Cooling System(s) for the Roman Pots of TOTEM experiment 1 V. Vacek AGENDA: 1.Scope of the Research activities (TFP and DAQ group at the Dept. of Applied.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
André Augustinus 16 June 2003 DCS Workshop Safety.
Basic Refrigeration Cycle
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
DISTRIBUTED CRYOGENIC COOLING WITH MINIATURIZED FLUID CIRCUITS Steffen Grohmann, ETT/TT RD39 Collaboration ST Workshop 2003 CERN, April 01-03, 2003.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Adsorption Refrigeration System. INTRODUCTION  Adsorption refrigeration system uses adsorbent beds to adsorb and desorb a refrigerant to obtain cooling.
Industrial Process Control: CONTROL OF HEAT EXCHANGER
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
Cooling Systems Adopted For the Use in the Particle Detectors 1 V. Vacek AGENDA: What we can offer for the the AFP R&D Project: Two cooling systems (Aircooler.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Cooling System Solutions
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
60kW Thermosiphon control system
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
The integration of 420 m detectors into the LHC
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Dynamic Simulations of CO₂ Cooling Systems
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Microfluidic devices for thermal management
Pixel CO2 Cooling Status
Tests on a dummy facet of PIX upgrade using CO2 cooling
Cryogenic System Commissioning Summary Report
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Cooling System(s) for the Roman Pots of TOTEM experiment 1 V. Vacek AGENDA: 1.Scope of the Research activities (TFP and DAQ group at the Dept. of Applied Physics – F. of Mechanical Engineering, CTU in Prague) 2.TOTEM Roman POT cooling system development 3.Application of the efficient heat exchangers 4.Commissioning matters (ATLAS, TOTEM RP or any other system) 5.What we have learned so far LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Scope of the Research activities over the last 10 years Main research program : Cooling system design for electronics application: ATLAS Inner Detector cooling circuit Pixel and SCT structures testing (with CPPM Marseille) Design, assembly and commissioning of the cooling system realized at CERN in SR1 facility Commissioning measurements in the PIT (ATLAS cavern) TOTEM Cooling system for the Roman POTs Overall design, prototype development and verification of the Roman POT thermal mockup Commissioning measurements of the 24 RP, prior to the installation in the LHC tunnel; final system commissioning 2 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Scope of the Research activities over the last 10 years Associated research program: Fluid property research: Thermophysical properties of fluoroinert fluids we studied, both theoretically (simulations – MD and MC methods) and experimentally Databases, individual thermophysical property fitting functions and engineering diagrams were prepared at the CTU for the most of the fluoroinert DAQ systems and various type of the sensors Mobile DAQ systems (based on ELMB and PVSS use) development and their implementation was completed Calibration and verification of the great variety of sensors was done Most of the commissioning measurements for ATLAS and TOTEM cooling systems were performed with our DAQ systems Heat transfer modeling for the heat exchangers design Two phase flow studies (capillary flow modeling) Cold box with controlled atmosphere for the AIRFLY project was developed and used during measurements (Frascati, It; Chicago, USA) 3 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

TOTEM Cooling system for the Roman POTs 4 Roman Pots The inner structure of the Roman Pot consists of 10 silicon detectors, each of them is positioned in an electronic board called the “hybrid” with four embedded readout chips. Operation of the detectors requires temperatures below –10 °C. The dissipated heat from the chips reaches ~ up to 3 W per plane. TOTEM Experiment - its main goal is to measure the total cross section, elastic scattering and diffractive processes at the LHC on both sides of the CMS detector. The diffractive processes are detected by two types of tracking telescopes (T1 and T2). To measure the cross section and the elastic and quasielastic interactions a special instrument had to be introduced: The Roman Pot (RP). 24 Roman Pots located in 8 positions around the beam pipes are capable of detecting particles diverted by extremely low angles LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

TOTEM Cooling system for the Roman POTs 5 We have been asked to develop CS for TOTEM RP in MAY 2006, once the system based upon the heat pipes and pulse tube refrigerator has been ruled out since the changes in specs and strategy Our task was extremely difficult since we have inherited some fixed baselines, time for development was extremely short and nearly no resources were available at the beginning of the work A new system has been developed by the team of the CTU Prague and the final system for the PIT was designed and installed by TS/CV of CERN Close cooperation of the CTU and CERN - TS/CV resulted in successful commissioning of the whole system and it is still going on LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

TOTEM Cooling system for the Roman POTs 6 An evaporative cooling system circulating fluorocarbon C 3 F 8 in 4 main closed loop has been chosen and designed to guarantee a total cooling capacity of 1.2 kW and supply a global mass flow rate of 40 g/s to be uniformly shared between the 24 TOTEM Roman Pots. Basic phases of the development: Evaluation of the principle ( ) Thermal mock-up development and testing (2007) Small commissioning CS design and assembly for individual RP testing at H8 facility at CERN was successfully finished in 2007/08 and is being used. IN PARALLEL: Final CS has been designed by TS/CV ( ) RP TOTEM CS is installed and being commissioned right now LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

