ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 9th July 2002 Digital Receiver with Interference.

Slides:



Advertisements
Similar presentations
Tri-Band RF Transceivers for Dynamic Spectrum Access By Nishant Kumar and Yu-Dong Yao.
Advertisements

Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
RF Circuit Design Chris Fuller /7/2012.
Ørsted DTU 1 The COSMOS Airborne Campaigns. Status October’06 N. Skou, S. S. Søbjærg, J. Balling, S. S. Kristensen, and S. Misra ØrstedDTU Technical University.
Embedded DSP Spectrum Analyzer May 0104 April 25, 2001 Teradyne Corp Julie Dickerson Bill Black Prihamdhani AmranEE Ryan ButlerCprE Aaron DelaneyEE Nicky.
Measurements and simulations for optimization of a microwave frequency-modulated continuous-wave radar Tamara Gaynes – Mentor: Fernando Rodriguez-Morales,
ElectroScience Lab Studies of Radio Frequency Interference in SMOS Observations IGARSS 2011 Joel T. Johnson and Mustafa Aksoy Department of Electrical.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
ElectroScience Lab Remote Sensing of Ice Sheet Subsurface Temperatures Mustafa Aksoy, Joel T. Johnson, and Kenneth C. Jezek* Department of Electrical and.
Interference Daniel Mitchell, ATNF and Sydney University.
Integrated Circuits Design for Applications in Communications Dr. Charles Surya Department of Electronic and Information Engineering DE636  6220
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
CONCLUSION - The impact of the fringe wash effects on the radiometric sensitivity as well as on the spatial resolution of the SMOS instrument has been.
Aaron N. Parks Prof. Joshua R. Smith Sensor Systems Laboratory Dept
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 25th June 2003 Design of an L-Band Microwave.
ElectroScience Lab Department of Electrical and Computer Engineering ElectroScience Laboratory The Ohio State University *Department of Electrical and.
Ship-Based Observations of Ocean Waves Using Multiple X-Band Radars Christa McKelvey, Shanka Wijesundara, Andrew O’Brien, Graeme Smith, Joel T. Johnson,
Phase noise measurements in TRIUMF ISAC 2 cryomodule K. Fong, M. Laverty TRIUMF.
1 THINGS STUDENTS DO AT THE OSU ESL ERIC K. WALTON 2011 AMTA DENVER The Ohio State University ElectroScience Lab Electrical.
ElectroScience Lab IGARSS 2011 Vancouver Jul 26th, 2011 Chun-Sik Chae and Joel T. Johnson ElectroScience Laboratory Department of Electrical and Computer.
Department of Electrical and Computer Engineering ElectroScience Laboratory The Ohio State University 10th November 2005 Studies of Radio Frequency Interference.
Meteor Receiver Olajide Durosinmi Hugh Kinsel Kenny Mills Austin Pierce Nick Stelmashenko October 21, 2009.
A Low-Cost Phase Cal Monitor and RFI Spectrum Analyzer for VLBI2010 Mark-5 / Mark-6 using Cheap,COTS Software Defined Radio (SDR) Hardware & Software Gleaned.
An RFI Mitigation Strategy for the Allen Telescope Array Geoffrey C. Bower UC Berkeley.
Techniques for interference mitigation on RATAN-600 radio telescope in dm ranges A.B. Berlin, N. A. Nizhel'skij, M. G. Mingaliev, P. G. Tsybulev, D. V.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
Implementation at UVM UVM had a recently implemented a communication systems laboratory course but provided students with no device-level experience. To.
LOW COST RADAR 2012 CERF PROJECT ERIC WALTON OSU/ESL JULY 2012 ERIC WALTON OSU/ESL JULY
LOW COST RADAR; ERIC WALTON 2012 CERF PROJECT Eric Walton, ElectroScience Laboratory, ECE Dept., The Ohio State University Frequency.
Calibration and Validation Studies for Aquarius Salinity Retrieval PI: Shannon Brown Co-Is: Shailen Desai and Anthony Scodary Jet Propulsion Laboratory,
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Doc.: IEEE /0013r0 Submission April 2008 Joel Johnson, IEEE GRSSSlide 1 Coexistence Issues for Passive Earth Sensing from GHz Notice: This.
ISU Science Center : Phase 3 : Dec Speedometer Station This station matches two areas of study into one cohesive system. Current will be induced.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University *Department of Electrical and Computer Engineering.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Field Trials of an RFI Adaptive Filter for Pulsar Observations M. Kesteven, R.N. Manchester, G. Hampson & A. Brown Australia Telescope National Facility.
˜ SuperHeterodyne Rx ECE 4710: Lecture #18 fc + fLO fc – fLO -fc + fLO
Design Features of a Boresighted GPM Core Radiometer Christopher S. Ruf Dept. of Atmospheric, Oceanic & Space Sciences University of Michigan, Ann Arbor,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
NASA Instrument Incubator Program Year 3 Interim Review
Soil Moisture Radar – Ongo-02d ABSTRACT During times of increased flood problems, soil moisture becomes a paramount concern among geologists due to the.
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Digital Receiver for Interference Suppression in Microwave Radiometry
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 29th April 2003 Digital Receiver with Interference.
U N I V E R S I T Y O F S O U T H F L O R I D A “ Automated Signal Processing for Data Obtained for Core Body Temperature Measurements ” Undergraduate.
SCM x330 Ocean Discovery through Technology Area F GE.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Antenna Arrays and Automotive Applications
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
DISPLACED PHASE CENTER ANTENNA SAR IMAGING BASED ON COMPRESSED SENSING Yueguan Lin 1,2,3, Bingchen Zhang 1,2, Wen Hong 1,2 and Yirong Wu 1,2 1 National.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
A SEMINAR TOPIC ON LANDMINE DETECTION USING IMPULSE GROUND PENETRATING RADAR A SEMINAR TOPIC ON LANDMINE DETECTION USING IMPULSE GROUND PENETRATING RADAR.
Cosmic Microwave Technology, Inc.
RFI Protection Activities in IAA RAS
RFI Protection Activities in IAA RAS
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
B.Sc. Thesis by Çağrı Gürleyük
MICROWAVE REMOTE-SENSING PROJECT UPDATE
Terry Cotter LO/IF Group Leader
Analysis of Adaptive Array Algorithm Performance for Satellite Interference Cancellation in Radio Astronomy Lisha Li, Brian D. Jeffs, Andrew Poulsen, and.
Soil Moisture Active Passive (SMAP) Satellite
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
Breakout Session SC3 – Undulator
Presentation transcript:

ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 9th July 2002 Digital Receiver with Interference Suppression for Microwave Radiometry NASA Instrument Incubator Program Interim Review PIs: Joel T. Johnson and Steven W. Ellingson

Digital Receiver with Interference Suppression for Microwave Radiometry Future sea salinity and soil moisture remote sensing missions depend critically on L-Band microwave radiometry. RF interference is a major problem and limits useable bandwidth to 20 MHz. An interference suppressing radiometer could operate with a larger bandwidth to achieve improved sensitivity and more accurate moisture/salinity retrievals. Year 1: Complete design and begin construction Year 2: Finish construction and begin tests Year 3: Demonstrations and space system design A prototype radiometer will be designed, built, and used to demonstrate operation in the presence of interference. The design includes a processing component to suppress interference. PIs: Joel T. Johnson and Steven W. Ellingson, The Ohio State University Dr. Grant Hampson, OSU Results will apply to all future microwave radiometer missions. Future L-band soil moisture and salinity missions are primary focus. Traditional Radiometer New design ESTO Earth Science Technology Office Instrument Incubator Program Description and Objectives Schedule and DeliverablesApproach Co-I’s/PartnersApplication/Mission

ElectroScience Lab Project Schedule l Project “year 1” is 9 months, 3/11/02-11/30/02; interim review held at 4.5 months

ElectroScience Lab Current Progress l Progress toward the first milestone has been excellent since project inception; work has focused on –radiometer front end design (antenna to A/D) –back end processor design (after A/D) –planning for outdoor experiments in year two –measurements of local RFI environment l Evaluation of commercial A/D and FPGA hardware has determined suitable parts for this project l Major effort on back end processor, including downconversion, “pulse blanker” and “FFT” stages l RFI tests show a strong 1331 MHz source: ATC radar in London, OH (~45 km away); MHz proposed for instrument band l RFI monitor system for NASA P-3 flights in progress

