LHC Utilities & Facilities WAO 2010 - Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Overview of Machine Protection for the LHC
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
The Stripping Foil Test Stand in the Linac4 Transfer Line
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Guy Crockford, BE/OP/LHC, CERN WAO 2012 Automation in the SPS and LHC and its effect on operator skills The past 20 years have seen great advances in the.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Fabio Follin Delphine Jacquet For the LHC operation team
Use of a Diamond BLM System in the LHC Ring
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
LHC Commissioning with Beam
Use of a Diamond BLM System in the LHC Ring
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Mike Lamont on behalf of the LSA team
Lecture 2 Live Feed – CERN Control Centre
Summary of week 7 Hardware Commissioning:
BEAM LOSS MONITORING SYSTEM
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Initial Experience with the Machine Protection System for LHC
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Distributed BI Systems
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
LHC Injection and Dump Protection
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Chamonix Workshop XIV CERN - 17th-21st January 2005
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
The LHC Beam Interlock System
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Feedbacks & Stabilization Getting them going
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
LHC An LHC OP guide… under construction J. Wenninger
Presentation transcript:

LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations

2 Outline Introduction LHC Software Architecture LHC Sequencer LHC Beam Instrumentation & Applications Summary WAO 2010 – LHC Facilities & Utilities – M. Albert

3 Major Milestones WAO 2010 – LHC Facilities & Utilities – M. Albert … 10/09 First beam 19/09 Breakdown in S34Repair & consolidation B1: First turn in 1hB2: First turn in 1h30 20/11 Restart with beam Beam 3.5 TeV per beam Longest CERN run ever ! 28/02 Circulating beam 19/03 3.5TeV 30/03 first 3.5TeV

4 LHC parameters WAO 2010 – LHC Facilities & Utilities – M. Albert Quantitynumber Circumference m Operating temperature1.9 K ( °C) Number of magnets9593 Number of main dipoles1232 Number of main quadrupoles392 Number of RF cavities8 per beam Nominal energy, protons7 TeV Nominal energy, ions2.76 TeV/u Peak magnetic dipole field8.33 T Min. distance between bunches~7m Design Luminosity10 34 cm -2 s -1 Number of bunches per p+ beam2808 Number of protons per bunch start)1.1 x Number of turns per second11245 Number of collisions per second600 million

5 Outline Introduction LHC Software Architecture LHC Sequencer LHC Beam Instrumentation & Applications Summary WAO 2010 – LHC Facilities & Utilities – M. Albert

6 LHC Software Architecture WAO 2010 – LHC Facilities & Utilities – M. Albert Homogeneous software suite to operate LEIR, SPS and its transfer lines and the LHC Project shared between controls and operations Entirely written in Java

7 LSA 2001 : development started in motivation: replacement of old SPS control system 2005 : included LEIR 2006 : successfully SPS ( after 18 months of shutdown ! ) 2008 : LHC start – up Ongoing: adaptation to PS WAO 2010 – LHC Facilities & Utilities – M. Albert

8 LSA covers Optics Information about all devices Machine layout Twiss parameters Settings generation Generation of initial settings based on optics Settings management & trim Management of values for all parameters Coherent modifications History of changes and rollback Incorporation of LHC actual settings (scalar settings) into ramp functions Hardware exploitation Equipment control Sending settings to the hardware Services to handle LHC timing events Creation, modification Loading to and unloading from the Timing System Equipment & beam measurements WAO 2010 – LHC Facilities & Utilities – M. Albert

9 Generic applications WAO 2010 – LHC Facilities & Utilities – M. Albert Data model & business logic are common for all accelerators  we can reuse applications SPS LHC

10 WAO 2010 – LHC Facilities & Utilities – M. Albert Settings Generation Trim - coherent modifications of settings LHC Settings Incorporation Equipment state control YASP- Orbit Steering SIS LHC Sequencer BLM control Fixed Displays ~40 GUI applications depending on LSA LSA

11 Outline Introduction LHC Software Architecture LHC Sequencer LHC Beam Instrumentation & Applications Summary WAO 2010 – LHC Facilities & Utilities – M. Albert

12 The LHC Sequencer WAO 2010 – LHC Facilities & Utilities – M. Albert Application to drive the LHC through its duty cycle

13 WAO 2010 – LHC Facilities & Utilities – M. Albert LHC Sequencer - Architecture Sequencer Core (Java) DB (Oracle) Sequences Execution GUI Power converters RF Collimators Beam instrumentation Injection system Beam dump system Beam interlock etc Editor GUI

14 WAO 2010 – LHC Facilities & Utilities – M. Albert Quick launch panel provides easy access to commonly used sequences and tasks

15 WAO 2010 – LHC Facilities & Utilities – M. Albert Atomic or macro tasks Subsequence List of subsequences LHC Nominal sequence Sequence execution control

16 Outline Introduction LHC Software Architecture LHC Sequencer LHC Beam Instrumentation & Applications Summary WAO 2010 – LHC Facilities & Utilities – M. Albert

17 LHC BTV System 18 BTV in LHC transfer lines SPS - LHC 13 BTV in LHC ring 6 BTV in LHC dump lines Both video link and digitised data acquired on first shot ! WAO 2010 – LHC Facilities & Utilities – M. Albert First Beam in the LHC 8/8/2008 Uncaptured beam sweeps through he dump line First full turn as seen by the BTV 10/9/2008 Each BTV has 2 screens: 1mm Al 2 O 3 :Cr (scintillator) 12 µm Ti foil (OTR)

