Operational SNS Karen S. White Controls Group Leader 10/11/10.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Best Ever Alarm System Toolkit Kay Kasemir, Xihui Chen, Katia Danilova SNS/ORNL April, 2013.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
Networks Types. Spring 2002Computer Network Applications Data Transfer During the ’70s: Minicomputers became affordable; Need to communicate information;
Paul Chu FRIB Controls Group Leader (Acting)
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
NSLS/BNL PLC Choice Elliott Wolin 6-Jan-2010 Following are a few slides from a much longer presentation BNL chose Allen-Bradley – three month evaluation.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Implementing High Availability
Stanford Linear Accelerator Center Next Linear Collider Test Accelerator EPICS Support S. Allison, R. Chestnut, M. Clausen, K. Luchini.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Network Design Essentials
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
Software QA For Active CECs at SNS. 2Managed by UT-Battelle for the U.S. Department of Energy “As Scott Jerome-Parks lay dying, he clung to this wish:
Thomas Jefferson National Accelerator Facility Page 1 Slow Controls Ken Livingston University of Glasgow.
ICS – Software Engineering Group 1 Status of SNS Carl Lionberger.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio, CSS Overview.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Managed by UT-Battelle for the Department of Energy CSS Update Matthias Clausen, Helge Rickens, Jan Hatje and DESY Delphy Armstrong, Xihui Chen,
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
The recent history and current state of the linac control system Tom Himel Dec 1,
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Module 9 Planning and Implementing Monitoring and Maintenance.
SNS Modulator Fires; Causes, Mitigation, and Long-Term Plans David E. Anderson.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Connecting LabVIEW to EPICS network
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
NML Machine Protection System (MPS) Arden Warner Fermilab August 2 nd, 2007.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 1999/Ph 514: Supported Hardware EPICS Supported Hardware Ned D. Arnold APS.
EPICS and LabVIEW Tony Vento, National Instruments
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
ORNL is managed by UT-Battelle for the US Department of Energy Cyber Security Assessment of the SNS ICS Karen S. White 10/18/15.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
ESS Integrated Control System Software Core Components S.Gysin
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Managed by UT-Battelle for the Department of Energy Quest for the Best Ever Alarm System Tool Kay Kasemir Oct
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
Managed by UT-Battelle for the Department of Energy CSS Based Tools at SNS Dave Purcell EPICS Collaboration Meeting October 13-17, 2008.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Accelerator control at iThemba LABS
SNS Status Report Karen S. White 10/15/08.
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
LIPAc Control System Reliability improvements
LHC BLM system: system overview
Next Linear Collider Test Accelerator and EPICS
System Architecture of MPSVac and MPSID
Target Safety System Interfaces
Presentation transcript:

Operational SNS Karen S. White Controls Group Leader 10/11/10

2Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 The Spallation Neutron Source The world’s most powerful pulsed neutron source

3Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Outline Machine Performance Controls Performance Issues New Stuff

4Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Accelerator Daily Performance

5Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Accelerator Lifetime Performance

6Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Focus on Availability Availability considered more important than increasing the beam power Machine designed for 1.4 MW, but routinely operates at ~1MW to maximize availability and production hours

7Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Accelerator Availability

8Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Controls Availability FY07 – FY10

9Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Controls Downtime Includes MPS and PPS FY09 = hours – Dominated by PLC and PLC/IOC communications problems ~60 hr – PPS ~26 hr – MPS ~17 hr – Radiation Monitors ~14 hr FY10 = 40.8 hours – DeviceNet ~13 hr – PPS ~12 hr – MPS ~6 – Radiation Monitors ~3 hr

10Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 PLC and PLC/IOC Communication Late 2008, increase in PLC module failures and communication problems Two failures impacted CHL resulting in trips and the downtime associated with 4K to 2K transition (16.3 and 19.4 hours) Failure analysis revealed eight different contributing problems Worked with Allen-Bradley engineers to understand failures and plan improvements Analyzed control system response to failures in CHL and implemented improvements

11Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 PLC/IOC Failure Causes and Mitigation CauseMitigation HW failures in PLC processorsUpgraded processors (99) HW failure in PLC Ethernet modulesUpgraded Ethernet modules (50) HW failure in PLC I/O modulesReplaced failed modules Damaged fiber optic cableReplaced cable Memory corruption bug in IOC/PLC communication driver Bug fix installed on all IOCs Failing Automatic Transfer SwitchReplaced ATS PLC Firmware bugsFirmware upgraded; monitoring AB bulletins Single memory bit error in PLC processors Upgraded processors correct single bit errors

12Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Machine Protection System Easy to “shoot the messenger” Most downtime due to noisy input signals Testing verified beam coupling related noise in the Ring Service Building Several improvements were made to reduce the noise and help the MPS better tolerate the noise Timing measurements showed many MPS nodes did not trip the beam within the required 20  s Primary causes for MPS delay – Large internal capacitors installed for noise filtering – Open collector sublink drive circuit slow response (capacitors make this problem a lot worse)

13Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Performance Issues – LLRF Controls LLRF IOCs run automatic feed forward algorithm Increasing beam power -> longer beam pulses -> more data MVME2100 CPU could not processing all data for each 60Hz pulse Upgrading CPUs to MVME5500

14Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Increasing Controls Scope Increasing support for Instruments – Applying accelerator controls technology where it makes sense for instrument construction and support Instrument Personnel Protection Systems Instrument CF*, Vacuum, selected device controls Sharing engineering expertise for problem areas – Instrument work not in original Controls scope Infrastructure not in place Standards not in place – propagating accelerator controls standards *LonWorks talk Wednesday 9:30 am

15Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 Lessons Take data – listen to what it tells you Sometimes what appears to be “a problem” has more than one cause Send clear messages for faults or errors Monitor and evaluate bug reports; apply patches as needed Plan for how the control system should respond to various types of failures Important to strike a balance between new technology and need for high availability

16Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 CSS Tools CSS applications for archiving (BEAUTY) and alarm handling (the BEAST) deployed in ops – Configured using RDB – Data and logging also stored in RDB New DM, BOY under development to interoperate with B&B BOY – Thursday 11am and 3 pm The BEAST Thursday 5 pm

17Managed by UT-Battelle for the U.S. Department of Energy EPICS Collaboration Meeting - October 2010 New Stuff We now have the SNS Café in our building Spring 2011, a nearby Guest House will open for visitors Working on CD-2 for Power Upgrade Project Working on CD-1 for Second Target Station