Chris Adolphsen Main Linac Integration. CAVITY VESSEL T4CM QUAD/Correctors T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.

Slides:



Advertisements
Similar presentations
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
Advertisements

Development of ML-BPM for STF cryomodule H. Hayano, KEK SunYoung Ryu, PNU.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
Linac Quad Field and Position Stability Chris Adolphsen SLAC.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
1 ILC Main Linac Alignment Simulations using Conventional Techniques and Development of Alignment Model John Dale LCWS08 & ILC08.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
Alignment and Beam Stability
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Main Linac Integration Work Packages Chris Adolphsen Dec 11, 2007 High Priority Items in Red.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Study of Absorber Effectiveness in the ILC Main Linacs K. Bane, C. Nantista and C. Adolphsen SLAC, March 26, 2010 Goal: Compute the HOM monopole losses.
Status of the ILC Main Linac BPM R&D Thibaut Lefevre CERN Claire Simon CEA Sacley Sebastien Vilalte LAPP Manfred Wendt Fermilab 11/19/20081ILC08 Main Linac.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
Beam Test status and Plans of the ILC Main LINAC BPM
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
GDE Main Linac and RTML Beam Dynamics Conveners: Nikolay Solyak, Cris Adolphsen, Kyioshi Kubo April 20, Room 303, 14:30 – 18:00.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
SC Quadrupole Discussion Chris Adolphsen. Comments from Fernando Toral on SC Development for XFEL and ILC.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Main Linac Issues for RDR 1/20/2006 Area group H. Hayano From Linac Area discussion posted on the web:
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
ILC Main Linac Beam Dynamics Review K. Kubo.
From Beam Dynamics K. Kubo
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Re-entrant BPM R&D for ILC Main Linac
XFEL beamline loads and HOM coupler for CW
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
ILC Z-pole Calibration Runs Main Linac performance
SC Quadrupole Magnets in ILC Cryomodules
Chris Adolphsen Sergei Nagaitsev
DFS Simulations on ILC bunch compressor
Compact and Low Consumption Magnet Design The DESY Experience
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
ILC Main Linac Alignment Simulations
Beamline Absorber Study Using T3P
Breakout Session SC3 – Undulator
Presentation transcript:

Chris Adolphsen Main Linac Integration

CAVITY VESSEL T4CM QUAD/Correctors T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package

Quad Field and Position Requirements Installation Requirements –Local alignment to the cryomodule axis – covered in N. Ohuchi specs –Long range (10 m to 10 km) – Kubo et al working on specs Fast Motion (Vibration) –Require uncorrelated vertical motion > ~ 1 Hz to be < 100 nm –Many measurements being done – data show spec can be met Slow Motion (Drift) –For dispersion control, want quad to stay stable relative to it neighbors at few micron level, day to day –Although slow ground motion is large, it is correlated on over long distance range which makes its net effect small. –Also sensitive to cryo shielding temperature changes and tunnel temperature changes. Change of Field Center with Change in Field Strength –For quad shunting technique to be effective in finding the alignment between the quad and the attached bpm, quad center must not move by more than a few microns with a 20% change in field strength

CIEMAT SC Quad Test at SLAC Cos(2  ), 0.6 m Long, 0.36 T/A Quad + X/Y Correctors

Center Motion with 20% Field Change Motion Shown in Plots with +/- 5  m Horizontal by +/- 5  m Vertical Ranges 5 A10 A 20 A 50 A 75A100 A

FNAL SC Quadrupole Design A “superferric” design was chosen where saturated iron poles form a substancial part of the magnetic field in the quadrupole aperture. V. Kashikhin

2 Microns 50 Microns Center Motion with Field Change

In first prototype, see significant, asymmetric magnetization plus dipole influence on quad XFEL Prototype Superferric 6 T SC Quad Fernando Toral

RF BPMs Require –1 micron level single bunch resolution –Ability to resolve bunch-by-bunch positions with 300 ns (150 ns) bunch spacing –Cleanable design so does not contaminate cavities –Readout system that is stable to 1 um on a time scale of a day for a fixed beam offset up to 1 mm. Linac Prototypes –SLAC half aperture S-Band version for ILC –FNAL L-Band version for NML/ILC –SACLAY L-Band version for XFEL/ILC –Pusan National University / KEK TM12 version

