CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
AN OVERVIEW OF REGULATION FOR EMBEDDED GENERATION. LAGOS – JULY, 2014.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Electricity Reforms in Bangladesh
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
2014 Distributed Generation Contracts Program – Recommended Megawatt Allocation Plan November 27, 2013.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Catanduanes, Philippines Lower Dugui Mini Hydro Power Plant.
CMIA CONFERENCE ON 14 TH SEP, 2013 AT AURANGABAD ASHOK PENDSE, TBIA.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
1 APEC EWG N&RE EXPERT GROUP 20TH MEETING Huang WU Energy Commission Ministry of Economic Affairs Chinese Taipei November 4, 2002, Seoul Village Power.
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Competition in the Indian electricity sector The experience so far Shahid Hasan Fellow, Energy Reforms Group The Energy and Resources Institute New Delhi,
A Discussion with the Central Asia Delegation January 2013 Dick Adams, Executive Director.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
TRANSITION TO AN ELECTRICITY MARKET TECHNICAL SEMINAR PRESENTATION SMITA BISWAL #EE [1/10] Technical Seminar Presentation on TRANSITION TO AN.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
IMPACT OF 18th AMENDMENTS ON ENERGY SECTOR GOVERNMENT OF THE PUNJAB
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Overview of Energy Policy Act of 2005 A Review of Implementation issues in New Hampshire.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Renewable energy support schemes in the Republic of Moldova
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
Energy Storage Study PPRAC Meeting May 17, 2017.
Energy Storage Study PPRAC Meeting May 17, 2017.
National Institute of Wind Energy(NIWE)
Presentation transcript:

CAPTIVE POWER POLICY

Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire a new generating station or to extend any major unit of plant has to take permission from SEB  If capacity > 25MW then SEB required to consult CEA

These restrictions & control on captive generation in Supply Act, 1948 is removed under Electricity Act 2003, Section 2 (8) “Captive generating plant” means a power plant set up by any person to generate electricity primarily for his own use and includes a power plant set up by any co-operative society or association of persons for generating electricity primarily for use of members of such cooperative society or association.

(1)  A person may construct, maintain or operate a captive generating plant and dedicated transmission lines primarily for his own use, and he can sell the surplus power available to the grid.  Owner can construct dedicated transmission line for carrying electricity from captive plant to the destination.

(2) Electricity generated from captive plant can be transmit through the grid to the destination.  He should have the right to open access in the intervening transmission facilities, subject to availability of transmission capacity.  Availability of Transmission facility determined by the central/ state Transmission Utility  Dispute if any on the issue shall be studied and settled upon by the Appropriate Commission.

 Captive power plant facilitate the creation of employment opportunities through speedy and efficient growth of industry.  Captive power plant help in meeting the demand for power by harnessing the surplus capacity.  Grid inter-connections for captive generators shall be facilitated as per section 30 of the Act(Transmission within a State).

 Distribution licensees can buy power from Captive Plant using the guidelines issued by the Central Government under section 63 of the Act.  Captive generators can be allowed to inject into the grid under the Availability Based Tariff (ABT) mechanism.

 Not < than 26 % of the ownership should be held by the captive user and  Not < than 51 % of the aggregate electricity generated in such plant, determined on an annual basis, should be consumed for the captive use.

New industries may be allowed to set up Captive Power Plant for continuous running provided the same is not connected to the Power Utility's Grid and there is no third party sale. If such captive generation is through installation of diesel generator se, control of noise pollution must be as per stipulations of the Pollution Control Board. Environment clearance should be obtained from the West Bengal Pollution Control Board and Environment Department of the State Government.

THANK YOU !!!!!