PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Advertisements

Presentation for the Policy Advisory Committee California Transportation Plan 2040 April 15, 2014 Agricultural Land Stewardship Planning.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
Reclamation Plan Project Purpose: To Satisfy Syar’s Reclamation Obligation under SMARA for the Healdsburg Terraces (Basalt, Phase I, Phase II and No Name.
The South Sacramento Habitat Conservation Plan (SSHCP)
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
The Adapting to Rising Tides Project San Francisco Bay Conservation and Development Commission Hayward Resilience Study.
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
California Natural Resources Agency U.S. Army Corps of Engineers.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
Puget Sound Initiative 2007 At A Glance Jay Manning, Director Washington Department of Ecology April 26,
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
Salton Sea Species Conservation Habitat Workshop June 10, 2010.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Two Years Old: Walking and Talking - Poised to Run? Urban Water Institute: August 25, 2011.
1 South San Francisco Bay Salt Ponds Long-Term Restoration Planning.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Accelerating Restoration Projects on Private Lands with the Partners in Restoration (PIR) Permit Coordination Program North Bay Watershed Council, Novato.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Preserving Swainson’s Hawk Habitat LAFCO October 5, 2005.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
1 NOAA Priorities for an Ecosystem Approach to Management A Presentation to the NOAA Science Advisory Board John H. Dunnigan NOAA Ecosystem Goal Team Lead.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Implementation of the Lower Columbia River Recovery Plan Northwest Region August 19, 2013.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
1 Delta Levees Investment Strategy Delta Levees Investment Strategy Delta Plan Implementation Committee Cindy Messer, Deputy Executive Officer, Planning.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
October NBA History Abshire-Kelly Salinity Control Act of 1955 Abshire-Kelly Salinity Control Act of 1955 Original authorization: Original authorization:
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Department of Water Resources Delta Levees Program Presentation for Delta Stewardship Council.
Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.
Planning Commission Study Session: Preferred Plan July 23, 2015.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
1 Improving Habitats along Delta Levees Issue Paper Proposed for Council Endorsement Presented by Jessica Davenport January 28, 2016.
Russian River Estuary Management.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
Overview of Everything You Need to Know About Mitigation.
Water Reclamation Plant Feasibility Study Update May 28, 2014
Approach to CM2 in BDCP EIR/EIS
Agriculture and Land Stewardship Planning
In-Delta Storage Program
Delta Risk Management Strategy
In-Delta Storage Program
Sacramento Environmental Commission January 2019.
Presentation transcript:

PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources

Source: FWS Source: DWR Aquatic Ecology Source: FWS Source: NOAA Listed Fish Species

DWR Habitat Restoration Requirements  USFWS Delta Smelt Biological Opinion: Restore 8,000 acres of intertidal and associated subtidal habitat  NMFS Salmonid/Sturgeon Biological Opinion: Restore salmonid rearing habitat Enhance existing habitat in Liberty Island and lower Cache Slough  CDFW Longfin Smelt Incidental Take Permit: Restore 800 acres of brackish tidal habitat  DWR Environmental Stewardship Policy: Contribute to the recovery of listed species

Fish Restoration Program Agreement (FRPA) Executed October 2010 Joint DWR and DFW program Fulfill habitat restoration obligations Establishes framework for selecting, funding, implementing and managing restoration projects

Near-term Actions Planned and potential projects Three geographic regions FRPA will support other programs where possible

Cache Slough Complex Existing tidal marsh habitat Connected to Yolo Bypass floodplain Elevations are conducive to tidal habitat restoration Dead-end channels and shallow open water High turbidity High primary and secondary productivity Delta smelt and other native fishes Land in public ownership

Why Prospect? Publicly owned Suitable elevations for tidal marsh and aquatic habitat restoration Desirable location for target fish species

Screening- Level Modeling (completed) Select Alternatives to Advance (in progress) Screening Criteria and Thresholds (completed) Broad Suite of Initial Restoration Alternatives (completed) Prospect Planning Process Restoration objectives Site conditions and setting Opportunities and constraints Outcomes hypotheses Supporting future restorations EIR Permits Construction Management (future) Phase 2 Screening Criteria and Thresholds (in progress) DRERIP Evaluation (completed) Feasibility Reviews (completed) Phase 2 Modeling (in progress) Draft Restoration Plan (in progress)

Design Features Key Breaches Overflow weir Primary channels Secondary branch channels Connecting channels to selected breaches DWR and Port properties Adjacent property access Alternatives to be developed that mix and match these components

Potential CEQA Project Actions 1.Breach levees 2.Install weir(s) 3.Excavate channels within Prospect Island 4.Place excavated soils within Prospect Island 5.Import clean, suitable sediment from off-site sources 6.Address adjacent property access 7.Control invasive species 8.Reinforce levees

Some Expected Permits 404, Section 10 – USACE 401, Porter-Cologne, 303(d) CWA for MeHg TMDL – CVRWQCB Title 23 CCR – CVFPB 1602 – CDFW Delta Reform Act – DSC

Outreach FRPA/Prospect Island Restoration outreach FRPA/Prospect Restoration OUTREACH - completed Implementation Strategy (w/ public review) Stakeholder Assessment – 27 interviewees Delta Restoration public mntg in Courtland Cache Slough Complex Tech Team mtngs Delta Independent Science Board presentation Delta Science Conference presentation SWRCB Workshop presentation DRERIP evaluation Delta Conservancy Board mtng Delta Regional Forum US Army Corps of Engineers /Port of West Sac pre-NOP briefing Solano County pre-NOP briefing Solano County Water Agency pre-NOP briefing S.F Bar Pilots/Port of West Sac pre-NOP briefing Arrowhead Marina pre-NOP briefing

Outreach (cont.) RD 2068 and NDWA pre-NOP briefing Delta Protection Commission pre-scoping briefing Mr. and Mrs. Stringer Ryer Island RD pre-scoping briefing Yolo Bypass Work Group briefing Delta Stewardship Council pre-scoping briefing – June 2013 NDWA board pre-scoping briefing CEQA Prospect Scoping session – June 10 FRPA/Prospect Restoration OUTREACH – scheduled: Central Valley Flood Protection Board – July 12 State water contractors briefing – July 31/August 1 Completed: Communication and Engagement Plan - FRPA Communication and Engagement Plan – Prospect Island Stakeholder Assessment Final Report FRPA and Prospect web pages (DWR and DFG)

Prospect Island Restoration Schedule 1. OBTAIN BASELINE INFO: 2. DESIGN: 3. CEQA: 4. PERMITS: 5. INTERIM MGMT: 6. CONSTRUCTION: STARTFINISH Jul 2010Oct 2013 Jun 2011Feb 2015 May 2013Jun 2014 Jan 2013Feb Blacklock Levee Breach, Oct 2006 Photo: S. Siegel