SLAC Half Aperture S-Band BPM SLAC approach: –S-Band design with reduced aperture (35 mm) –Waveguide is open towards the beam pipe for better cleaning –Successful beam measurements at SLAC-ESA, ~0.5 µm resolution –No cryogenic tests or installation –Reference signal from a dedicated cavity or source

FNAL Full Aperture L-Band Design Frequency, GHz, dipole monopole Loaded Q ( both monopole and dipole ) ~ 600 Beam pipe radius, mm39 Cell radius, mm113 Cell gap, mm15 Waveguide, mm122x110x25 Coupling slot, mm51x4x3 Window – Ceramic brick of alumina 96% ε r = 9.4 Size: 51x4x3 mm N type receptacles, 50 Ohm

1.5 GHz Cavity BPM at FNAL Slot Windows

Reentrant Cavity BPM for XFEL Twelve holes of 5 mm diameter drilled at the end of the re-entrant part for a more effective cleaning (Tests performed at DESY). Cu-Be RF contacts welded in the inner cylinder of the cavity to ensure electrical conduction. Cryogenics tests at 4 K on feed-throughs is OK Copper coating (depth: 12 µm) to reduce losses. Heat treatment at 400°C to test: OK Eigen modes F (MHz)QlQl (R/Q) l (Ω) at 5 mm (R/Q) l (Ω) at 10 mm Measured Calculated Monopole mode Dipole mode Achieved ~ 5  m Resolution

TM12, Full Aperture, 2.0 GHz BPM Sun Young Ryu, Jung Keun Ahn (Pusan National University) and Hitoshi Hayano (KEK-ATF) Achieved ~ 0.5  m Resolution

One bunch Q=3.2nc, bunch length=10mm Loss factor (V/pc)=9.96V/pc Lossy dielectric conductivity σ eff =0.6(s/m) Dielectric constant ε r =15, within 80ns Total Energy Generated by Beam (J) e-5 Energy propagated into beam pipe (J) 4.44e-6 Energy dissipated in the absorber (J) 7.0e-7 Energy loss on the Non SC beampipe wall (J) around absorber 9.3e-10 Energy loss in intersection between two cavities (J) 1.3e-9 (cold copper conductivity=3500e6Simm/m) HOM Losses Along Beam Line at 70 K and 2 K

RF Station Power Budget (Straw-man Proposal) B. Chase Power to Spare ! MW

Studying FLASH Cavity Gradient Stability Blue: Nominal + 100Hz Initial Detuning; Red: Nominal Initial Detuning; Green: Nominal – 100Hz Initial Detuning.

Linac Alignment Network Rings of 7 markers placed every 25m –Would like every 10m but current adjustment software not capable Network is Measured by a Laser Tracker –Laser tracker is placed between marker rings –Measures 2 rings up and down the tunnel –Statistical measurement Errors Distance : 0.1mm+0.5ppm Azimuth : 4.7 μrad Zenith : 4.7 μrad Errors estimated by experienced surveyors and laser tracker operators from DESY –Ignored all systematic errors from refraction in tunnel air (top hotter than bottom) 25m View Along Tunnel Birds eye view of tunnel Laser Tracker Wall Marker accelerator John Dale

Alignment Simulations Use PANDA to calculate error propagation through network 20 Reference Networks were simulated in JAVA –Length 12.5km –Including GPS every 2.5km assuming 10 mm rms errors Problem with vertical adjustment under investigation at DESY and by authors of PANDA 27.5mm Difference From True Horizontal Difference Distance Along Tunnel Difference From True Vertical Difference Distance Along Tunnel 35mm John Dale

Mean : 71nm 90% : 180nm ≤ 30nm : 20% (Spec) Histogram of Final Vertical Corrected Emittance nm Vertical Corrected Emittance Emittance Growth Simulations DMS was run with 100 seeds on each of the 20 alignments. Again studying vertical emittance only so mis-aligned only the vertical plane. Because of problems with vertical alignment the horizontal errors were used as vertical.

MLI Summary Quad Package –Have SC quad that meets ILC spec and BPMs that look promising –Discussing issues of type of quad (cos(2phi) vs superferric) and whether to use a split quad Studies –Effectiveness of the HOM Absorber –RF Overhead and model for cavity gradient variations within and between pulses Relevant for Klystron Cluster scheme –Linac Alignment Conventional techniques may not be adequate – better models needed