Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
DOE Review, 7/15/2010GianLuca SabbiMagnet Systems - Progress and Plans Magnet Systems Summary Progress and Plans GianLuca Sabbi DOE Review of the LHC Accelerator.
CERN, 11th November 2011 Hi-lumi meeting
HL-LHC Magnet components and assemblies
TQS Overview and recent progress
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Glyn Kirby Magnet AssemblyTechniques.
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015

Title – xxxx 2 LARP & US-HiLumi LARP (LHC Accelerator Research Program) — A collaboration among BNL, FNAL, LBNL & SLAC — Goals: make more luminosity, earlier collaborate in interaction region upgrades, to make even more luminosity, later use, develop, and preserve unique U.S. resources and capabilities. — May not deliver deliverables US-HiLumi will be a Project — LARP has been charged to prepare the path for this future project

Title – xxxx 3 SQ SM TQS LR LQS HQ TQC LARP Magnets (2003-now)

Title – xxxx 4 90 mm Aperture Quads Short & Long Short models (1 m): Understanding stress vs degradation  safe preload 1000 power cycles with no degradation Long models (3.4 m): Demonstration of scale-up Demonstration of excellent training memory

Title – xxxx 5 Goal: demonstrate all performance requirements for Nb 3 Sn IR Quads in the range of interest for HL-LHC (magnetic, mechanical, quench protection etc.) Main design parameters and features in the latest models tested (HQ02a/b): Conductor and cable Strand diam. (mm)0.778 Cu/Sc1.2 No. strands35 Cable width (mm)14.8 Cable thickness (mm)1.375 Keystone angle (deg.)0.75 HQ02 Short Sample Performance Param.4.5K1.9K I ss [kA] B pk [T] G ss [T/m] Al shell Coil Bladder locations Alignment key Iron yoke Al collar 120 mm Aperture HQ

Title – xxxx 6 Accelerator Quality Order of magnitude reduction of dynamic effects (ramp rate, field quality) with cable core Quench performance HQ02b: fast training to 95% level with 200 MPa pre-load HQ03: 1 st quench at 81.5 SSL Quench protection 380K quench temperature without degradation Successful first test of the CLIQ system in Nb 3 Sn 250K 320K 380K HQ02/03 Test Results

Title – xxxx 7 LARP Development of QXF Short Models & Prototypes The LARP plan has been presented by P. Ferracin LARP & CERN short model plans are tightly correlated, and support and strengthen each other By working together LARP & CERN achieve optimization of resources, maximization of return and back-up

Title – xxxx 8 US-HiLumi Project Plan US-HiLumi Magnets Preliminary: — Scope — Top-Level Schedule — Fabrication Plan — Early US Project Milestones — Summary Based on presentation by R. Carcagno at HiLumi-LARP Collaboration Meeting November 19, 2014 Note: assuming 8.0 m magnetic length

Title – xxxx 9 Preliminary US-HiLumi Magnet Scope MQXFA LMQXFA (Q1) LMQXFB (Q3) Five Q1 Cold Masses (LMQXFA) and Five Q3 Cold Masses (LMQXFB) —Each cold mass includes two ~ 4.8m Nb3Sn magnets (MQXFA) installed in a SS helium vessel with end domes, ready for insertion into a cryostat by CERN —Option: deliver magnets (MQXFA) after vertical test

Title – xxxx 10 US-HiLumi Magnets Timeline Tentative plan: —Assumes Q1 and Q3 tunnel installation in CY-2024 —Provides 3.5 years for CERN Q1 and Q3 scope (cryostating, test, etc) —Production Coil winding must start in January 2018 (US Critical Decision 3 DOE approval, CD-3) —Two years of preparations needed for strand and series production tooling procurements, start cable fabrication, etc. —Production throughput based on June 2013 MQXF fabrication plan

Title – xxxx 11 US-HiLumi Preliminary Top Level Schedule Assumes Q1 and Q3 tunnel installation in CY2024 First LMQXFA/B cold mass delivered to CERN summer 2020 Last LMQXFA/B cold mass for tunnel installation delivered to CERN summer 2022 Last LMQXFA/B cold mass spare delivered to CERN summer 2023

