1 Draft1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Biosolids Management Program Update May 22, 2008.

Slides:



Advertisements
Similar presentations
Source Separated Organic Materials Anaerobic Digestion Feasibility Study Prepared for Ramsey/Washington Counties Resource Recovery Project Board And the.
Advertisements

KING COUNTY & BROWN GREASE Local sewer agencies have a need to address restaurant grease trap waste. In response, there is the potential of a renewable.
The Region of Halton Biosolids Management into the Future Regional Municipality of Halton Ontario, Canada.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Integration of CHP Into Waste Water Treatment Processes London 5 th November 2014 Peter Bense.
Dallas Water Utilities Southside Wastewater Treatment Plant Cogeneration and Co-Digestion Projects May 9, 2011 Turning Waste Into Energy.
CONVERTING DIGESTER GAS TO STEAM AND ELECTRICITY AT THE BLUE PLAINS AWTF MICHAEL B SHAFER, PE BLACK & VEATCH November 12, 2013 PRESENTED AT THE NC AWWA/WEA.
January 2013 – May 2014 Energy Conservation Program Board Update San Bernardino Community College District Insert Organization Logo Here.
So Cal Alliance of POTWs Energy Management/Biosolids Committee
Biosolids Recycling ACP Compost Solutions Workshop UC Riverside Extension February 28, 2007.
Paul A. Weghorst Executive Director of Water Policy
NC AWWA-WEA 93rd Annual Conference November 12, 2013 Tim Woody Resource Recovery Division Director, City of Raleigh Jonathan Treadway P.E, BCEE, CDM Smith.
Climate Action Plan and Alternative Energy Overview UNC Energy Task Force March 17, 2010.
Alternative Energy Overview and Cofiring Biomass at Cogen Cogen Neighbor Meeting April 28, 2010.
Biofuels for Africa. By George Mwaniki. Introduction Africa is the second largest continent which accounts for 22% of the earths land mass. It is home.
SUSTAINABLE SEWAGE Melissa K. Scanlan Associate Dean & Associate Professor Vermont Law School.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
TRP Chapter Chapter 4.2 Waste minimisation.
1 Atmospheric Vortex Engine Development and Economic.
Server Virtualization: Navy Network Operations Centers
Organics Policy Roadmap  Sub-directive 6.1: 50% reduction of organics in waste stream by 2020  Need additional capacity to process 15 million tons per.
Community Manure Management Feasibility Study Dane County John Reindl, Recycling Manager February 18, 2008.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
Biosolids Management Program Update Briefing for Environmental Quality and Operations Committee July 19, 2007 Briefing for Environmental Quality and Operations.
July 2013 TECHNICAL DIRECTOR ENVIRONMENTAL APPLICATIONS OF ACCELERATORS INDUSTRY CHALLENGES – SLUDGE TREATMENT MARTIN JOLLY.
A Sustainable Biosolids Process & Fertilizer Product Dana G Taylor and Jeffrey C Burnham, Ph.D. Long-term effective biosolids solution High-value slow-release.
Biosolids Management Program Updates: CFT and BMP Blue Plains Regional Committee April 26, 2007.
Status Report: Blue Plains Biosolids Management Plan Report to the Blue Plains Regional Committee by Karl Berger Dec. 20, 2010.
Massachusetts Water Resources Authority Presentation to MWRA Advisory Board MWRA Residuals Processing & Agreement for Operation and Maintenance of the.
Weathering the Change Action Plan 2 ACT Climate Change Council 8 November 2011.
Marty Matlock, PhD, PE, BCEE Executive Director, Office for Sustainability Professor,UA Division of Agriculture Biological and Agricultural Engineering.
Feasibility Study as a Basis for Investment Financing Arto Nuorkivi ESCOBALT Project Manager, Finland Kaunas, Dec. 14, 2005.
Biosolids Management Program Update Briefing for Blue Plains Regional Committee August 23, 2007 Briefing for Blue Plains Regional Committee August 23,
Bioenergy Update Presented by: Glenn Hummel, PE. Agenda / Objectives Background & Mission Major Recent Achievements Current Focus & Activities Local Update.
Municipal Solid Waste Power Plant Project DL ENT Co., Ltd.
Committed to environmental quality Emerging Technologies for MSW and Sludge Atlantic County, NJ.
November 17 th, 2015 Thermal Hydrolysis Pretreatment (THP) Considerations For a 15 Dry Ton per Day WRF Thomas Nangle, PE CDM Smith 2015 Annual Conference.
Anaerobic Digesters Key Considerations in Feasibility.
Biosolids Planning from an End Use Perspective
Alternatives Drying Class A Processing Dewatering Centrifuge, BFP Thickened Liquid Sludge Class A Land Application Incineration Pelletization Alkaline.
November 17, 2015 NC AWWA-WEA Annual conference
PM2.5 Working Group Meeting #2 South Coast Air Quality Management District July 11, 2006.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Steven A. Gabriel, Christopher Peot and Mark Ramirez
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Presentation to : WERF LIFT Presented by:. Lystek - The Company Low Temperature Chemical Hydrolysis technology installed after dewatering, easy to install.
Biodiesel Production from Grease Waste February 3, 2011 IBR & Infrastructure Platform Tony Pack Eastern Municipal Water District.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Why Class A does not always make cents: Cost model to drive biosolids planning decisions Thor A. Young | Service Line Leader Sebastian E. Smoot | Engineer.
BLAKELY  Welcome.
NC AWWA-WEA 97th Annual Conference
CIFA 2016 Workshop Performance Based Infrastructure
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Solar Initiative – Next Phase Opportunity
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
CE 445 Wastewater Reclamation and Reuse
Energy performance and Carbon emissions Assessment and Monitoring tool
Biosolids Planning – Core Team Meeting
Carbon Footprint.
STATION 1 Brown and Caldwell.
PROJECT OVERVIEW Liquids Stream Solids Stream
Biosolids Planning – Core Team Meeting
City of Janesville Wastewater Facility Plan Amendment Public Hearing
The Project Overview and Status Report
Presentation transcript:

