Technical Track Work Group Report Out August 22, 2012.

Slides:



Advertisements
Similar presentations
Do we need a GN of NGOs? Yes! (as far as participation in the GN does not reduce/affect involvement in the GP/DRR) The GN should build on existing networks.
Advertisements

The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
“Universe” of potential phosphorus for trading Tributaries (Hangman, Little Spokane, Coulee) Mainstem groundwater Lake Spokane groundwater/surface water.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Part III Solid Waste Engineering
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
Columbia River Toxics Reduction Working Group 2012 Regional Roundtable: Pacific Northwest Pollution Prevention Resource Center.
Watershed Water in a river system drains into a main river. The land area that supplies water to a river system is called a watershed. Watersheds are sometimes.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
Spokane River PCB Source Assessment Washington State Department of Ecology Spokane River Forum May
Moving to Horizontal Connections: Design Concept 2 Impacts: 1. What are the critical interactions among resources (and resource management) that will.
Who does the monitoring?. State agency staff University/Extension Consultant Volunteer/citizens’ groups Soil & Water Conservation District, Irrigation.
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed and L’Anguille River Watershed Presented by: Dan DeVun, Equilibrium.
Spokane River Regional Toxics Task Force Members of the community, stewards of the river 8/17/2015srrttf.org1.
Inland Empire Paper Company March 26, 2013 Spokane River Forum Conference The PCB Paradox.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
9 Closing the Project Teaching Strategies
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Water Quality Associated with Urban Runoff: Sources, Emerging Issues and Management Approaches Martha Sutula and Eric Stein Biogeochemistry and Biology.
Effective Public Engagement Experiences from Watershed Management Planning in Manitoba David Huck and John Snclair June 18, 2012 Fall evening at Lake Katherine.
Technical Track Work Group Report Out August xx, 2012.
Estuary Productivity & Complexity Evaluating Human Impacts.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mine Site Water Quality Monitoring Michael.
Item #17: Board Workshop Alamitos Bay and Los Cerritos Channel Watershed Management Area Watershed Management Program Approach October 9, 2014.
1 A Regional Approach to Research/Monitoring in Southern California Chris Crompton County of Orange National Monitoring Conference May 10, 2006.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Semester 2: Lecture 9 Analyzing Qualitative Data: Evaluation Research Prepared by: Dr. Lloyd Waller ©
SRRTTF Technical Activities Where We’ve Been, Where We’re Going Dave Dilks Spokane River Regional Toxics Task Force Workshop January 13,
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Toxics Management Plans Ecology Review Principles.
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
BACKRIVER TMDL PROJECT Technical Outreach Prepared by MDE/TARSA Prepared for the Baltimore Harbor Stakeholder Advisory Group September 10, 2002.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Ric Lawson Watershed Planner Huron River Watershed Council MiCorps Staff.
LA-UR PCBs in Rio Grande Watershed Surface Water and Sediment Sampling A Cooperative Study Ralph Ford-Schmid, NMED Ken Mullen, LANL October.
Evaluating and Enhancing Lake Michigan Nearshore Monitoring John Hummer and Guan Wang Great Lakes Commission Summer Webinar July 24, 2013.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
Increasing Momentum in the Formation of State and Regional Monitoring Councils Linda Green, co-chair, Collaboration and Outreach Workgroup, National Water.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Technical Track Work Group Report Out March 28, 2012.
Central Valley Flood Protection Board Update Presented by: Michael Mierzwa, P.E. Lead Flood Management Planner California.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
Public Choices for a Healthy Harbor US EPA Collaborative Science & Technology Network for Innovation Rosslyn, VA - October 18 th, 2005 Marta A. Panero.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
UNECE Working Group on Environmental Monitoring and Assessment June 2007, Geneva Asim Acikel/Tacis Project Coordinator.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
Mass Balance Assessment of 2014 Synoptic Survey Results: Dave Dilks Spokane River Regional Toxics Task Force 2014 Workshop January 13,
Technical Track Work Group Report Out August 22, 2012.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
1 – international global info-investment platform, aimed at providing support and business projects technical implementation.
High Level Scoping for Upcoming Monitoring Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group June 3,
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Technical Update Task Force & Technical Track Work Group Meeting Dave Dilks June 15, 2016.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks June 1, 2016.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Water Quality Planning Division Monitoring & Assessment Section
Beaver River Watershed PCB Investigation
Estimation of Loadings for Nonpoint Sources and Stormwater
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Salt/Nutrient Management Plans
Presentation transcript:

Technical Track Work Group Report Out August 22, 2012

Agenda Work Group Meetings Held PCB Workshop Follow-up Work Group Purpose Going Forward

Agenda Work Group Meetings Held PCB Workshop Follow-up Work Group Purpose Going Forward

