Activities on the Orbit Feedback System for the Super-SOR Light Source SRL-ISSP, University of Tokyo Norio Nakamura 3rd International Workshop on Beam.

Slides:



Advertisements
Similar presentations
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Advertisements

Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
FAST ORBIT CORRECTION AT THE ESRF Eric Plouviez on behalf of: J. Chavanne, J.M. Koch, J.L. Pons, F. Uberto, L. Zhang.
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Alignment and Beam Stability
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
NSRRC XBPM and Beam Stability Mini Workshop 2008/09/11~12 cckuo-1 TLS and TPS Vertical Beam Size Control and Beam Stability Issues C.C. Kuo NSRRC XBPM.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Status of the Diamond Light Source R. Bartolini Diamond Light Source Ltd and John Adams Institute, University of Oxford ILCW CERN, Geneva, 20 th October.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Determination of precise model of a storage ring using response matrix fit: Application to Advanced Photon Source and Tevatron V. Sajaev, ANL Tevatron.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PETRA III, A New High Brilliant Light Source At DESY
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
1 Jean-Claude DENARD Workshop on Accelerator R&D for Ultimate Storage Rings Version 2.0 ORBIT FEEDBACK SYSTEMS and XBPMs J-C. Denard, N. Hubert * and L.
C. Steier, USR 2012, Feedbacks for USR, Workshop on Accelerator R&D for Ultimate Storage Rings : Beijing / IHEP, October 2012 Feedbacks for Ultimate.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II ASAC Meeting April 23, 2007 S. Krinsky.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Slide: 1 Workshop on Accelerator R&D for USR Beijing, 30 Oct – 1 Nov., 2012 Some engineering considerations for USR light sources L. Zhang European Synchrotron.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Off-axis injection lattice design studies of HEPS storage ring
Orbit Control For Diamond Light Source
Vertical emittance measurement and modeling Correction methods
SLS-2 – Ugrade of the Swiss Light Source
Low Emittance Rings 2014 Workshop
Coupling Correction at the Australian Synchrotron
Linear and Nonlinear Lattice Correction Via Betatron Phase
Commissioning the Fast Orbit Feedback System at SSRF
Fast Orbit Feedback System for HEPS (Cooperation work among all related systems) Dapeng Jin Control System Dec. 12, 2017.
Estimation of the orbit feedback performance for HEPS
Beam-Based Alignment Results
Electron Rings Eduard Pozdeyev.
Presentation transcript:

Activities on the Orbit Feedback System for the Super-SOR Light Source SRL-ISSP, University of Tokyo Norio Nakamura 3rd International Workshop on Beam Orbit Stabilization - IWBS2004, Hotel Kirchbühl, Grindelwald, Switzerland, December 6-10, 2004

Super-SOR Project The Super-SOR project aims to construct a 3rd-generation VUV and soft X-ray synchrotron radiation source in Japan. Proposed site is in the new campus of the University of Tokyo (Kashiwa campus).

Plan View of Super SOR Light Source ICCR&Four Centers New Graduate School Super SOR (planned) ISSP

Super-SOR Accelerators Designed to meet top-up injection Pre-Injector Linac: E=200MeV, Single- and Multi-bunch modes Booster synchrotron : E= GeV,  x = nm rad Variable momentum compaction (  = ) Storage ring : E=1.8GeV,  x =7-8 nm rad, I=400mA

Super-SOR Storage Ring 14 DBA cells with 2 x 17m and 12 x 6.2m long straight sections Flexible optics with high- and low-beta straight sections Vertical beam size at insertion devices :  y =  m (a) High-beta mode (b) Hybrid mode Optics of half ring

Design Goal of Orbit Feedback System Fast and High-resolution Beam Position Measurement Resolution 2 kHz Wide Frequency Range BW > 100Hz ( Noise attenuation: < 10Hz ) High Position Stability at Insertion Devices New orbit correction scheme  Submicron Stability

Outline of Orbit Feedback System 140 BPM (10 BPM/cell) 70 FS (5 FS/cell)

New Orbit Correction Scheme Vector of residual COD: (1) y : beam position before correction (M)  : kick angle of steering magnet (N) R : Response matrix (M x N) Constraint conditions: (2) Minimize the norm of  under the constraint conditions by introducing the following function of S (Lagrange’s method of indeterminate multipliers). (3) Set derivatives of the function S with respect to  and  to zero. (4) (5) Solution of the above equations: (6) where (7) (8) (9) Definition of the matrix A -1 : (N V  N), (10) v i : i-th eigenvector of the matrix A i  : i-th eigenvalue of the matrix A For i ~0, 1/ i in the matrix A -1 is replaced with zero to avoid very large kick angles. The condition of N V  N C is required for the existence of the inverse matrix P -1. If z is taken as the electron (or photon) beam positions measured at arbitrarily selected BPMs (or photon BPM) and C as the corresponding response matrix, the beam positions at the selected BPMs are fixed at zero by this correction. For the electron beam and BPMs, Eq. (6) can be rewritten in a simplified form. (11) Principle of eigenvector method with constraints (call “EVC” or “SVDC” here)  See Proceedings of EPAC98 and PAC99

Orbit Correction Simulation  Simulations confirm that the global and local corrections are compatible in the new method. (1) COD sources are all the quadrupole magnets with vertical position errors of  =50  m. (2) Constraint conditions are that positions at 28 BPMs on both sides of 14 long straight sections are zero. (3) 140 BPMs and 70 fast steering magnets are used for correction simulations.