1 Draft1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Biosolids Management Program Update May 22, 2008

2 Draft2 Agenda  BMP Status Update  Process Alternatives  Comparison of Alternatives  Risk Management Strategy  Energy and GHG Emission Considerations  Implementation Schedule

3 Draft3 BMP Status Update

4 Draft4 Introduction  WASA has been updating the BMP to: Determine available technologies for Blue Plains Define projects that can be implemented within the budget, but also identify projects that provide significant O&M cost advantages Define projects that significantly reduce continued use of lime stabilization and provide for beneficial use of final product (i.e., digester gas and biosolids)

5 Draft5 Introduction  WASA has determined that: Digestion remains the cornerstone of the BMP WASA should continue moving toward processes that result in Class A biosolids for program sustainability Thermal Hydrolysis by Cambi is proven to be an effective biosolids treatment technology Use of Cambi process can reduce needed digester volume by 50% Diversity of final product is an important risk management strategy

6 Draft6 BMP Status  WASA conducted three expert panel workshops resulting in a recommended combined option including TH, digestion, and drying Waste activated (hard to digest sludge) to Cambi, and Primary (easy to digest sludge) to digestion/drying Reduces risk from processing all sludge using only one technology Generates diverse final biosolids products Allows WASA to gain experience with both technologies and decide which technology to proceed with in the future

7 Draft7 BMP Status (Cont’d)  Identified process alternatives that would maximize use of existing facilities  Identified scaled-back facilities that fit within available budget  Performed value engineering with independent team on alternatives to identify construction cost savings  Performed independent cost analyses to validate cost assumptions and factors used to prepare construction and O&M cost estimates

8 Draft8 BMP Status (Cont’d)  Validated feasibility and constructability concepts using independent construction and geotechnical experts  Identified risks related to construction and means to mitigate them (construction cost market continues to escalate at a rapid rate)  Estimated energy production and carbon offsets for each alternative

9 Draft9 BMP Status (Cont’d)  Reviewed latest population projection for Blue Plains service area and impact on solids loading and biosolids management costs  DCWASA personnel visited TH (Cambi) installations in Ireland and the United Kingdom April 29 – May 2, 2008 to: Inspect operating and partially constructed TH plants Discuss procurement, construction and operating issues with owners Familiarize WASA staff with process operability and maintainability requirements Found Cambi to be an acceptable technology for Blue Plains

