ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Advertisements

PCB Design for 1 Gbps ECE 4006 Dr Brooke. Overview What signals are being routed? How can you route those signals? How to apply routing to PCB? PCB design.
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Bringing Gigabit Ethernet to the Masses Supervisor: Dr. Martin.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
© 2001 By Default! A Free sample background from Slide 1 Gigabit Optical Ethernet ECE 4006C – Spring 2002 – G1 Team Ryan.
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r Astou Thiongane,
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Receiver Group G1 David Gewertz Ryan Baldwin.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 4006 Group 6 – Presentation 8
Status Presentation February 20-27, 2003 Michelle Middleton.
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
Presentation transcript:

ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh

Group Management Plan Vikas Parekh – Group manager, background research, scheduling and budgets. Theron Davis – Webmaster, chief editor and solder expert. Dominic Saltarelli – Design and testing of the Rx/Tx board. Gautam Khanna – Design and testing of the Rx/Tx board. Akil Sutton – Optical Link Budget and inventory management.

Gigabit Ethernet OLB OLB 4 Corners Analysis – Components used in fabrication highlighted

Problems with the First Run No decoupling capacitors for the input and output pins of the Transmitter MAXIM chip – design problem. Bad soldering. Too much board surgery – inexperience.

Further Problems VCSEL set up backwards – plain dumb. Ground plane was shorted at several joints – again bad soldering. Very poor results. The output is shown here with the mod current at 7 mA and the bias current at 9.38 mA.

Second Board Design Layout After debugging our problems with the transceiver board, we realized that most of the problems were mainly design related. Hence, we decided to design a second run in order to get better results. Solving these problems in the second design involved five revisions to the original design and a more careful approach to the soldering of the second run.

Issues considered in the 2 nd run The ground plane was separated from all non-ground elements by at least 2mm. The power supply jack was switched so the plug would face away from the board. Three extra capacitors were added to the design, decoupling the input and output pins connected to power supplies on the laser driver chip. Also, the under board power modulation current trace was moved up, providing a straight line of conduction between the laser ground and the laser driver ground. Lastly, shielding was added to the top of the board to restrict crosstalk from the transmitter to the receiver.

Progress in the Last week Second run assembled. Extensive Testing of the Transceiver board. Alignment testing. Final Paper completed. Bill of Materials prepared. Final Financial Budget drawn up.

Second Run of Rx/Tx board Soldered the second board. Extra care taken to obtain clean soldering joints and avoid damage to the components due to heat of the solder.

Presentation of the Results Independently, both the transmitter and the receiver worked. The top picture shows the Rx baseline test with PRBS7. The bottom picture shows the Tx baseline test with PRBS7.

Problems with Rx sensitivity The problem lay with the actual design – as opposed to a problem in the selection of components or soldering. The garbled picture depicts the test for Rx attenuation of 5dB.

No problems with Tx sensitivity Figure: Tx PRBS7, 0.5 mW output, 5dB attenuation Figure: Tx PRBS7, 0.9 mW output, 5dB attenuation Figure: Tx PRBS7, 0.9 mW output, 10dB attenuationFigure: Tx PRBS7, 1.25 mW output, 15dB attenuation

Loopback Test When the loopback test was performed, the output was the laser was reset back to 0.9mW of output, achieved by setting the bias current to 9mA and the mod current to 7mA.

Sensitivity/Crosstalk Issues (again) The problem with receiver sensitivity arose when the output of the laser, which was already running at close to eye safe, was attenuated by 5dB. Even the D21.5 pattern showed jitter with this setup, and PRBS7 was unrecognizable. This loss of signal could not be attributed to receiver sensitivity alone, since 5dB of attenuation of a 0.9mW signal should still be robust enough to drive the PD. The crosswalk between the transmitter and receiver was measured by feeding a signal into the transmitter, and reading the output of the receiver without a fiber connecting the laser to the PD. The results show that the interference is not due to crosswalk alone.

Continued The lowest frequency signal, D21.5, translates rather cleanly from the transmitter to the receiver. But with higher frequency patterns, more frequencies are being transmitted to the receiver.

Gigabit Ethernet Alignment Tolerance Unconnectorized S7912 Rx produced eyes with significant jitter off of the “sweet spot” “Sweet Spot” deviation as Z increases. Increased coupling in the lateral direction possibly on account of fiber orientation and PD positioning Sweet Spot Off Center

Financial Budget

Bill Of Materials (BOM)

Final Gannt Chart

Special Thanks TA: Nickolas Kingsley ECE Administrators: Gwen Selena Martin Brooke/ Nan Jokerst