Orbit Correction Study at PF ring (1) Experimental study of the new orbit correction method at PF ring Outline of correction study 1.Vertical COD is artificially generated by each vertical dipole and then several times corrected by 28 fast steering magnets using eigenvector methods with and without constraints. The number of the used eigenvectors is Constraint conditions are that beam positions at 4 BPMs on both sides of the two long straight sections are zero. 3.Measured response function is used. 4.RMS CODs for the constrained 4 BPMs and for all the BPMs are obtained for the two kinds of correction methods. PF ring (2.5GeV) 65 BPMs 4 constrained BPMs (BPM01,41,42,65) 28 Fast Steering Magnets(FSs) 42 Vertical Dipoles(VDs)

Orbit Correction Study at PF ring (2) Example of vertical COD before and after correction

Orbit Correction Study at PF ring (3) 1  m  Local correction performance of the new method is a sub-micron level !  Global correction performances of the two methods are almost the same. (The global correction performance for VD 40 - VD05 can easily be compensated by adding 1 or 2 steering magnets in the section.) 1  m Linear plotLog plot Linear plotLog plot

Orbit Correction Study at PF-AR Ring (1) Experimental study of the new orbit correction method at PF-AR ring Outline of correction study 1.Vertical COD is artificially generated by each vertical dipole (VD) and several times corrected by the other 78 VDs using eigenvector methods with and without constraints. The number of the used eigenvectors are Constraint conditions are that positions at 6 BPMs on both sides of the three long straight sections are zero. 3.Measured response matrix is used. 4.RMS CODs for the 6 BPMs and all the BPMs are obtained for the two kinds of correction methods. PF-AR ring (6.5GeV) 83 BPMs (total) 6 constrained BPMs (BPM25,26,36,37,41,42) 79 Vertical Dipoles(VDs)

Orbit Correction Study at PF-AR Ring (2) BPM Resolution (~8  m) BPM Resolution (~8  m)  Local correction performance of the new method is better than BPM resolution.  Global correction performances of the two methods are almost the same.

BPM System (1) Example of BPM location Prototype of BPM support BPM Bellows Absorber flange SR Cooling water BPM block (SUS) with SMA feedthroughs Fixed on the girder by BPM support Reduction of vacuum chamber stress by bellows Protection from SR irradiation by absorber Prototype of BPM block

BPM System (2) Design of BPM Electronics using Multiplexing & Heterodyne method S/N is more than 90dB at 200mA ( < 0.3  m in resolution). Single-bunch operation is also considered. BPM signals can be switched to another system for turn-by-turn measurement. PROBLEMS Position error by coherent synchrotron oscillations Cost effectiveness  Another type of BPM electronics is also under consideration.

Fast Steering Magnet System (1) Prototype of Fast Steering Magnet Power Supply Models for Fast Steering Magnets Upper : Switching type Lower : Linear amp. type Fast steering magnet is made of 0.5-mm silicon steel laminations. Two types of power supply (linear amp. and switching types) are tested. Linear amp. type is superior to switching type in ripple noise.

Fast Steering Magnet System (2) Steering magnet + Bellows duct Measured frequency response All the fast steering magnets are installed on the RF-shielded bellows ducts. Bellows duct is made of stainless steel and RF shields of 0.4mm-thick BeCu. Effects of bellows on frequency response are negligibly small.

Feedback Control System (1) Local controller x 2 (prototype model)Block diagram of local controller Target feedback period T s 2 kHz) 140 BPM data are shared with all the controllers by a shared memory network. CPU board computes beam positions at 10 BPMs and coil currents of 5 FSs.

Feedback Control System (2) Measurement result of consumed time for each feedback process  Feedback period of less than 0.2 ms can be achieved. Time[  sec] Feedback process BPMreadingPI controlPositioncalculationMatrixcalculationDatatransfer Total Steeringsetting

Noise Attenuation Closed loop gain  Frequency Bandwidth > 100Hz

Summary An orbit feedback system is planned for the Super-SOR project to suppress the brilliance reduction due to orbit drifts and vibrations. Final goal is sub-micron stability at the source points and at the experimental stations. A new orbit correction method, the eigenvector method with constraints (“EVC” or “SVDC”), can unite global and local orbit feedbacks and enhance the beam stability at insertion devices up to a sub-micron level. We will try to stabilize photon beams using this correction method and photon BPMs. Design and R&D of the BPM, fast steering and feedback control systems are in progress. The feedback system can achieve position resolution of less than 1  m and the frequency bandwidth of more than 100 Hz.