10 Draft10 Process Technologies Cambi Thermal Hydrolysis (TH)  TH precedes anaerobic digestion  TH uses high temp and pressure to break down sludge for faster digestion and destroys all pathogens  TH produces Class A biosolids product  TH reduces the required digester volume by half  TH can provide diversity of biosolids product with the addition of drying Thickening Dewatering Cambi Meso Digestion Dewatering Beneficial Use (Class A)

11 Draft11 Digestion/Drying Provides heat dryers for digested sludge to yield Class A pellets Reduces biosolids volume by 90% Class A pellets can be land applied or used for fertilizer or fuel Process Technologies Thickening Meso Digestion Dewatering Drying Beneficial Use (Class A)

12 Draft12 Thickening Dewatering Cambi Meso Digestion Dewatering Beneficial Use (Class A) Thickening Meso Digestion Dewatering Drying Beneficial Use (Class A) Primary Solids and WAS Combined (Cambi/digestion/drying) Provides heat dryers for non-Cambi digested sludge to yield Class A pellets Provides two different types of Class A products Process Technologies

13 Draft13 Available Project Construction Budget  Current Available CIP Funds = $ 308 MM  Pre-construction Cost Allowances at 26% of Construction Cost = $ 64 MM  Available Construction Budget = $ 244 MM

14 Draft14 Process Alternatives – Major Equipment Alt. Cambi Trains DigestersDryers Additional Centrifuges Location Digester site SPB Digester site SPB 71523Digester site SPB Digester site SPB SPB SPB = Sludge Processing Building

15 Draft15 Biosolids Loadings and Construction Cost for Alternatives Alt. No. Loading (dtpd) Construction Cost ($ Million) To TreatmentTo Lime Stabilization Annual AverageMax 3-D/ Annual Average / / / / / /

16 Draft16 Biosolids Loadings and Construction Cost for Alternatives Alt. No. Loading (dtpd) Construction Cost ($ Million) To TreatmentTo Lime Stabilization Annual AverageMax 3-D/ Annual Average / / / / / /

17 Draft17 Construction and O&M Costs of Alternatives Alt. No. DescriptionConstruction ($M) 1 st Yr. O&M ($M) 16 Cambi (Digester site) + 5 MAD (Full) Cambi (Digester Site) + 4 MAD + LS Cambi (SPB) + 2 MAD + LS214 * Cambi (Digester Site) + 2 MAD + LS Cambi (Digester Site) + 7 MAD +3 Dryers (Full) Cambi (SPB) +3 MAD + 1 Dryer + LS300 * Cambi (Digester Site) + 5 MAD + 2 Dryers + LS Cambi (Digester Site) + 3 MAD + 1 Dryer + LS MAD = Mesophylic Anaerobic Digesters LS = Lime Stabilization

18 Draft18 Construction and O&M Costs of Alternatives Alt. No. DescriptionConstruction ($M) 1 st Yr. O&M ($M) 91 Cambi (SPB) + 3 MAD + 1 Dryers + LS237 * Acid Hydrolysis + 8 MAD + 5 Dryers (Full) MAD + 3 Dryers (SPB) + LS232 * Lime Stabilization (LS) (Full) * The estimated cost does not account for additional costs that may be incurred when major equipment is installed in an existing building designed for other uses.

19 Draft19 Preliminary Comparison of Alternatives  Alternatives sized to handle all peaks and eliminate lime stabilization and cost >$370 Million (construction cost)  Cambi requests outdoor location for their process. Fitting Cambi into existing building could require modifications to their standard design which increases risk  Four digestion alternatives are within capital budget

20 Draft20 Preliminary Comparison of Alternatives (Cont’d)  Four digestion alternatives are above capital budget, but reduced O&M cost warrants further consideration  For each of the above, the best Cambi and combined alternatives were selected resulting in four alternatives to be compared with the base case full lime stabilization alternative

