Initiative in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Thermal Shock Measurements for Solid High-Power Targets at High Temperatures J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword 1, C.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK November-2008.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Thermal Shock Measurements and Modelling for Solid High-Power Targets at High Temperatures J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword.
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
1 Thermal Shock Measurements and Modelling for Solid High-Power Targets at High Temperatures J. R. J. Bennett 1, G. Skoro 2, S. Brooks 1, R. Brownsword,
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Modelling shock in solid targets Goran Skoro (UKNF Collaboration, University of Sheffield) NuFact 06 UC Irvine, August 24-30, 2006.
Mercury Jet Studies Tristan Davenne Rutherford Appleton Laboratory Joint UKNF, INO, UKIERI meeting 2008 University of Warwick, Physics Department 3-4 April.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
R&D Studies on Solid Targets in the UK J. R. J. Bennett Rutherford Appleton Laboratory
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
Progress on Solid Target Studies J. R. J. Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX EUROnu and NF-IDS Target Meeting, CERN,
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
EUROnu and NF-IDS Target Meeting, CERN, March 2008 Progress on Solid Target Studies J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
MuTAC Review - March Solid Target Studies N. Simos Brookhaven National Laboratory.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Sensitivity Key parameters: ― Degree of matter-antimatter symmetry violation →  ― Degree of mixing e- and  -neutrinos →  13 Neutrino Factory has highest.
Large SOLID TARGETS for a Neutrino Factory J. R. J. Bennett Rutherford Appleton Laboratory
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Progress on Solid Target Studies J. R. J. Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX 2 nd Oxford-Princeton High-Power Target.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
Reducing shock in the Neutrino Factory target Goran Skoro (University of Sheffield) UKNF Meeting 11 January 2006.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
BENE/CARE Frascati November 2006 CJ Densham CCLRC Rutherford Appleton Laboratory Solid target studies in UK for T2K and for a neutrino factory JRJ.
FFAG Acceleration David Neuffer Fermilab FFAG Workshop ‘03.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Shock Tests on Tantalum and Tungsten J. R. J. Bennett, S. Brooks, R. Brownsword, C. Densham, R. Edgecock, S. Gray, A. McFarland, G. Skoro and D. Wilkins.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
ENG/BENE, ENG Plenary, 16 March 2005 The New UK Programme for Shock Studies J R J Bennett RAL.
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
ISIS operational update
UK Neutrino Factory Conceptual Design
Targets Neutrino Factory J. R. J. Bennett
Challenges and Progress on the SB Horn Design
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Beam Dump outline work plan (UK perspective)
1- Short pulse neutron source
Parameters of the NF Target
Meson Production Efficiencies
W. T. Weng Brookhaven National Laboratory
Presentation transcript:

Initiative in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK

Targets ISS Baseline Design Summary R&D Required

ParameterValueReason Beam Power4 MWBy definition Proton energy~10 GeVBased on calculated muon yield Beam repetition rate ~50 HzBased on Jet target (≤~50 Hz)/driver design Micro-pulse width~2 nsBased on muon yield (front end/phase rotation) Number of micro- pulses per macro- pulse ~4 (16  s spacing) Based on proton driver/front end design/size of storage ring Macro-pulse length~50  sBased on Jet target Target – Mercury Jet Based on advanced R&D/best choice Free Mercury Jet Target

The Proton Pulse macro-pulse micro-pulse Proton beam “macro-pulses” and “micro-pulses”.

Parameters of the RAL NF-Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power dissipation1 MW energy dissipated/pulse20 kJ (50 Hz) energy density0.3 kJ/cm 3 (50 Hz) 2 cm 20 cm beam

ParameterValueReason Beam Power4 MWBy definition Proton energy~10 GeVBased on calculated muon yield Beam repetition rate~ 50 Hzdriver design/reduced thermal shock Micro-pulse width~1 nsBased on muon yield (front end/phase rotation) Number of micro- pulses per macro-pulse 3 (~60  s spacing) Based on proton driver/front end design size of storage ring Macro-pulse length120  s(beryllium window dissipation)/reduced thermal shock Target – Solid Tungsten Not chosen Shock studies incomplete Solid target

Some Comments 1. Pion production measurements needed urgently – HARP!!! Effects choice of energy and target material. 2. Front End Inefficient – look for better solution – ß-beams are elegant!!

My R&D Suggetions 1.Free Mercury Jet - After MERIT – may indicate further R&D needed. ???? 2.Improve/widen/increase experience with mercury jet and handling/safety. Consider low temperature eutectics as alternatives to Hg. 3.Contained flowing liquid metal targets?

4.Shock studies in solids – tantalum, tungsten and carbon –for targets (and at high temperatures) and windows. 5.In-beam tests required. 6.Investigate low thermal expansion metals? 7.Produce a viable rotating/moving solid target design. 8.Radiation Damage in solids –high temperatures - annealing. 9.Produce a viable beam dump design for solid and free jet targets. 10.Design a target station and beam dump for Jet target and Solid target. Including remote handling, maintenance and replacement. 11. Safety aspects.

The RAL Thermal Shock Programme 1. Simulate shock by passing a pulsed current through a wire. 2. Measure the radial (and longitudinal) motion of the wire to evaluate the constitutive equations (with 3.). 3. Use a commercial package, LS-DYNA to model the behaviour. 4. Life time/fatigue test. 5.In-beam tests. 6. Investigate the possibility of widely spaced micro- bunches of proton beam to reduce the shock impact.