Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Reid & Sanders, Operations Management © Wiley 2002 Aggregate Planning 13 C H A P T E R.
Operations Scheduling
Short-Term Scheduling
Operations Management
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Project Management © Wiley 2007.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Chapter 3, Part 1 Product Design
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Supplement D Waiting Line Models Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2005 PowerPoint Presentation by Roger B. Grinde,
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Supplement D Waiting Line Models
Chapter 10 – Facility Layout Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough -
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
1. 2 Chapter 6 REPORTING AND ANALYZING INVENTORY.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
Slide 1 Systems Analysis and Design with UML Version 2.0, Second Edition Alan Dennis, Barbara Wixom, and David Tegarden Chapter 8: Behavioral Modeling.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Reid & Sanders, Operations Management © Wiley 2002 Waiting Line Models A SUPPLEMENT.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
© Wiley 2007 Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
© Wiley Chapter 1 - Introduction to Operations Management Operations Management by R. Dan Reid & Nada R. Sanders 3 rd Edition © Wiley 2007 PowerPoint.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
Slide 11-1 Chapter 11 Terms Information Resource Management Strategies Introduction to Information Systems Judith C. Simon.
I-1. I-2 I ACCOUNTING FOR SOLE PROPRIETORSHIPS Accounting, Fifth Edition.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
H-1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
Chapter 2 - Operations Strategy and Competitiveness
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 10 – Facility Layout
Chapter 1 - Introduction to Operations Management
Chapter 1 - Introduction to Operations Management
Chapter 1 - Introduction to Operations Management
Chapter 1 - Introduction to Operations Management
Chap 11 Learning Objectives
Supplement D Waiting Line Models
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Operations Management
Presentation transcript:

Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH

MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products & Processes Product Design Process Design Managing Quality Statistical Process Control Just-in-Time & Lean Systems Facility Layout Capacity and Location Linear Program- ming Work System Design Managing Inventory Planning & Control Aggregate Planning Resource Planning Scheduling

Chapter Outline Introduction to scheduling Scheduling definitions Low-volume operations Gantt charts Infinite and finite loading Forward and backward scheduling

Chapter Outline (2) Sequencing jobs at 1 work center Common priority rules for 1 work center Using the priority rules Measuring scheduling performance Performance calculations Sequencing jobs through 2 work centers: Johnson's rule

Scheduling Definitions Routing: The operations to be performed, their sequence, the work centers visited, and the time standards Bottleneck: A resource where scheduled work exceeds capacity Due date: When a job is supposed to be finished Slack: The time that a job can be delayed & still finish by its due date Queue: A line of jobs or people waiting for work or service

Low-Volume Operations Low-volume, job shop (batch) operations, are designed for flexibility. Use more general purpose equipment Customized products with higher margins Each product or service may have its own routing (scheduling is much more difficult) Bottlenecks move around depending upon the products being produced at any given time Many service operations have similar issues

Gantt Charts Developed in the early 1900’s by Henry Gantt Load charts (see below Figure 15.1) Illustrates the workload relative to the capacity of a resource Shows job schedule by employee

Gantt Chart (continued) Progress charts: Illustrates the planned schedule compared to actual performance Brackets show when activity is scheduled to be finished. Note that design and pilot run both finished late and feedback has not started yet.

Forward and Backward Scheduling Forward Scheduling – starts processing immediately when a job is received Backward Scheduling – begin scheduling the job’s last activity so that the job is finished on due date

Job Sequencing Considerations at Work Centers Which of several jobs should be scheduled first? Priority rules: Decision rules to allocate the relative priority of jobs at a work center Local priority rules: determines priority based only on jobs at that workstation Global priority rules: also considers the remaining workstations a job must pass through

Commonly Used Priority Rules Local priority rules First come, first served (FCFS) (local) Earliest due date (EDD)(local) Shortest processing time (SPT) first (local) Global priority rules Slack time per remaining Operations (S/RO) - global Slack /(number of remaining operations) – schedule lowest first Critical ratio (CR) - global (Time until due date)/(processing time) Job with lowest CR first

Example Using SPT, EDD

Measuring Scheduling Performance Job flow time: Time a job is completed minus the time the job was first available for processing; avg. flow time measures responsiveness Average # jobs in system: Measures amount of work-in- progress; avg. # measures responsiveness Makespan: The time it takes to finish a batch of jobs; measure of efficiency Job lateness: Whether the job is completed ahead of, on, or behind schedule; Job tardiness: How long after the due date a job was completed, measures due date performance

Scheduling Performance Calculations Calculation mean flow time: MFT= (sum job flow times)/ # of jobs = ( )/4 = 60/4 = 15 days Calculating average number of jobs in the system: Average # Jobs =( sum job flow times)/ # days to complete batch = (60)/20 = 3 jobs Makespan is the length of time to complete a batch Makespan = Completion time for Job D minus start time for Job A = 20 – 0 = 20 days = sum of job processing times Job A finishes on day 10Job B finishes on day 13 Job C finishes on day 17 Job D ends on day 20

Performance Calculations (Cont.) Lateness and Tardiness are both measures related to customer service Average tardiness is a more relevant Customer Service measurement as illustrated below

Comparing SPT and S/RO E done at end of day 2 A end of day 5 D at end of day 9 F at end of day 14 C at end of day 20 B done at end of day 27

Comparing SPT and S/RO (cont.) B done at end of day 7 A at end of day 10 F at end of day 15 E at end of day 17 D at end of day 21 C done at end of day 27

Global Priority Rules Slack time remaining per operation (S/RO) = (slack time)/(number of operations remaining) Schedule job with lowest S/RO first Critical ratio (CR) = (time until due date)/(processing time) Schedule job with lowest CR first

Comparing Priority Rules Shortest processing time (SPT) Minimizes mean flow time Minimizes average job lateness Minimizes average time in the system Faster response to most customers Faster cash flow Jobs with long processing times may be pushed further and further back in the schedule

Comparing Priority Rules (2) Rules that consider due dates Slack time per remaining operations Critical ratio These rules reduce tardiness and maximum lateness Jobs with short processing time and large slack will not be finished as quickly

Sequencing Jobs through Two Work Centers – Johnson’s Rule Johnson’s Rule – a technique for minimizing makespan in a two-stage process Step 1 – List the jobs and the processing time for each activity Step 2 – Find the shortest activity processing time among the jobs If the shortest processing time is for a 1 st activity, schedule that job first If the shortest processing time is for 2 nd activity, schedule that job last Step 3 – Find the shortest activity processing time among the remaining jobs and schedule as in step 2 above. Repeat until all jobs are scheduled.

Johnson’s Rule Example: Vicki’s Office Cleaners does the annual major cleaning of university buildings. The job requires mopping (1 st activity) and waxing (2 nd activity) of each building. Vicki wants to minimize the time it takes her crews to finish cleaning (minimize makespan) the five buildings. She needs to finish in 20 days.

The End Copyright © 2005 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United State Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.