Washington School District Project. General Requirements: Functional =7-10 Years 100X Growth in LAN 2X Growth in WAN 10X Growth in Internet Connectivity.

Slides:



Advertisements
Similar presentations
Chapter 7: Intranet LAN Design
Advertisements

S4 C1 REVIEW. Review Topics Switching, VLANs, LAN Design, Routing Protocols (especially IGRP), ACLs, and IPX Why use LAN switching and VLANs Must gather.
/30 Host Name : R1 Serial 0/0/0.1.2 Host Name : R2 Router Lab 3 : 2 - Routers Connection DTE DCE.
TCS – Sunset Elementary Pat Bruen, Conor Buckley, James Gallagher
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
SUNNYSLOPE SCHOOL PROJECT BY SWG ENGINEERING Group Members CINDY CINDY STEVE STEVE GALLO GALLO York Technical College Cisco Networking ACADEMY.
Cisco 3 - Switches Perrine - Brierley Page 15/10/2015 Module 5 Switches LAN Design LAN Switches.
Threaded Case Study on RE Miller By Aidan Coleman Paul Guilfoyle.
Washington School District Computer Network System Threaded Case Study Jim, Jeff, Pete, Adam, Chris  100X LAN Growth  2X WAN Growth  1.0 Mbps to any.
Threaded Case Study - RE Miller (Nick Effler, Brian Ford, Cindy Coultas & Teresa Duchardt) April-May, 2000 b Project Goals Implement WAN Access to connect.
CCSE NETWORK STRUCTURE. CCSE NETWORK OUTLINE Mid-sized Building Network spanning over Building 22 and Building 23. Autonomous from ITC’s KFUPM Domain.
IS Network and Telecommunications Risks
WASHINGTON SCHOOL PROJECT WAN DESIGN PROPOSAL This is a sample project completed by previous students. You may look at this, but in NO way copy or use.
Washington District Networking Project Presented by Pat Kearney Pauric Fahey Seamus Leyden.
Ch.6 - Switches CCNA 3 version 3.0.
IT. Support Networking Threaded Case Study School: R.E. Miller By: Shane Coyne. Andrea Martyn. Gary Hall. Barry Gray. Presented by: Gary Hall & Andrea.
Desert View High School Group Members: Group Members: Killian McLoughlin.Killian McLoughlin. JP SheridanJP Sheridan Kevin Traynor.Kevin Traynor.
ROYAL PALM NETWORK PROJECT John Healy Tom Jamieson
Networking Project Ailis&Louise. General Requirements The Washington School District is in the process of implementing an enterprise wide network which.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
Service Providers & Data Link & Physical layers Week 4 Lecture 1.
THREADED CASE STUDY SUNNYSLOPE Presented to Michael Barrett and Paul Flynn.
ACACIA Threaded Case Study Seamus Burns Ronan Conaghan Eugene Cullen.
Acacia Threaded Case Study Aoife McIntyre Cordelia Carty Mary Kearns.
ACACIA Threaded Case Study Presented By: Louise Maguire, Caroline Kearney, Peter Honeyman, Michael Mctague.
Copyright 2002 Year 2 - Chapter 4/Cisco 3 - Module 4 LAN Design By Carl Marandola.
INTRODUCTION TO COMPUTER NETWORKS Navpreet Singh Computer Centre Indian Institute of Technology Kanpur Kanpur INDIA (Ph : ,
Secure Network Design: Designing a Secure Local Area Network IT352 | Network Security |Najwa AlGhamdi1 Case Study
TCP/IP Addressing Design. Objectives Choose an appropriate IP addressing scheme based on business and technical requirements Identify IP addressing problems.
Treaded Case Study Computer Networks 2002 Daire Sheriden Ronan Monaghan Mark Gilmore.