21 Draft21 Recommended Alternatives for Consideration Alt. 2:Cambi – 4 trains/4 digesters (w/LS for peaks and Cambi down time) Alt. 4: Cambi – 2 trains/2 digesters (w/LS) Alt. 7: Combined – 1 Cambi /5 digesters/ 2 dryers (w/LS for peaks and Cambi down time) Alt. 9:Combined – 1 Cambi/3 digesters/ 1 dryer (w/LS) Alt 12:Lime stabilization only (base case)

22 Draft22 Risk Management Strategy  Cambi Alternatives with Lime Stabilization (Alt. 2 & 4) Phased implementation allows confirmation of technology and later expansion based on plant operating data and a better definition of peak loads Use of conventional digester construction increases contractor competition Lime stabilization manages peak solids loadings and provides backup to mitigate potential risks Modular Cambi construction reduces initial installation costs

23 Draft23 Risk Management Strategy  Combined Alternatives with Lime Stabilization (Alt. 7 & 9) Phased implementation allows confirmation of technology and later expansion of either Cambi or drying Diversity of Class A biosolids products (Cambi cake and heat-dried biosolids) increases marketability Use of conventional digester construction increases contractor competition

24 Draft24 Risk Management Strategy (Cont’d) Lime stabilization manages peak solids loadings and provides backup to mitigate potential risks Combined alternatives mitigate commercial risks and allow leveraging competition

25 Draft25  Digester gas is used to generate electricity from a co-gen facility  Waste heat from power generation is used to provide energy for Cambi, drying and to heat digesters  CO2 emissions were generated from: Net heat consumed by the process Net electricity consumed by the process Transportation fuel for land application of cake solids Lime usage  Reduction of CO2 emissions are a result of: Electricity and heat generated from the biogas Land application of cake Combustion of pellets in a cement kiln plant  CO2 benefits related to land application of stabilized biosolids are based on carbon sequestration and offsetting the use of chemical fertilizer Comparative Green House Gas (GHG) Emissions Based on CO2

26 Draft26 CO2 Emission in thousand tons/yr for the selected alternatives  Red numbers in parenthesis represent negative CO2 emission or CO2 credit  The higher the numbers in ( ) the better the process in terms of GHG emission, considered as CO2 benefit. Processes only Processes and Product Use

27 Draft27 Electricity Production for Selected Alternatives

28 Draft28 Basis for Selection of Recommended Alternative  Costs / Available budget  Diversity of Product  Complexity of Construction  Complexity of O&M  Carbon Offsets  Energy Production  Risks

29 Draft29 Project Implementation Schedule ActivityDurationCompletion Concept Development Report4 monthsSep 30, 2008 Design procurement6 monthsJan 2, 2009 Design12 monthsJan 8, 2010 Bidding6 monthsJul 9, 2010 Construction29 monthsDec 31, 2012 Startup6 monthsMar 29, 2013 Note: Some activities run concurrently

30 Draft30 Population Projection and Impacts Current budget based on 2000 population projections and 330 dt/d solids production New projections based on 2008 projections and 370 dt/d solids production

31 Draft31 Next Steps  Provide construction cost, schedule, May 27, 2008 and annual O&M costs to CFO  Technical Workshop June 4, 2008  Len Benson meeting with CFO and GM~ June 9, 2008  EQ & Operations Committee meetingJune 19, 2008  Full Board meeting (assumed)July 3, 2008  Draft and Final Report (Conceptual Development level)September 2008

32 Draft32 THE END

33 Draft33 Schematics and Site Layouts of Alternatives

34 Draft34 Cambi and Digestion Alternatives Lime Stabilization (Existing)

35 Draft35 Cambi and Digestion Alternatives

36 Draft36 Cambi/Digestion Alternative #2

37 Draft37 Cambi/Digestion Alternative #4

38 Draft38 Cambi/ Digestion / Drying Lime Stabilization (Existing)

39 Draft39 Insert Layout for Alternative 7 Cambi/Digestion/Drying Alternative #7

40 Draft40 Cambi/Digestion/Drying Alternative #9 Insert Layout for Alternative 8

41 Draft41 Lime Stabilization

42 Draft42 Lime Stabilization Alternative 12 Insert Layout for Alternative 12