Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)

Slides:



Advertisements
Similar presentations
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Advertisements

Bill Christie For the STAR Collaboration MARCH 24,
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Beta* leverage during RHIC AuAu Run14 G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White Work supported, in parts, by the European Commission.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments) Other Call in bridge line is

Run 14 plan based on 22 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2013 – FY 2017), 4 Jun 2013 (5/20/15 update) 3 Feb, Begin cool-down to 4.5K 4 Feb, Cool-down to 6K in Blue 7 Feb, Blue and Yellow at 4.5 deg K 10-Feb, Beam in Blue and Yellow at injection 15-Feb, Begin √s = 14.6 GeV/n AuAu physics Mar (Tuesday, 0800), End √s = 14.6 GeV/n AuAu physics run begin setup for √s = 200 GeV/n AuAu 15-Mar (~14:00, store 18046), Begin √s = 200 GeV/n AuAu physics run PHENIX 1 st physics store = (15 March) STAR 1 st physics store = (17 March) today, 3 June… Jun, end 13.3 week √s = 200 GeV/n AuAu run(assumes continued good stores) 16-June begin setup for √s = 200 GeV/n 3 HeAu run 7-July, end 3 week √s = 200 GeV/n 3 HeAu run (end sooner if 3 HeAu goals met) 4-7-July, begin cryo warm-up July, warm-up complete, cryo weeks of operation See for the Run Coordinator’s detailed planhttp:// 2

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013 PHENIX goal STAR goal Max projection Min projection We should have updated goals! thru fill Tuesday 3 June 3

4 Through store Tuesday3 June 14

thru fill Tuesday 3 June 5

6

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013 Max projection Through 30 May stores 7

Past 6.5 weeks Not corrected PHENIX ZDC Bunched beam intensity 8

Recent Not corrected PHENIX ZDC Bunched beam intensity 9

Old ~best store to date (4/18/14) L peak Max Goal 10

New ~best store to date (5/29/14) L peak Max Goal 11

From this morning (6/3/14) 12

13

14

15

16

17

STAR – Slides from Time Meeting 18

19 16 June

20 My line

Archive 21

FY 2014 power rebate $ in BNL bank = -$0.865M (in the hole!), through April April 2014 ($68) 22

Thru April

STAR Proposal for optimum running 24

Proposal for optimizing RHIC Running between now and switch to He3- Au RHIC Coordination mtg. May 27, 2014 Bill Christie For the STAR Collaboration 25

Proposal: 1.) Drop the collision rate in STAR down to 50 kHz 2.5 hours into the store, as opposed the current mode where it’s dropped after 3 hours. 2.) Extend the store length from 10 hours to 11 hours. 3.) Minimize Machine Development time between now and the switchover to He3-Au running. 4.) Consider dropping one APEX session between now and the switchover to He3-Au running. 5.) Investigate implementing the dynamic Beta squeeze (aka THOR) at STAR late in the store when the 50 kHz rate can’t be maintained. 6.) Consider gains in the luminosity lifetime that could result from either mis steering PHENIX or increasing the PHENIX beta*. 7.) Depending on how far we get in reaching STAR’s goal’s, reconsider the He3-Au switch over date. 26

27

From Wolfram, 5/6/2014 RHIC-II 28

Still ~best ~10 (12) hr store 29

Best Store to date (4/18/14) L peak Max Goal Another good store – a lot more about as good! (4/22/14) 30

Best Store to date (4/18/14) 31

PHENIX 200 GeV for 12 weeks, L = 1.5 nb −1 sampled luminosity within |z| < 10 cm]  ~30% within |z| < 10 cm]  ~90% DAQ efficiency  ~50% bandwidth, DAQ saturation factor (?)  11 nb -1 delivered STAR 200 GeV for 14 weeks, L= 10 nb −1 recorded, 10 9 min bias triggers within |z| < 5 cm]  (2x10 9 triggers required)  ~ 60% (should be better) sampling efficiency  16.7 nb -1 delivered 15 GeV for 3 weeks, 150M min bias triggers Goals for Run 14 (based on Beam Use Requests) (11 Feb, DRAFT, to be updated by experiments) 32

4/8/2014 New Electric Rates for this year 33

Goal, 1.4 x 10 9 /bunch ~L store avg Goal, 35 x /cm -2 s -1 (not singles corrected) 34

30 Mar, Store 18145, 9 hr 59 min, nb -1 (40 x cm -2 s -1 ) to PHENIX (assumes 9.5 b xscetion) (Not singles corrected) Store ~best store 31 Mar, Store 18151, 9 hr 49 min, nb -1 (42 x cm -2 s -1 ) to PHENIX 35

From Ingrassia, Through final fill 18010, 11 Mar 2015 max/min projections from Fischer et.al. “RHIC Collider Projections (FY2014-FY2018)”, 4 June

√s = 14.6 GeV/n AuAu physics, 15 Feb-11 Mar 37

√s = 14.6 GeV/n AuAu physics, last 24 hours 38

39

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June

Fischer et. Al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June

4 Feb 2014 Blue at 4.5 deg 42

7 Feb 2014, Blue and Yellow at 4.5 deg K 43

Who’s Who for

From Fischer et. al., RHIC Collider Projections (FY 2014 – FY 2018), 4 June