8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Introduction to Management Science
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Chapter 9 Project Management.
PERT/CPM Models for Project Management
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Operations and Supply Chain Management, 8th Edition
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter 8 (Crashing).
Network Planning Methods Example PERT & CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Project Management: A Managerial Approach
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management - CPM/PERT. darla/smbs/vit2 Characteristic of a project A project is a temporary endeavour involving a connected sequence of activities.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations Management Project Management Chapter 3.
Beni Asllani University of Tennessee at Chattanooga
Project Management Chapter 8.
Project Management (專案管理)
Project Management Chapter Topics
Project Management: PERT/CPM
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Planning and Budgeting
Probabilistic Time Estimates
Stevenson 17 Project Management.
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8

8-2 ■The Elements of Project Management ■CPM/PERT Networks ■Probabilistic Activity Times ■Formulating the CPM/PERT Network as a Linear Programming Model Chapter Topics Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-3 ■Network representation is useful for project analysis. ■Project examples: Construction of a building, organization of a conference, installation of a computer system etc. ■Networks show how project activities are organized and are used to determine time duration of projects. ■Network techniques used are: ▪ CPM (Critical Path Method) ▪ PERT (Project Evaluation and Review Technique) ■Developed independently during late 1950’s. Overview Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-4 Elements of Project Management ■Management is generally perceived as concerned with planning, organizing, and control of an ongoing process or activity. ■Project Management is concerned with control of an activity for a relatively short period of time after which management effort ends. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-5 Project Planning ■Objectives ■Project Scope ■Contract Requirements ■Schedules ■Resources ■Control ■Risk and Problem Analysis Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-6 Project Planning ■All activities (steps) of the project should be identified. ■The sequential relationships of the activities (which activity comes first, which follows, etc.) is identified by precedence relationships. ■Steps of project planning: ■Make time estimates for activities, determine project completion time. ■Compare project schedule objectives, determine resource requirements. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-7 Elements of Project Management Project Scheduling ■Project Schedule : Timely completion of project. ■Schedule development steps: 1. Define activities, 2. Sequence activities, 3. Estimate activity times, 4. Construct schedule. ■Gantt chart and CPM/PERT techniques can be useful. ■Computer software packages available, e.g. Microsoft Project. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-8 Elements of Project Management Gantt Chart (1 of 2) ■Popular, traditional technique, also known as a bar chart -developed by Henry Gantt (1914). ■Used in CPM/PERT for monitoring work progress. ■A visual display of project schedule showing activity start and finish times and where extra time is available. ■Suitable for projects with few activities and precedence relationships. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-9 Elements of Project Management Gantt Chart (2 of 2) Figure 8.4 A Gantt chart Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall ■A branch reflects an activity of a project. ■A node represents the beginning and end of activities, referred to as events. ■Branches in the network indicate precedence relationships. ■When an activity is completed at a node, it has been realized. The Project Network CPM/PERT Activity-on-Arc (AOA) Network

8-11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall ■Time duration of activities shown on branches. ■Activities can occur at the same time (concurrently). ■A dummy activity shows a precedence relationship but reflects no passage of time. ■Two or more activities cannot share the same start and end nodes. The Project Network Concurrent Activities Figure 8. 7 A Dummy Activity

8-12 The Project Network House Building Project Data No. ActivityActivity Predecessor Duration (Months) 1. Design house and - 3 obtain financing 2. Lay foundation Order Materials Build house 2, Select paint 2, Select carpet Finish work 4, 6 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-13 The Project Network AOA Network for House Building Project Figure 8.6 Expanded Network for Building a House Showing Concurrent Activities Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-14 The Project Network AON Network for House Building Project Activity-on-Node (AON) Network  A node represents an activity, with its label and time shown on the node  The branches show the precedence relationships  Convention used in Microsoft Project software Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Figure 8.8 Label Duration

8-15 The Project Network Paths Through a Network Table 8.1 Paths Through the House-Building Network Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall PathEvents A12471247 B1256712567 C13471347 D1356713567

8-16 The critical path is the longest path through the network; the minimum time the network can be completed. From Figure 8.8: Path A: 1  2  4  = 9 months Path B: 1  2  5  6  = 8 months Path C: 1  3  4  = 8 months Path D: 1  3  5  6  = 7 months The Project Network The Critical Path Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-17 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall The Project Network Activity Start Times Figure 8.9 Activity start time

8-18 The Project Network Activity-on-Node Configuration Figure 8.10 Activity-on-Node Configuration Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-19 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall ■ES is the earliest time an activity can start: ES = Maximum (EF) ■EF is the earliest start time plus the activity time: EF = ES + t The Project Network Activity Scheduling : Earliest Times Figure 8.11 Earliest activity start and finish times

