Freihaut Dr. Stanley A. Mumma Dr. Stanley A. Mumma Dr. Jelena Srebric Dr. Jelena Srebric Dr. Jae-Weon “JJ” Jeong Dr. Jae-Weon “JJ” Jeong Professional Loring Engineers Students All of my fellow classmates I had the privilege of meeting and working with throughout my years in AE

Questions

Mechanical Redesign CFMGPMSensibleTotal AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU Totals: Sizing New Cooling Coils for Cold Air Distribution CFMGPMSensibleTotal AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU Totals: Original Coil Data New Design Data

Mechanical Redesign Evaluating Economics ConventionalPartial StorageFull Storage MaterialLaborMaterialLaborMaterialLabor Chillers$314,000.00$34,080.00$378,103.00$47,003.00$614,103.00$52, Pumps$9,525.00$1,695.00$22,100.00$1,365.00$22,100.00$1, Air Handling Units$187,050.00$13,185.00$154,750.00$11,985.00$154,750.00$11, Cooling Coils$23,828.00$12,638.00$27,315.00$14,537.00$27,315.00$14, Fans$59,985.00$16,140.00$41,135.00$12,225.00$41,135.00$12, Air Distribution$396,525.00$836,663.00$375,875.00$740,544.00$375,875.00$740, Pipe$128,765.00$157,613.00$103,012.00$126,090.00$103,012.00$126, Pipe Insulations$38,585.00$29,960.00$30,868.00$23,984.00$30,868.00$23, Subtotal$1,158,263.00$1,101,974.00$1,133,158.00$977,733.00$1,369,158.00$983, Grand Total$2,260,237.00$2,110,891.00$2,352, First Cost