TOTEM Cooling system for the Roman POTs 7 Evaluation of the principle ( ) Thermal mock-up development and testing (2007) LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Cooling Circuit in Building 887/H8 - CERN 8 The cooling has been designed, assembled and adjusted by the team from the Department of Applied Physics of the CTU in Prague in 2007 and It consists of two oil-free compressors, a set of chilled water heat exchangers, a pump and a condenser with PID controlled temperature. The circuit is filled with fluorinert refrigerant R218. The circuit is presently prepared to cool down up to three Roman Pots simultaneously. Several tuning and control devices implemented within the circuit enable to vary a large scale of operational parameters. LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Schematics of the Cooling Circuit with single POT 9 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague DATE HEX

Performance of the Cooling Circuit with single POT 10 CTU Prague LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Success with elimination of the insulation = DATE-HEX provided to TOTEM and to us by TS/CV DATE-HEX is compact heat exchanger capable due to the enhanced heat transfer between liquid on one side and vapor on the other side. The device provide possibility to increase vapor temperature over the short distance and still keep pressure drop of vapor at relatively small values It could possibly, after modification and some more testing, replace „problematic“ heating elements- heaters in several applications elsewhere since the device does not require too complex control system and it can be considered as the self-tuning device 11 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Implementation of the HEX into the cooling circuit 12 Instrumentation around the HEX, P, T and flow sensors Arrangement for the nominal refrigerant mass flow up to 5 g/s; water flow measured standard with use of float device, while vapor flow was monitored via SWISS-FLOW meters (frequency principle) calibrated prior to measurements The Date–Hex prototype installed into the circuit with installed pipelines LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Performance of the HEX 13 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Performance of the HEX (other applications?) 14 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

15 What is needed for smooth commissioning ? Reliable and robust DAQ system – it is a „must“ for the commissioning Simple version of the mobile DAQ system for commissioning: 64 channels (but expandable; low cost per channel) Type of the sensors: PT 100, PT1000, NTC Pressure sensors (voltage signals) Humidity sensors (capacitance principle+voltage converter) Enhanced accuracy due to the „internal and „external ELMB calibration and proper sensor handling LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

DAQ system and PVSS project – well tested 16 Type of sensors: NTC (kapton coated, pearl type); pressure sensors Huba and Sensortechnics (both HP and LP); mass flow meter Bronkhorst for the gas phase; 3 out of 6 available ELMB´s were used. All parts of the DAQ were verified and calibrated before the measurements. ATLAS ID Cooling system commissioning LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

17 TOTEM Cooling system commissioning Main problems in the case of TOTEM: very often – some delays (both in hardware and software for the final system deliveries) What had to be prepared in addition: For the H8 use Multichannel DAQ and DCS system For the PIT use Several dummy loads – due to the final RP shifted delivery Mini DAQ and DCS system for the PIT commissioning LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

18 Modifying and tuning Prevessin CS for commissioning purposes CTU Prague Cooling System at H8/in Building 887 prepared was prepared DAQ and control system was verified and handed to TOTEM Patch panel with valves has been added to the system to separate the rack for the Roman POT installed for eventual commissioning Patch panel will allow: 1. an individual manipulation of the RP, 2. its leak checking 3. pumping down the separated part of the cooling lines and when ready, it can be connected to the CS circulation just through 2 valves LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

19 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague Prevessin CS – commissioning results of the RP No. 2

20 Commissioning set up for single POT at H8: Three POTs already commissioned Fluid INLET (liquid) and OUTLET (vapor) available Patch panel for an easy handling Environmental protection of the upper part solved Once upper part is connected (two tubes with refrigerant, electrical services and DAQ wires), RP is leak checked and pumped down, we can proceed with fast runs at H8 installation Two major valves LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

21 Production of the dummy loads for the PIT and their verification at Prevessin LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

22 Production of the dummy loads for the PIT and their verification at Prevessin 1.Pressure drop verified 2.Leak tested 3.Electrical connection tested 4.Prepared for insulation 5.Installed within the final cooling plant Verified during the refrigerant circulation in the closed loops LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague

Commissioning in the PIT: Sensors are monitored independently by the PLC and by the ELMB based mini DAQ system Roman Pot station in the LHC tunnel with one RP and two Dummy loads Sumary of the last results from the PIT 23

SUMMARY Overall scope of the research activities was outlined – covering last few years Activity within the ATLAS ID cooling system development were mentioned TOTEM Roman POT cooling system was described and relevant experience from CS design, running and commissioning were presented Heat exchanger use for the efficient vapor warm up was described and experimental results were introduced General comments related to CS of the RP detector applications were introduced 24 LHC cooling forum, CERN, October 30, 2008 V. Vacek, CTU Prague