Power Curve Working Group Update Roskilde 26 th June 2015.

Slides:



Advertisements
Similar presentations
Needs Assessment A brief overview of needs assessment in the context of using ID to plan instructional programs.
Advertisements

I MPLEMENTING ACT ON THE METHODOLOGY FOR THE COST - BENEFIT ANALYSIS OF MAJOR PROJECTS Expert Group Meeting, 26 September 2013.
Roadmap for Sourcing Decision Review Board (DRB)
Guidelines for good project management An output of the RE-ACT project under Interact Ronan Gingles for AER, Strasbourg, 14 June 2007.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
NOMS Grants Programme 2014/15
PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
1 Investment Appraisal Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
What is it? What use is it? How do you do it? What is it? What use is it? How do you do it? Richard Harrison-Murray Research consultant
INVESTMENT APPRAISAL: NET PRESENT VALUE A2 Business Studies.
Parameterised turbine performance Power Curve Working Group – Glasgow, 16 December 2014 Stuart Baylis, Matthew Colls, Przemek Marek, Alex Head.
Feasibility Analysis Chapter 3
Power Curve Working Group Overview
1 PCWG Peter Stuart 02 September Agenda (1) 2 Morning Session: 10am-1pm – “Welcome” Peter Stuart (RES) – “Review of Actions.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
PCWG 9 th Meeting December Glasgow PCWG 2015 Roadmap: Detailed Survey Results.
PCWG 9 th Meeting: 12 December Glasgow Proposed PCWG Data Sharing Initiative.
LiDAR analysis at a site with simple terrain Alex Clerc, Lee Cameron Tuesday 2 nd September
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
ISO 9001:2015 Revision overview - General users
Lean Supply Chain Action Learning Program September 2007.
ISO 9001:2015 Revision overview - General users
A Futures Toolkit Approach Observatory of Innovation Cardiff Business School.
Wind Power Analysis Using Non-Standard Statistical Models
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
3D Power Deviation Matrix PCWG Meeting – New Orleans, LA. September 14, 2015 Alex Head.
New Product Development Management NPDM 4 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
Power Curve Working Group Update New Orleans 15 th September 2015.
1 Meeting of the OECD Short-term Economic Statistics Expert Group June 2002 REVIEW OF CONCEPTS AND NATIONAL EXPERIENCES IN THE COMPILATION OF: DEMAND.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
1 MODERNIZATION OF BELARUSIAN STATISTICS _________________________________________________ IMPLEMENTATION OF THE PROCESS APPROACH IN ORGANIZING THE STATISTICAL.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
State EE/RE Policy Best Practices & Next-Generation Innovations: September Meeting Feedback on overall work plan and phasing of policies September 25,
Summary of Local Seminars & Focus Groups 20/06/ Athens WP8 – TESTING II coordinated by IFI.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
STATUS REPORT OF THE COMMON CENSUS FRAMEWORK FUNDED BY THE INTER-AMERICAN DEVELOPMENT BANK (IDB) AND THE UNITED NATIONS POPULATION FUNDS (UNFPA) Project.
12/10/15.  It is a Cross Life Cycle Activity (CLCA) that may be performed at any stage ◦ In fact, some part of it (e.g. risk analysis and management)
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
A New Theoretical Basis for Describing Low Turbulence Wind Turbine Performance Peter Stuart PCWG Meeting – 26 June 2015.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Fitness Check of environmental monitoring and reporting Stakeholder Workshop 19/20 Nov 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
Kathy Corbiere Service Delivery and Performance Commission
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
PCWG 15 th Meeting December 2015 – Kings Langley PCWG 2016 Roadmap: Detailed Survey Results.
A Proposal for a revisions policy of Principal European Economic Indicators (PEEIs) OECD STES WP June 2008.
PCWG-Share-01 Initial Results PCWG Meeting Kings Langley 9 th December 2015 Peter Stuart (RES), Lee Cameron (RES), Alex Clerc (RES) & Andy Clifton (NREL),
Quality Milestones Elaborate quality system developed over the years “Joint Agenda Building” (JAB) group “Strategic Quality” – Progress report CA/80/04.
Employment Social Impact Bonds. Our partnership Numbers4Good and the Centre for Economic and Social Inclusion (Inclusion) are launching a new partnership.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
8th October Aarhus PCWG-Share-01 Introduction.
Empowering Patients and Communities Report from the TaskForce on Community Involvement in TB Care and Prevention Paris, 31 October 2006.
Session 2: Developing a Comprehensive M&E Work Plan.
ZeroWIN 3 rd general meeting Southampton, 5-8 July 2010.
The ESA call for the 9 th Earth Explorer mission (EE9)
Measures for a national outcomes based audit model Stakeholder consultations.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
PCWG-Share-01 Current Status PCWG Meeting Hamburg 10 th March 2016 Peter Stuart (RES) and Andy Clifton (NREL), on behalf of the Power Curve Working Group.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
PCWG Intelligence Sharing Initiative 10 August 2016 NREL, Colorado, US.
PCWG 2016 Update 20th May 2016 Peter Stuart.
PCWG 2016 Update Wednesday, 13 December 2016 Glasgow, Scotland
PCWG Intelligence Sharing Initiative Update
PCWG Intelligence Sharing Initiative Update 13 December 2016
PCWG 2016 Roadmap & Meeting Overview
PCWG Intelligence Sharing Initiative
CIS work programme Ad-hoc activity on Economics
Water Directors meeting Warsaw, 8-9 December 2011
Projects of Common Interest
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Presentation transcript:

