1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Installation and Initial Start Up Worldwide Manufacturer of PSA Generators by Laco Remias, Service Engineer, Aftersales & Service.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
Temperature Control Loop
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
CUE – Make Any Pump an E-Pump
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
UT cooling discussion 3 december 2014
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
60kW Thermosiphon control system
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Installation of the T600 at Fermilab CSN2, September 22,
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
7 A/C System Components, Operation, and Service.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Requirements for phaseII Georg Viehhauser. 9/5/092 Introduction This talk is an extract from ATU-SYS-ES It does not contain any reference to the.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Fan Coil Controller FC/S 1.1
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Feedback on transfer line sizing and flow calculations for UT
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Blower-/Fan Coil-Actuator
Tracker cooling loop “check out” draft for discussion
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Presentation transcript:

1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger

2 H. Pernegger/CERNIBL cooling review 15/5/2012 Requirements for IBL Cooling IBL requirements come from planar sensors –Sensor operating up to 1000V –Planar sensors pose most stringent requirements Driven by Sensor operation requirements –Cold to minimize leakage current and its effect on noise –Avoid thermal run-away Beam pipe Bake-out –Detecotr off but cooled to avoid damage to detector from beam pipe heating –Started with layout –Will produce board in the next weeks (Rui) Requirements Document: ATL-IP-ES-0186

3 H. Pernegger/CERNIBL cooling review 15/5/2012 General requirements for IBL cooling “IBL Cooling system” comprises –CO2 cooling plant –Cooling distributions –Controls and monitoring –(environmental gas -> based on existing installation) 14 staves of IBL = 14 cooling circuits starting at manihold at muuon detector sector 5 IBL PP1 = interface from detector to cooling system

4 H. Pernegger/CERNIBL cooling review 15/5/2012 General requirements General Parameters Currently under new simulation and measurements on mock-up

5 H. Pernegger/CERNIBL cooling review 15/5/2012 Operation modes Cold operation –This is the normal running mode during physics operations and detector tests with ATLAS closed. Warm operation – This mode concerns commissioning running during initial detector tests after installation. The distribution line temperature outside the IST shall be kept above the dew point of the cavern to avoid condensation. Annealing operation – This mode is used for beneficial annealing of sensors (leakage current, depletion voltage). The detector is operated warm for a fixed number of days per year with variable power to achieve a specific sensor temperature. Standby operation –This mode is used keep the detector cold during maintenance operations in ATLAS. The IBL detector is off, the cooling system is operated to keep sensors cold. Bake-out operation – This mode is used during the bake-out of the beam pipe. The detector power is switched off and the cooling system removes the heat dissipated from the beam pipe. Redundancy needed in case of cooling failure.

6 H. Pernegger/CERNIBL cooling review 15/5/2012 Operation modes Approximate evaporation temperature [range] and expected sensor temperatures

7 H. Pernegger/CERNIBL cooling review 15/5/2012 Controls Cont. evap. Temperature set point between -40 and loops with on/off valves at muon detector –Manual sufficient according to Olga’s information Monitoring of evap temperature on cooling pipes inside IST: 1 on inlet and 1 on outlet = 28 sensors –Mounting to be agreed with IBL WG DSS signals to be defined together with DSS group –Output (e.g. plat failure) –Input (e.g. DSS stop signal) Filter stages: replaceable filter stages to guarantee cleanliness of on-detector pipework and capillaries

8 H. Pernegger/CERNIBL cooling review 15/5/2012 Schedule Driver: IBL ready for installation: Sept 2013 currently planned At “RFI” date the CO2 cooling plant must be fully commissioned and ready to receive detector for tests –Including controls, monitoring and DCS interfaces Propose CO2 system ready by Sept 2013 up to PP1 connection and all controls Proposed Schedule (for discussion) –Now to July 2012: design completion, final part list & order of components –July 2012 – March 2013: Plant, Distribution and Controls Construction –March 2013 to July 2013: Installation of plant in USA15 and distribution in detector –July-Sept 2013: Commissioning and failure mode tests

9 H. Pernegger/CERNIBL cooling review 15/5/2012 Backup slides

10 H. Pernegger/CERNIBL cooling review 15/5/2012 Calculation of thermal run-away Calculated thermal run-away limits for different stave- performance