ElectroScience Lab Radiometer Front End l Front end design is relatively standard super-heterodyne system l Expected receiver temperature in range K l Single downconversion design with a tunable LO; MHz tuning range possible l Proposed 100 MHz bandwidth split into two 50 MHz backend channels due to A/D limitations; parallel hardware in LO/Mixer stages l Several choices made to improve stability: –minimize front end gain (~46 dB) due to high dynamic range A/D –ultimate bandwidth set digitally; use low order analog filters –noise source and temperature monitored terminator for internal cal l Plan for thermal control of front end will be developed based on initial tests; may not be required for some experiments l Analog “blanking” switch included to limit backend signal levels, remove potential IF amp transients l Basic design complete; majority of parts have arrived

ElectroScience Lab Back End Processor l A/D survey selects Analog Devices 9410 for A/D (10 bits, 200 MSPS operation, $200 with evaluation board) l Sections: –digital IF (DIF): Each parallel channel is digitally filtered to bandwidth 50 MHz and frequency shifted so that parallel channels can be recombined into final 100 MHz complex data stream –asynchronous pulse blanker (APB): Data stream is compared to an adaptive threshhold to detect presence of “pulsed” signals; data is blanked upon detection –FFT excision (FFTE): Data stream is windowed and passed through an 1024 point FFT; individual bin power levels then compared to a threshhold for blanking of narrowband interference –Output section: Data is integrated and transferred to an external computer l Detailed designs of digital IF and APB completed and simulated; FFTE section initial design complete l System will be implemented in FPGA hardware; suitable parts, design systems, and board suppliers identified; now testing some blocks

ElectroScience Lab Experiment Planning l A series of experiments with the prototype will be conducted at ESL in years two and three for verification l Observations of a large water tank planned; external cal sources are ambient absorbers and a sky reflector l For operation in far field, spot size on ground proportional to antenna size; choose antenna diameter 1.2 m as a compromise between angular resolution and spot size l Antenna provides ~15 deg beamwidth; operation from ESL roof yields antenna height ~10 m l Resulting 3 dB spot size is ~ 6 m x 3 m for 55 deg operation; water tank should be approx. 20’ x 10’ l Cal targets will be of identical size to reduce effect of background contributions; time series of observations will be correlated with target temperatures l Selection of parts (antenna, feed, antenna mount, temperature recording equipment, cal loads) currently in progress

ElectroScience Lab RFI Environment Studies l Measurements of RFI at multiple locations needed to develop robust interference suppression algorithms l Spectrum analyzer delivered 5/16/02; local environment tests in progress with low gain antenna on ESL roof l ATC radar at 1331 MHz will provide an excellent source for testing APB design l Characterization of weaker interferers in progress; needed for testing FFTE design l RFI monitor sensor under development for inclusion in NASA P-3 flights; possible dates mid-late August 02 l RFI monitor will include spectrum analyzer for wideband survey, custom narrowband sensor to digitize 1413 MHz region l Recent visit to Wallops to examine possible antenna mounts; monitor completion should be possible by flight dates l Data will be useful for IIP project and for NASA personnel (help reduce interference susceptibility of their narrowband radiometers)

ElectroScience Lab Budget Status/Personnel l Budget for year 1:239.5K + 21K equipment l Remaining as of 6/30: ~110K + 0K equipment (22K/month for 5 mo) l No cost under- or over-runs are expected l Personnel: –J. T. Johnson: co-PI –S. W. Ellingson: co-PI –G. A. Hampson: Research Scientist –D. R. Wiggins: Graduate student (graduated June 02) –Currently screening graduate student candidates for Oct 02 l Document Server (password protected):

ElectroScience Lab Plans for Remainder of Current Period l Complete front end and backend processor designs (esp. FFTE block) l Begin front end and back end processor construction l Initial tests of front end and backend processor performance l Continue local RFI survey l Complete RFI monitor system and include in August P-3 flights l Continue planning for external experiments; finalize and order necessary parts l YEAR 2: Complete entire system construction and deploy in external measurements l YEAR 3: Continue external measurements for conclusive demonstration; studies of deployment in space