8-20 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall ■LS is the latest time an activity can start without delaying critical path time: LS = LF - t ■LF is the latest finish time. LF = Minimum (LS) The Project Network Activity Scheduling : Latest Times Figure 8.12 Latest activity start and finish times

8-21 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Slack is the amount of time an activity can be delayed without delaying the project: S = LS – ES = LF - EF Slack Time exists for those activities not on the critical path for which the earliest and latest start times are not equal. The Project Network Activity Slack Time (1 of 2) Table 8.2 *Critical path ActivityLSESLFEFSlack, S * * * *788990

8-22 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall The Project Network Activity Slack Time (2 of 2) Figure 8.13 Activity slack

8-23 ■Activity time estimates usually cannot be made with certainty. ■PERT used for probabilistic activity times. ■In PERT, three time estimates are used: most likely time (m), the optimistic time (a), and the pessimistic time (b). ■These provide an estimate of the mean and variance of a beta distribution: variance: mean (expected time): Probabilistic Activity Times Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-24 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Probabilistic Activity Times Example (1 of 3) Figure 8.14 Network for Installation Order Processing System

8-25 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Probabilistic Activity Times Example (2 of 3) Table 8.3 Activity Time Estimates for Figure 8.14

8-26 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Probabilistic Activity Times Example (3 of 3) Figure 8.15 Earliest and Latest Activity Times

8-27 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall ■Expected project time is the sum of the expected times of the critical path activities. ■Project variance is the sum of the critical path activities’ variances ■The expected project time is assumed to be normally distributed. ■Epected project time (t p ) and variance (v p ) interpreted as the mean (  ) and variance (  2 ) of a normal distribution:  = 25 weeks  2 = 62/9 = 6.9 (weeks) 2 Probabilistic Activity Times Expected Project Time and Variance

8-28 ■Using the normal distribution, probabilities are determined by computing the number of standard deviations (Z) a value is from the mean. ■The Z value is used to find corresponding probability in Table A.1, Appendix A. Probability Analysis of a Project Network (1 of 2) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-29 Probability Analysis of a Project Network (2 of 2) Figure 8.16 Normal Distribution of Network Duration Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-30 What is the probability that the new order processing system will be ready by 30 weeks? µ = 25 weeks  2 = 6.9  = 2.63 weeks Z = (x-  )/  = (30 -25)/2.63 = 1.90 Z value of 1.90 corresponds to probability of.4713 in Table A.1, Appendix A. Probability of completing project in 30 weeks or less: ( ) = Probability Analysis of a Project Network Example 1 (1 of 2) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-31 Probability Analysis of a Project Network Example 1 (2 of 2) Figure 8.17 Probability the Network Will Be Completed in 30 Weeks or Less Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-32 ■A customer will trade elsewhere if the new ordering system is not working within 22 weeks. What is the probability that she will be retained? Z = ( )/2.63 = ■Z value of 1.14 (ignore negative) corresponds to probability of.3729 in Table A.1, appendix A. ■Probability that customer will be retained is ( ) =.1271 Probability Analysis of a Project Network Example 2 (1 of 2) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-33 Probability Analysis of a Project Network Example 2 (2 of 2) Figure 8.18 Probability the Network Will Be Completed in 22 Weeks or Less Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-34 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Given this network and the data on the following slide, determine the expected project completion time and variance, and the probability that the project will be completed in 28 days or less. Example Problem Problem Statement and Data (1 of 2)

8-35 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Example Problem Problem Statement and Data (2 of 2)

8-36 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Example Problem Solution (1 of 4) Step 1: Compute the expected activity times and variances.

8-37 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Example Problem Solution (2 of 4) Step 2: Determine the earliest and latest activity times & slacks

8-38 Example Problem Solution (3 of 4) Step 3: Identify the critical path and compute expected completion time and variance.  Critical path (activities with no slack): 1  3  5  7  Expected project completion time: t p = = 24 days  Variance: v p = 4 + 4/9 + 4/9 + 1/9 = 5 (days) 2 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-39 Example Problem Solution (4 of 4) Step 4: Determine the Probability That the Project Will be Completed in 28 days or less (µ = 24,  =  5) Z = (x -  )/  = (28 -24)/  5 = 1.79 Corresponding probability from Table A.1, Appendix A, is.4633 and P(x  28) = = Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-40 ■Project duration can be reduced by assigning more resources to project activities. ■However, doing this increases project cost. ■Decision is based on analysis of trade-off between time and cost. ■Project crashing is a method for shortening project duration by reducing one or more critical activities to a time less than normal activity time. Project Crashing and Time-Cost Trade-Off Overview Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-41 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Crashing and Time-Cost Trade-Off Example Problem (1 of 5) Figure 8.19 The Project Network for Building a House