NETWORKING COMPONENTS La’Trena Barrett CECS
Cable.ppt CCNA Exploration Semester 1 Chapter 10
Cisco’s Threaded Case Study Desert View
Interior Gateway Routing Protocol (IGRP) is a distance vector interior routing protocol (IGP) invented by Cisco. It is used by routers to exchange routing.
Royal Palm WAN & LAN Layout and Design
Virtual Local Area Networks. Should I V-LAN? 1. Security V-LANs can restrict access to network resources.
Cisco PIX firewall Set up 3 security zones ***CS580*** John Trafecanty Jules R. Nya Baweu August 23, 2005.
Cisco Threaded Case Study
ACM 511 Chapter 2. Communication Communicating the Messages The best approach is to divide the data into smaller, more manageable pieces to send over.
Repeaters and Hubs Repeaters: simplest type of connectivity devices that regenerate a digital signal Operate in Physical layer Cannot improve or correct.
By H.B.O. Systems July 13, 2000 Presenters: Janet Hughes, John Banister, Karen Oliver.
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
Threaded Case Study for Phoenix, AZ. School District Sunny Slope & Sunset Elementary present by Todd Thousand, Bill Siepel, and Jeff Moore.
Cisco 3 - LAN Perrine. J Page 110/20/2015 Chapter 8 VLAN VLAN: is a logical grouping grouped by: function department application VLAN configuration is.
Author: Bill Buchanan. 1. Broadcast: What is the MAC address of this network address? 2. Requested host: All the hosts read the broadcast and checks.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
Access Control Lists Accessing the WAN – Chapter 5.
Copyright 2002Cisco Press: CCNA Instructor’s Manual Year 2 - Chapter 4/Cisco 3 - Module 4 LAN Design.
OS Services And Networking Support Juan Wang Qi Pan Department of Computer Science Southeastern University August 1999.
Cisco 3 - Switch Perrine. J Page 111/6/2015 Chapter 5 At which layer of the 3-layer design component would users with common interests be grouped? 1.Access.
Desert View TCS By Charlene Cooley and Dan Austin.
1 Semester 3 Threaded Case Study Royal Palm A/3B Ip Siu Tik Tsang Man Wu Wai Hung Wong Lai Ting.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
LAN DESIGN – first step 5 ISB – school year 2006/07.
Cisco 3 - Switches Perrine - Brierley Page 112/1/2015 Module 5 Switches.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
ACCESS CONTROL LIST.
The Washington School District Mike, Mark, Joy, Armando, & Mona.
Network Proposal for Mountain Sky Elementary School
OSI Model Topology Patch cable Flow control Common layer 2 device Best path Purpose of Layer 2 devices.
Presentation on TCS By : 1. Ershad Islam 2. Maung Han Soey 3. Shaon Shahriar 4. Ahsanul Haque.
Threaded Case Study of Bangladesh Internet Press Ltd. (BIPL) By: Md. Ikbal Zavid Abul Kalam Asad Supervise By: Debanon Datta Legal Main Contact, CNAP Ahsanullah.
What are the two types of routes used by network administrators? Static Dynamic.
Threaded Case Study Acacia School Project Project Members: Md. Shafayet Hossain Md. Shakhawat Hossain Md. Moniruzzaman Md. Maksudur Rahman.
Accessing the WAN – Chapter 5
Accessing the WAN – Chapter 5
Accessing the WAN – Chapter 5
Module 5 - Switches CCNA 3 version 3.0.
OSI Reference Model Kashif Ishaq.
Presentation transcript:

