SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.

Slides:



Advertisements
Similar presentations
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Advertisements

Chapter 2 Analyzing the Business Case.
Introduction to Integrated Library Systems
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
Chapter 3 Project Initiation
Lecture 8 Selecting a Healthcare Information System (Chapter 8)
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
Acquiring Information Systems and Applications
The Outsourcing Process
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Lecture 6 Generating and Selecting Design Alternatives IMS1002 /CSE1205 Systems Analysis and Design.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
Managing Project Procurement
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
MBI 630: Class 3 9/12/2009 OUTLINE OF CLASS Discussion –Identifying and Selecting IS Development Projects –Initiating and Planning System Development Projects.
Preparing for Automation Dr. Dania Bilal IS 582 Spring 2006.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Acquiring Information Systems and Applications
Migrating Library Systems Migrating Data Dianne Schaefer Social Law Library American Association of Law Libraries Minneapolis, Minnesota July 15, 2001.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
Acquiring Information Systems and Applications
CHAPTER 13 Acquiring Information Systems and Applications.
SDLC Phase 1: Project Identification & Planning Dr. Dania Bilal IS 582 Spring 2009.
System Selection Dania Bilal IS 592 Spring The Selection Process Review the literature Read the Automated System Marketplace survey for the last.
Preparing for Automation Dr. Dania Bilal IS 582 Spring 2007.
Chapter 11: Alternative Approach - Purchasing Systems.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Chapter 12 The Network Development Life Cycle
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
CHAPTER 13 Acquiring Information Systems and Applications.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Chapter 6 Initiating and Planning Systems Development Projects
Initiating systems development
Business System Development
2 Selecting a Healthcare Information System.
Chapter 4 Systems Planning and Selection
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Selecting a Health Care
How do you prepare a request for proposal (RFP)?
Modern Systems Analysis and Design Third Edition
Chapter 11 Selecting the Best Alternative Design Strategy
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008

Today’s Session SDLC 1: System Selection SDLC 1: System Selection Discuss business and library environments Discuss business and library environments –Project identification and selection –Project initiation and planning Do class activity from last week Do class activity from last week

SDLC Phase 1: Project Identification (Runs parallel with planning) (Runs parallel with planning) Identify potential projects Identify potential projects –Reasons  Replace or improve an existing system  Make system more efficient, less costly to operate, and/or use an existing system in a new –Top-down (e.g., CEO) & bottom-up sources (senior IS manager)

Project Identification Rank projects based on merit Rank projects based on merit –Use criteria and ask questions such as  To what extent does project X provide benefits or value or help the organization meet its strategic objectives and long-term goals? Select project with highest rating, delay project with lower rating, and/or reject project. Select project with highest rating, delay project with lower rating, and/or reject project.

Project Identification In libraries, preparing or planning for automation is a similar process. In libraries, preparing or planning for automation is a similar process. –Automation committee assesses need for new system, upgrade existing system, or use a third party module to run with an existing system –Refer to Bilal, chapter 2 and class notes

Project Initiation Definition of tasks and who will perform them Definition of tasks and who will perform them Size, scope, complexity of project Size, scope, complexity of project Make assumptions about Make assumptions about –Potential problems –Resource availability

Project Initiation Assessment of tangible benefits Assessment of tangible benefits –Can be measured in dollars and with certainty –Examples: error reduction, increased productivity, increased efficiency Assessment of intangible benefits Assessment of intangible benefits –Cannot be measured in dollars –Examples: Convenient access from remote locations, better access to resources

Project Initiation Project costs Project costs –Tangible cost –Intangible costs Students: provide an example of each.

Project Initiation Feasibility assessment Feasibility assessment –Technical –Schedule –Legal –Political

Project Initiation Documents Documents –To Justify need for information system (Business Case document)  Benefits, costs, feasibility, etc. –Baseline Project Plan (BPP)  System description, feasibility assessment, management issues (see Valacich et al, p. 97)

Project Initiation Business vs. library environment Business vs. library environment –Business  Activities performed to design and develop a system –Library  Activities performed to acquire a system if outsourcing or an open system is the option.