18 LHC BTV System Used to check steering and optics in transfer lines WAO 2010 – LHC Facilities & Utilities – M. Albert OTR image of beam in TI8 (B2) Verification of beam alignment in injection channels Injection of B2

19 LHC BTV System – beam dump WAO 2010 – LHC Facilities & Utilities – M. Albert Programmed dump of 10 bunches 2TeV

20 LHC BCT - System WAO 2010 – LHC Facilities & Utilities – M. Albert 2 DC – BCT systems per ring few 10 9 to 5  protons (~3mA to ~900mA) 1Hz for general applications First circulating beam in ring 2, 12/09/ Fast – BCT systems per ring Bunch to bunch on turn by turn basis Total beam intensity → Total beam lifetime → Beam presence flag Bunch intensity of captured B2, 10/09/2008

21 LHC Fast BCT - Lifetime WAO 2010 – LHC Facilities & Utilities – M. Albert Ramp of both beams to 3.5TeV

22 LHC BPM - System WAO 2010 – LHC Facilities & Utilities – M. Albert 1054 beam position monitors, measure in both H and V plane 1. Asynchronous bunch by bunch mode Beam threading and first few hundred turns Worked first t ime on both beams for injection tests & on 10 th Sep Asynchronous orbit mode Provided filtered data for 1Hz orbit update to YASP & FB controller Worked as soon as beam was circulating for more than a few seconds First full turn - Beam 1 First full turn - Beam 2

23 YASP - LHC Trajectory & Orbit Steering WAO 2010 – LHC Facilities & Utilities – M. Albert One of the most powerful software tools of the LHC control system. It is used to control : FIFO : self triggered mode for threading or trajectory measurements of empty ring (single bunch) CAPTURE : triggered mode where the bunches/buckets must be configured 1Hz: one orbit (averaged over 224 turns/20 ms) Average - 1s: all orbits acquired during one second are averaged. Data is returned at 1 Hz. Average - 10s: all orbits acquired during 10 s are averaged. Data is returned at 0.1 Hz TrajectoryClosed Orbit

24 YASP – B2 around the ring 1.Beam to TDI 2.Beam to IR7 3.Beam to IR6 4.Beam to CMS 5.Beam to IR3 Courtesy: J. Wenninger

25 YASP – B2 around the ring 1.Beam to TDI 2.Beam to IR7 3.Beam to IR6 4.Beam to CMS 5.Beam to IR3 6.Beam to ALICE Courtesy: J. Wenninger

26 YASP – B2 around the ring 1.Beam to TDI 2.Beam to IR7 3.Beam to IR6 4.Beam to CMS 5.Beam to IR3 6.Beam to ALICE 7.Beam to ATLAS 8.Beam to LHCb – First Turn ! Courtesy: J. Wenninger

27 LHC BLM - System WAO 2010 – LHC Facilities & Utilities – M. Albert Threefold purpose : Protect LHC equipment against damage Avoid beam induced magnet quenches Loss observation for machine parameter tuning (collimator set-up, aperture studies, etc.) 4000 beam loss monitors (Ionization chamber, SEM) mostly around quadrupoles 12 different integration times (40 µs – 83s)

28 LHC BLM – Online Display WAO 2010 – LHC Facilities & Utilities – M. Albert Beam loss monitor readings (Gray/s) along the ring (integration time : 1.3 s) 1Hz Losses units: Gray/s, % or normalized Linear or logarithmic scale Integrated signals from IC Threshold setting Monitor filter

29 LHC BLM – Capture Display WAO 2010 – LHC Facilities & Utilities – M. Albert BLM capture data Triggered by timing event Integration time: 40µs, 1.3s Loss readings of all selected monitors Single monitor vs. time Integrated loss signals (40 µs) Threshold exceeded

30 LHC - Q, Q’ & Coupling WAO 2010 – LHC Facilities & Utilities – M. Albert 3 independent acquisition chains per beam relying on base-band-tune (BBQ) method Passive beam spectra observation (no excitation) → data logging for post mortem analysis → fixed displays in CR “On demand” acquisition with excitation by: tune kickers (MKQA) fast frequency sweeps (‘chirp’ signals) via the transverse damper PLL tune operation, using the transverse damper as excitation source

31 LHC – Q, Q’, Coupling Viewer WAO 2010 – LHC Facilities & Utilities – M. Albert Acquisition of all 3 Q-chains Integrated Q, Q’ trim facility using LSA services Q’ measurement FB control Various data displays Lots of expert options... One of the work-horse applications !

32 LHC – Feedbacks WAO 2010 – LHC Facilities & Utilities – M. Albert Closed orbit corrections Q’ corrections Q – feedback is now routinely in use during ramps (not yet with PLL) Q corrections

33 Summary Very powerful software tools paired with state of the art beam instrumentation were one of the main ingredients for the efficient and fast progress during beam commissioning. Meticulous testing of application software and instrumentation before first beam payed off for beam commissioning. Involvement of operations in the development of control room software tools is highly beneficial. WAO 2010 – LHC Facilities & Utilities – M. Albert

34 Thank you ! Questions ? WAO 2010 – LHC Facilities & Utilities – M. Albert