Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC 202-393-1200.

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Presented to the WECC MIC June 15, 2007
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
MERCHANDISING COMPANY
GIA Tariff Changes GIA Billing Workshop May 24, 2005 For Discussion and Informational Purposes Only.
WHAT’S NEW IN HOTEL CONTRACTS
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Public Exchange Clarification Briefing June 2009.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Reporting and Interpreting Liabilities Chapter 9.
CH1 INTERNATIONAL TRADE CONTRACTS
1 I. General Rules and Definition Article 1 Application of UCP Article 2 Definitions Article 3 Interpretations Article 4 Credits v. Contracts Article 5.
September - November 2011 Slide 1 tml МГИМО – СТРУКТУРА – МИУ – АНОНСЫ.
WSPP REC Webinar Discussion Outline September 7, 2011 Arnold Podgorsky WSPP Legal Counsel
WSPP REC Training A Walk Through The REC Schedule WSPP Webinar August 24, 2011 Arnold Podgorsky WSPP Legal Counsel
◦ (a) The prior period's closing balances have been correctly brought forward to the current period or, when appropriate, have been restated; and ◦ (b)
Arnold Podgorsky Wright & Talisman PC February 3, 2011.
WSPP Operating Committee Spring 2008 LEGAL UPDATE Arnie Podgorsky Wright & Talisman, PC This educational presentation states no legal opinion of WSPP or.
WSPP REC Training A Walk Through The REC Schedule WSPP Webinar August 24, 2011 Updated (corrected) Version 9/5/2011 Arnold Podgorsky WSPP Legal Counsel.
Introductory Microeconomics ES10001 Topic 1: Introduction to Markets Sales and Purchase Tax.
Richard E. Thompson II, Esq.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
WSPP Contract Subcommittee February 3, 2011 Meeting Notes These notes are to facilitate discussions of a WSPP REC Service Schedule, are subject to revision,
CMA Part 2 Financial Decision Making Study Unit 5 - Financial Instruments and Cost of Capital Ronald Schmidt, CMA, CFM.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Simplified & Reorganized Tariff Docket No. ER FERC Technical Conference December 7, 2005 Sidney M. Davies Assistant General Counsel-Tariff David.
Western Energy Markets Working Group Form of California ISO Market Redesign and Technology Upgrade (MRTU) Contract Amendment Panelist: Jeremy D. Weinstein.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Forms of Business and Formation of Partnerships Chapter 37.
4-1 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 Financial Forecasting.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
Accounting (Basics) - Lecture 8 Liabilities and Equity.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Resource Cost Working Group December 2, 2015 WMS Update.
Terms of Service Agreements What does the fine print really contain?
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Damages for Late Payment of Insurance and Reinsurance Claims Mexican Legal Framework AIDA Europe, Reinsurance Working Group, Paris 2 December, 2015 Yves.
Accounting (Basics) - Lecture 5 Impairment of assets.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
A derivative is a security, whose price is dependent upon or derived from one or more underlying assets. The derivative itself is merely a contract between.
Accounting (Basics) - Lecture 6 Provisions and contingencies.
Proposed Schedules: Reserves (D) and Intra-Hour Firming (E) October 13, 2009.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Explanation of Revised Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Transmission Losses Physical System Operations. Transmission Losses NERC’s definition(s): Electric System Losses Total electric energy losses in the electric.
Four Ways Suppliers Limit Their Risk Contractually
Accounting (Basics) - Lecture 5 Impairment of assets
Fuel Cost Components in the Fuel Adder
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
DRAFT- April 3, 2001 Restructuring Proposal to Brazos Electric Power Cooperative, Inc. April 6, 2001 This Information is CONFIDENTIAL Per Section 5 of.
Current FRRS Language & Explanation of Posted Data
Fuel Cost Components in the Fuel Adder
P.Krishnaveni/Financial Derivatives/MBA/SNSCT
Section 21 Provisions & Contingencies
Understanding Bonding Requirements
Provisions, contingent liabilities and contingent assets
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC

2 The Proposed Schedule - general  Product: from generation capacity that can respond within applicable NERC etc. criteria.  Purchaser is BA, RSG or entity having obligation to provide operating reserve to BA or RSG.  Price may have capacity (demand) and energy components  Provide measure of damages tailored to operating reserve product.