Title – xxxx 12 Preliminary Fabrication Plan Plan is based on the production plan presented by M. Anerella during the June 2013 DOE review of LARP plus additional information Nb 3 Sn: — First strand delivery one year after placing purchase order. Last delivery 2 years later. A total of 9,400 Kg will be needed for 90 coils Cable and Insulation (LBNL): — Starts three months after first strand delivery — Throughput starts at 2 UL/month, ramping to a peak rate of 3 UL/month — A total of 90 ULs are needed for 90 coils — Insulation by vendor — Total duration ~ 3 years CERN is back-up for cabling, and LARP is for CERN

Title – xxxx 13 Preliminary Fabrication Plan (Cont.) Coil Fabrication: — Two production lines (FNAL and BNL) — Peak rate: 1 coil every 15 working days First two coils in each facility assumed to take twice as long First 4 coils: 8 months after coil production starts — Total duration for 90 coils ~ 3.5 years — Additional tooling needed at each production line to sustain throughput: One additional winding mandrel assembly Two additional reaction fixtures One additional impregnation fixture Looking at optimizing parts procurement between LARP & CERN

Title – xxxx 14 Preliminary Fabrication Plan (Cont.) Magnet Assembly (LBNL): — Starts ~ 8 months after coil fabrication starts As soon as a set of four coils are delivered — Includes Yoke/Shell structure assembly, coil pack insert assembly, and magnet assembly — Two production lines. In each line, peak rate: 1 coil pack insert every 60 working days 1 yoke/shell assembly every 75 working days (concurrent) 1 magnet assembly every 34 working days — Peak overall rate: 1 magnet every ~ 2.2 months First magnet assumed to take twice as long — Total duration for 20 magnets is ~ 4 years

Title – xxxx 15 Preliminary Fabrication Plan (Cont.) Magnet Test (BNL): — Test and train each magnet in BNL vertical test stand prior to cold mass assembly Needed quantity under consideration It takes ~ 38 working days for a production vertical test Cold Mass Assembly (FNAL): — Connection of two magnets, installation of stainless steel skin and end domes, heat exchanger, bore tube, etc. — Peak rate: 1 cold mass every ~2 months First assembly assumed to take 3 months Cold Mass Test (FNAL): — Insert cold mass in re-usable cryostat and test cold mass in Fermilab’s Horizontal test stand — Peak rate 1 cold mass test every ~3.5 months First test assumed to take 1.5 times longer, second test 1.25 times longer Assumes no prior magnet training Assumes 30 training quenches per magnet

Title – xxxx 16 US-HiLumi Early Milestones Frozen Baseline: — Definitive scope — Detailed resource loaded schedule — Time-phased budget — EVMS-ready Baseline must be frozen before March 2016 Earned Value Management System (EVMS) monthly reporting is required six months prior to the independent Director’s CD-2 review, which is required before a DOE CD-2 review EVMS requires a frozen baseline –Changes after baseline freezing require going through a change control and approval process –Monthly Cost/Schedule variances must be explained and corrective actions put in place

Title – xxxx 17 Summary Plan is based on Q1 and Q3 tunnel installation in 2024 Q1 and Q3 cold masses delivered to CERN starting in summer 2020 — Last cold mass for tunnel installation delivered summer 2022 — Last spare delivered summer 2023 Plan requires start coil production (DOE CD-3 approval) in January 2018 DOE CD-2 approval needed by ~April 2017 — EVMS monthly reporting must start by March 2016 to support Director’s CD-2 review prior to DOE CD-2 review US-HiLumi project baseline must be frozen before March 2016 — Definitive scope, detailed resource-loaded schedule, time- phased budget, EVMS-ready This is a preliminary plan, more details and analysis needed (e.g., incorporate rework/re-test activities)

Title – xxxx 18 Risks & Opportunities Nb 3 Sn superconducting strand2 strand producers Cable fabrication2 cabling machines (LARP & CERN) Coil fabricationComplete lines at 2 US labs Coil partsShare procurement with CERN Magnet assembly Baseline is one lab, but could set up 2 nd line at another lab Structure partsStamped laminations Magnet performance Vertical test of each magnet allows for fast coil substitution