Work Group Meetings June 21 st Reviewed workshop feedback information Discussed next steps relative to developing work plan objectives based on Workshop learnings July 19 th Discussed potential work plan objectives and technical advisor concept based on Workshop learnings Prepared presentation to Task Force August 8 th Review and finalization of documents for presentation to Task Force

Agenda Work Group Meetings Held PCB Workshop Follow-up Work Group Purpose Going Forward

Workshop Follow-up Technical Sessions Key Points Brainstorming Sessions Key Points Participant Evaluations Financials

Workshop Follow-up Technical Sessions Key Points Brainstorming Sessions Key Points Participant Evaluations Financials

Workshop Follow-up Technical Sessions Key Points Ecology Investigations About 90% of the PCB in river samples are in the dissolved fraction Only 43% of the PCB loading into the river has been identified thus far Stormwater is the largest identified PCB source to the river identified thus far

Workshop Follow-up Technical Sessions Key Points Ecology Investigations Stormwater sediment samples are difficult to collect as is flow data Levels of concern are at ultra low levels with respect to analytical methods PCB homologue patterning may be needed for source tracing

Workshop Follow-up Technical Sessions Key Points Local Source Identification City of Spokane Focus on sediment removal from storm catch basins Developing “zones” to focus source identification Expanding to stormwater sampling Kaiser Aluminum Focus on developing improved sampling and investigation methods to more readily identify internal sources for removal

Workshop Follow-up Technical Sessions Key Points Other Watersheds Delaware River TMDL in place with non-numeric limitations Focus is on Minimization Plans and Effectiveness Monitoring Minimization Plan approaches have included PCB source material removal (PCB transformers), PCB track down studies, and sediment removal Top 10 PCB sources have reduced discharges by 46%

Workshop Follow-up Technical Sessions Key Points Other Watersheds Portland Harbor Upstream load is largest PCB loading to harbor PCB loading from stormwater varied greatly by land use type PCB reduction efforts have focused on sediment remediation and source control Biological and surface water testing used to help identify localized source contribution

Workshop Follow-up Technical Sessions Key Points Aerial Deposition The level of importance of aerial deposition likely varies from region to region based on contribution from other sources Deposition can be from local sources as well as long range sources and is important especially for non-point sources Active and passive monitoring can be used to quantify ambient air levels

Workshop Follow-up Technical Sessions Key Points Aerial Deposition Land use influences sequestration efficiency Snow is 100 times more effective than rain for scavenging PCB Global or regional sources may set a “floor” for local reduction efforts

Workshop Follow-up Technical Sessions Key Points Stormwater PCB levels in stormwater have been reported to range from 8 ng/L to 160 ng/L Ecology has measured levels as high as 745 ng/L Land use type (open areas, residential, industrial) can generate different loading levels In-line storm sewer sampling critical for source identification tracking efforts

Workshop Follow-up Technical Sessions Key Points PCB Analysis Only Method 1668 can provide pg/L data Less than 10 laboratories in North America are capable of running Method 1668 No analytical confidence below 3 pg/L for Total PCB (without pre-concentration) Data with Total PCB levels below 1,000 pg/L is variable and highly blank influenced

Workshop Follow-up Technical Sessions Key Points Brainstorming Sessions Key Points Participant Evaluations Financials

Workshop Follow-up Brainstorming Sessions Use of a Model Evaluate early on if a model will be selected and used, so data collection supports model needs and is integrated Task Force Technical Expert Capability Water quality modeling Sediment expertise PCB sampling and results interpretation

Workshop Follow-up Brainstorming Sessions Analytical Methods Use one standard analysis methodology so all data is comparable Source Identification Develop source inventory Conduct air monitoring to quantify level of impact

Workshop Follow-up Technical Sessions Key Points Brainstorming Sessions Key Points Participant Evaluations Financials

Workshop Follow-up Attendee Evaluations 91% of attendees said they now have a better understanding of Spokane River toxics related issues 96% of attendees rated the workshop format and presentations as good to excellent

Workshop Follow-up Technical Sessions Key Points Brainstorming Sessions Key Points Participant Evaluations Financials

Workshop Follow-up Financial Income $8,500 from 7 sponsors $2,897 from registrants Expenses $3,161 for workshop meals $4,143 for speakers Fund Balance $4,093 for future use

Agenda Work Group Meetings Held PCB Workshop Follow-up Work Group Purpose Going Forward

TWG Purpose Work Group Purpose Direction from February 28, 2012 Task Force Meeting Single purpose – plan and hold workshop Additional direction provided later Additional Direction for Work Group Develop Work Plan “Next Steps”? Act as interface with technical consultants on behalf of the Task Force?

TWG Report Out End