3 August Revisions to Proposed Schedule D  Section D-3 – Terms of Service o Most terms are same as in previous draft, but provision is reorganized to create more logical flow and to clarify certain terms in accordance with Subcommittee comments: o Required designation of RRO/BA/RSG with whose standards/criteria the parties agree to conform is moved to Section D-3.1. o Section D-3.2 describes scope of Seller’s obligation to provide Operating Reserve Service; D-3.3 describes scope of Purchaser’s right to call on such service.

4 August Revisions to Proposed Schedule D (cont’d)  Section D-3 – Pricing (cont’d) o Section D-3.4, Pricing, is reorganized in effort to clarify anticipated pricing structure and when and to whom FERC-imposed price caps apply. o Generally applicable pricing term now incorporates peak/off-peak pricing per Subcommittee’s discussion, subject to Parties’ ability to apply a different pricing scheme in Confirmation (e.g., if service is contemplated only during on-peak periods).  The new terms “On-Peak” and “Off-Peak” are NERC-defined terms.  Section D elaborates on Purchaser’s right to return energy to Seller, incorporates 1.5:1 maximum exchange ratio (like Service Schedule C), and provides for a time limit on such returns, though exact time frame is TBD.  Section D now provides that monthly energy charge will be determined by value of energy delivered by Seller netted against value of any energy returned by Purchaser.

5 August Revisions to Proposed Schedule D (cont’d)  Section D-3 – Pricing (cont’d)  Price cap provision is now Section D-3.4.6; terms are the same as in previous draft (and in other WSPP Service Schedules), but are revised to try to make clearer, per Subcommittee comments, when and to whom the price caps will apply.

6 August Revisions to Proposed Schedule D (cont’d)  Section D-4 – Damages o Damages provisions are modified from the previous draft to reflect Subcommittee’s direction to develop objective damages measures while avoiding penalties. o Prefatory legal language is added in Section D-4.2 stating that damages calculated in accordance with the service schedule are not a penalty. o For Seller’s non-performance, Section D-4.3 of the new draft provides that damages will be a pro rata share of the capacity charge and any transmission reservation charge based on duration of non-performance, plus the smallest of the following three alternative amounts (but not less than zero): o The quantity of energy Seller failed to deliver multiplied by an Hourly Index Price (which is yet to be determined/defined), OR o Replacement Price less Contract Price, plus any net increase in transmission charges incurred to acquire replacement energy, OR o Quantity Seller failed to deliver multiplied by 120% of Parties’ agreed energy charge.

7 August Revisions to Proposed Schedule D (cont’d)  Section D Seller Damages cont’d o Alternatively, in lieu of any payment under the provisions just described, Purchaser may require Seller to provide Operating Reserve Service with no capacity or transmission charges for three consecutive business days prior to the end of the Term. o In addition, Seller will be liable to Purchaser for any NERC or other penalties or fines imposed on Purchaser to the extent such amounts are attributable to Seller’s failure to perform. o Draft includes for discussion a possible cap on Seller’s penalty liability equal to the amount of one or two months’ capacity charges for Operating Reserve Service. o Purpose of cap would be to minimize disincentive to market participants to sell Operating Reserve Service.

8 August Revisions to Proposed Schedule D (cont’d)  Section D Damages for Purchaser’s Unauthorized Takes o This provision applies in the event Purchaser (or Purchaser’s BA or RSG) takes energy under Operating Reserve Service for any purpose that does not conform with applicable standards/criteria for deployment of operating reserve. o In the event of unauthorized takes, Purchaser shall pay Seller as damages the smallest positive amount under the following three alternative calculations: o The quantity of unauthorized energy taken multiplied by an Hourly Index Price (index yet to be determined/defined), OR o Resale Price less Contract Price for the unauthorized energy, less the amount of any net additional transmission cost Seller would have incurred to achieve Resale Price, OR o Quantity of unauthorized energy multiplied by 120% of Parties’ agreed energy charge.

9 August Revisions to Proposed Schedule D (cont’d)  Subcommittee may wish to consider whether Section D-4.4 should also include an alternative amount of damages to be paid by Purchaser in the event the provisions just described would result in no payment to Seller.

10 Let’s Discuss  Reactions to the modified provisions we have discussed.