Library Environment: Selection Process After reviewing LJ article, LTR, and other sources, and after consulting with colleagues, etc. After reviewing LJ article, LTR, and other sources, and after consulting with colleagues, etc. –Identify six most suitable software packages –Find evaluation of each package in Library Technology Reports (latest issues) and other sources

Library Environment: Selection Process –Acquire the latest demo for each package from software vendor to preview, or review package on the Web, if provided. –Use each module in package –Take notes and/or use a checklist and indicate features you like, dislike. –Identify lacking features –Write down questions to ask of vendor or software representative.

Library Environment: Selection Process Invite a sales rep. from each company for a presentation of software. Invite a sales rep. from each company for a presentation of software. Again, take notes about strengths and weaknesses of software. Again, take notes about strengths and weaknesses of software. Ask questions and don’t be intimidated! Ask questions and don’t be intimidated!

Library Environment: Selection Process Read literature (e.g., brochures) from each company and identify further features supported, hardware requirements, cost, other services provided, etc. Read literature (e.g., brochures) from each company and identify further features supported, hardware requirements, cost, other services provided, etc. Meet as a Committee to discuss each rep.’s presentation and compare notes. Meet as a Committee to discuss each rep.’s presentation and compare notes.

Library Environment: Selection Process Explore types of software available Explore types of software available –Developed by vendor (turnkey) –Open source –Locally developed –A mix of options Assess benefits & pitfalls of each Assess benefits & pitfalls of each

Library Environment: Selection Process If outsourcing is the option Narrow choices to 3 software packages Narrow choices to 3 software packages Class activity Class activity –How will you narrow the packages to 3?

Library Environment: Selection Process Strengths of each module provided: Strengths of each module provided: –Overall software capabilities (Web-based, Windows-based, expandability, etc.) –Compliance with latest standards –Architecture and operating systems supported (e.g., NT, Unix, Linux)

Library Environment: Selection Process Software update, documentation, training and cost, maintenance and technical support Software update, documentation, training and cost, maintenance and technical support After gathering all information, develop a Request for Information (RFI). After gathering all information, develop a Request for Information (RFI). Develop a Request for Proposal RFP). Develop a Request for Proposal RFP).

Request for Proposal (RFP) Develop one RFP with required and desired specifications for the software. Develop one RFP with required and desired specifications for the software. RFP describes needs and priorities RFP describes needs and priorities –Each vendor’s response to RFP provides basis for comparing specifications and other services software company provides

Organization of the RFP Instructions to Vendor Instructions to Vendor Introduction to the library Introduction to the library Software specifications Software specifications Hardware specifications Hardware specifications Request for price quotation Request for price quotation Notice of intent to respond Notice of intent to respond

Organization of the RFP Review the RFP before sending it Review the RFP before sending it Evaluate responses to the RFP from each of the three vendors Evaluate responses to the RFP from each of the three vendors Rank RFPs Rank RFPs Negotiate purchase of top-rated RFP Negotiate purchase of top-rated RFP

Legal/Contractual Agreement Work (administrator higher in rank does this) with an attorney about contract for securing software selected Work (administrator higher in rank does this) with an attorney about contract for securing software selected Agreement details Agreement details –Schedule for software delivery, installation, testing, and implementation –Schedule for training personnel –Vendor’s promise to deliver the package that meets the specifications stipulated in the final RFP

Legal/Contractual Agreement –Vendor’s comments or explanations about certain specifications, rating of features, etc. –Payment plan  Consider paying in three installations: 1/3 upon signing contract, 1/3 upon successful installation and performance testing, and the rest upon successful performance over time.

DO and Not DO! See Bilal, pp See Bilal, pp –The Do Not Do List –The Do List (key things to remember)

Sample RFPs and RFIs Visit Visit – (Integrated Library Systems Reports)

Vendors and Products Visit these sites Visit these sites – – search.pl?SID= &UID=&a uth= search.pl?SID= &UID=&a uth= search.pl?SID= &UID=&a uth=

Business Environment Create a Statement of Work Create a Statement of Work –Outlines goals, objectives, requirements –Describes deliverables –Indicates timeline for project completion –Describes tasks and responsibilities and who will perform them –Other