8-42 Project Crashing and Time-Cost Trade-Off Example Problem (2 of 5) Figure 8.20 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Crash cost & crash time have a linear relationship:

8-43 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Table 8.4 Project Crashing and Time-Cost Trade-Off Example Problem (3 of 5)

8-44 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Figure 8.21 Network with Normal Activity Times and Weekly Crashing Costs Project Crashing and Time-Cost Trade-Off Example Problem (4 of 5)

8-45 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Figure 8.22 Revised Network with Activity 1 Crashed Project Crashing and Time-Cost Trade-Off Example Problem (5 of 5) As activities are crashed, the critical path may change and several paths may become critical.

8-46 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Exhibit 8.16 Project Crashing and Time-Cost Trade-Off Project Crashing with QM for Windows

8-47 Project Crashing and Time-Cost Trade-Off General Relationship of Time and Cost (1 of 2) ■Project crashing costs and indirect costs have an inverse relationship. ■Crashing costs are highest when the project is shortened. ■Indirect costs increase as the project duration increases. ■Optimal project time is at minimum point on the total cost curve. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-48 Project Crashing and Time-Cost Trade-Off General Relationship of Time and Cost (2 of 2) Figure 8.23 The Time-Cost Trade-Off Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-49 General linear programming model with AOA convention: Minimize Z =  x i subject to: x j - x i  t ij for all activities i  j x i, x j  0 Where: x i = earliest event time of node i x j = earliest event time of node j t ij = time of activity i  j The objective is to minimize the project duration (critical path time). The CPM/PERT Network Formulating as a Linear Programming Model i Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-50 The CPM/PERT Network Example Problem Formulation and Data (1 of 2) Figure 8.24 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-51 Minimize Z = x 1 + x 2 + x 3 + x 4 + x 5 + x 6 + x 7 subject to: x 2 - x 1  12 x 3 - x 2  8 x 4 - x 2  4 x 4 - x 3  0 x 5 - x 4  4 x 6 - x 4  12 x 6 - x 5  4 x 7 - x 6  4 x i, x j  0 The CPM/PERT Network Example Problem Formulation and Data (2 of 2) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

8-52 Minimize Z = $400y y y y y y y 67 subject to: y 12  5y 12 + x 2 - x 1  12 x 7  36 y 23  3y 23 + x 3 - x 2  8 x i, y ij ≥ 0 y 24  1y 24 + x 4 - x 2  4 y 34  0y 34 + x 4 - x 3  0 y 45  3y 45 + x 5 - x 4  4 y 46  3y 46 + x 6 - x 4  12 y 56  3y 56 + x 6 - x 5  4 y 67  1x 67 + x 7 - x 6  4 x i = earliest event time of node I x j = earliest event time of node j y ij = amount of time by which activity i  j is crashed Project Crashing with Linear Programming Example Problem – Model Formulation Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Objective is to minimize the cost of crashing

8-53 Minimize Z = $400y y y y y y y 67 subject to: y 12  5 x 2 - x 1  12-y 12 x 7  36 y 23  3x 3 - x 2  8-y 23 x i, y ij ≥ 0 y 24  1 x 4 - x 2  4-y 24 y 34  0x 4 - x 3  0-y 34 y 45  3x 5 - x 4  4-y 45 y 46  3x 6 - x 4  12-y 46 y 56  3x 6 - x 5  4- y 56 y 67  1x 7 - x 6  4-x 67 x i = earliest event time of node I x j = earliest event time of node j y ij = amount of time by which activity i  j is crashed Project Crashing with Linear Programming Example Problem – Model Formulation Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Objective is to minimize the cost of crashing

8-54 Activity onActivityActivity on Node (AON)MeaningArc (AOA) A comes before B, which comes before C (a) A B C BAC A and B must both be completed before C can start (b) A C C B A B B and C cannot begin until A is completed (c) B A C A B C A Comparison of AON and AOA Network Conventions

8-55 Activity onActivityActivity on Node (AON)MeaningArc (AOA) C and D cannot begin until both A and B are completed (d) A B C D B AC D C cannot begin until both A and B are completed; D cannot begin until B is completed. A dummy activity is introduced in AOA (e) CA BD Dummy activity A B C D A Comparison of AON and AOA Network Conventions

8-56 Activity onActivityActivity on Node (AON)MeaningArc (AOA) B and C cannot begin until A is completed. D cannot begin until both B and C are completed. A dummy activity is again introduced in AOA. (f) A C DB AB C D Dummy activity A Comparison of AON and AOA Network Conventions