Washington School District Project

General Requirements: Functional =7-10 Years 100X Growth in LAN 2X Growth in WAN 10X Growth in Internet Connectivity Initial Assumptions: 1 Mbps Hosts 100 Mbps Servers Protocols Allowed = TCP/IP and IPX Present State of Network

Number of Users: Region Hub 1: One District Office/Data Center [75(A)+11[250(C) + 75(A)]=3650 connections Region Hub 2: One Service Center [75(A)+11[250(C) + 75(A)]=3650 connections Region Hub 3: Shaw Butte [11[250(C) + 75(A)]=3575 connections Total = connections Each Class Room is 24 Student + 1 Teacher = 25 connections Per Class rooms With 250/25=10 Class rooms Need Wiring

To Meet Requirements: 2X WAN Core DS3 10X Internet DS3 Frame Relay with Backup PVC’s Wan Connections

R. E. Miller Local Area Network & Wiring Scheme

Gigabit Switches Available for backbone From Switch to Switch MDF 5500 Chassis Router Extra - We have decided to put in a WIC Card for integrating the PBX to create a uniform dial Plan ability ( 4 Digit Dialing) (100X) Growth in LAN Criteria has been met Local Area Network & Wiring Scheme

6 Services Per School & District Offices DNS DHCP SNMP Administrative Library Application At District only TFTP server Larger Scale servers Each Server will have its own backup service Enterprise Class Servers DNS, DHCP, Application Library Server Workgroup Class Servers SNMP, HP-Open view Administration TFTP District Supplied Servers and Functions

USER ID and PASSWORD POLICY 1. USER ID · First six digits of last name, First initial of first name, number · (SmithJ1, SmithJ2, JohnsoM1) 2. PASSWORD · Maximum Password Age – 30 days · Minimum Password Age – 30 days · Minimum Password Length – 8 characters · Password Uniqueness – 12 · Account Lockout Security

stable routing in very large or complex networks. (No routing loops) fast response to changes in network topology low overhead splitting traffic among several parallel routes taking into account error rates and level of traffic on different paths IGRP

Addressing and Management Using Class B Addressing 3 Subnets Router gateway Administrative Curriculum 2 Subnets Unused Static addressing for Administrative Subnet Curriculum addressing will be provided by VLAN and DHCP Borrowing 8-bits will allow for up to 254 usable with subnet masks of

Addressing and Management SchoolGatewayHost RangeBroadcast Subnet MaskVLAN Desert view Admin Student Acacia Admin Student REMiller Admin Student

Security Data Center ACL's: Data Center2 (config)#access-list 101 permit tcp established Data Center2 (config) # interface SO Data Center2 (config-if)# ip access-group 101 out R.E.Miller ACL's: R.E.Miller(config)#access-list 103 permit tcp any eq 25 R.E.Miller(config)#access-list 103 permit tcp any eq 53 R.E.Miller(config)#access-list 103 deny ip R.E.Miller(config)#access-list 103 permit ip any any R.E.Miller(config)# interface E1 R.E.Miller(config-if)# ip access-group 103 out R.E.Miller(config)#access-list 105 deny tcp any eq 21 R.E.Miller(config)#access-list 105 deny tcp any eq 23 R.E.Miller(config)#access-list 105 permit ip any any R.E.Miller(config)# interface E0 R.E.Miller(config-if)# ip access-group 105 in ACL

Firewall Block intrusion with firewall and intrusion detection software Also utilizing ACL list

IDF Switches Catalyst 3548 XL Enterprise Edition WSC3548-XL-EN $4,995 Gigabit uplinks Multimode fiber Stackable VLAN Support

MDF Routers and Switches 1 WAN Connection 108 Fast Ethernet Connections 9 Multimode Fiber connections Total List cost $85,465

District MDF Routers and Switches 3 Wan Connections 108 Fast Ethernet Connections Total List Cost $72,460

Firewall Router Cisco 7120 Cisco PIX Firewall Software with Intrusion Detection Total List Cost $41,000

Total Cost 30 IDF Switches$149,850 3MDF Switches$256,395 3District MDF Switches$217,380 1Firewall Router$ 41,000 Total List Cost$627,725 * Discount of 40% *.6 Total Parts Cost$376,635 Labor is $50 per port run$ 56,250 Setup of IDF’s and MDF’s$210,000 Servers and Software$740,000 Total Project Cost $1,382,615