Power Curve Working Group Update Roskilde 26 th June 2015

The Power Curve Working Group The PCWG aims to further refine the accuracy energy yield predictions to improve investor confidence. The PCWG has over 200 members across 80 organisations. Turbulence Intensity [%] Wind Speed [m/s] Colour = % Power Deviation The PCWG is focused on accurately predicting wind turbine performance in ‘non-standard’ (outer range) atmospheric conditions e.g. low/high shear/veer, low/high turbulence, inflow etc.

Impact of Investment Risk on Project Economics Examine impact of cost reduction and discount rate on NPV (illustrative numbers only) Investors quantify risk using a discount rate (also called a hurdle rate). The discount rate expresses an expectation of return for a given level of risk. Net present value (NPV) can be interpreted as the money left over after an investor’s expectation if return has been satisfied. Define cost reduction factor r Reducing of investment risk and reducing of costs has similar impact on project economics Increasing Cost Increasing Risk Cost Discount Rate

PCWG Key Concept: Inner/Outer Range In Dec 2013 the PCWG published a document on the Inner/Outer Range Proposal (see Inner/Outer Range proposal is a concept developed to assist technical and contractual discussions relating to turbine performance in real world conditions.

Openness is a key principle, all historic proceedings are available online at PCWG 2015 Roadmap Themes PCWG Open Source Analysis Tool Open Source Excel Benchmarks Intelligence Sharing Initiative Harmonised Stakeholder Communication

Download PCWG 2015 Roadmap from Background (Reasons for Action) Current Industry State (Where we are now) Target Industry State (Where we need to be) Reasons for gap between current and target states PCWG 2015 Actions What we are doing to close gap and achieve target state Insights/Observations PCWG 2015 Roadmap – A3 Format

Download PCWG 2015 Roadmap from

Download PCWG 2015 Roadmap from Intelligence Sharing Initiative Turbine Performance Information Pack

PCWG Intelligence Sharing Initiative A key focus of the PCWG during 2015 is the 1 st PCWG Intelligence Sharing Initiative (PCWG-Share-01). The initiative aims to aggregate information across organization boundaries in order to deliver a step change in industry understanding of turbine performance. Propose TestAggregate The proposed structure of PCWG-Share-01 has been captured in a “definition document” which is currently with PCWG members for comment and will be finalised at the June 2015 PCWG meeting. Decide on methods to be tested Evaluate performance of trial methods on each individual dataset Combine performance metrics of all datasets Disseminate Publically disseminate results

Proprietary Dataset D Analysis Definition Y Organization D Proprietary Dataset A Organization A Proprietary Dataset B Organization B Proprietary Dataset C Organization C Aggregator (Academic Institution ) Combination Analysis Aggregated Hypothesis Performance Metrics Hypothesis Performance Metrics Analysis Definition Y Hypothesis/Trial Methodology How well did the trial method perform? PCWG-Share-01: Data Flow

Open Source Excel Benchmarks Excel Consensus Analysis for IEC Turbulence Correction and Associated Documentation All methods examined by PCWG-Share-01 will have a publically available Benchmark.

PCWG Analysis Tool Excel Benchmark and PCWG Analysis Tool Comparison

Another key action of the PCWG 2015 roadmap is the creation of a document to harmonise the communication of power curve information. The guidelines aim to ensure that all stakeholders can confidently: Harmonisation of Power Curve Communication o Understand the evidence base behind the documented turbine performance. o Understand what elements of the turbine performance data are warranted and what elements are purely informative. o Understand how to model turbine performance in Inner Range Conditions. o Understand how to model turbine performance in Outer Range Conditions. A DRAFT document “Guidelines for Preparation of a Turbine Performance Information Pack” has been circulated to members and will be discussed at the June PCWG meeting.

Review Agenda

Any other objectives for today? Objectives for 26 th June 2015 Finalise Intelligence Sharing Definition Document Discuss the draft Power Deviation Matrix Consensus Analysis. Increase familiarity with the process of setting up datasets in the PCWG Analysis Tool Establish a PCWG Beta Testing Group Beginning discussions on the power curve information harmonisation document.