INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Trading & Settlement Code modification Mod 21 / 12 Amendment to Available Transfer Capacity (ATC) definition.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
Mod 26_12 Notification Time for updating Interconnector Technical Data.
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
MOD_17_12 Report on Offered Capacity in Implicit Auctions.
Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014.
Draft document – Work in progress
Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, am – 13:00 pm Conference call number: , pin:
MOD_42_10v2 : Changes to the Single Ramp Up Rate and the Single Ramp Down Rate Calculation.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 29 May 2012.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Single Electricity Market SEM Release – October 2012 Change Control Forum (CCF) Meeting Conference Call Number: +353 (0) Participant PIN:
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
Unit Registration Process Improvement SEMO 05/12/2012.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
1 Market Operator User Group Meeting 1 Market Operator User Group Meeting 13 th of March 2012 The Oval, Dublin Conference Call Number:
Expert Group 8 on Assessment of draft UNI standards on DSRC communications- Overview of the work and results Working for DG TREN in support of the.
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 July 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
T&SC Modification Proposal: Clarification of Outturn Availability
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SLIDE 1 FCAS CAUSER PAYS: STAGE 1 DISPUTE MEETING BACKGROUND 15 MARCH 2016 PRESENTED BY LOUISE THOMSON.
Multiplication Timed Tests.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
Amending the Performance Framework
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Correction of Minor Material Drafting Errors
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018.
MOD_04_18 Reporting and Publication for Operational Schedules, Dispatch Instructions, Forecast Availability and SO Trades 13th March 2018.
Update to Unit Under Test Process
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Working Paper No. WLTP-05-12
Imbalance Price Modifications
Credit Cover Signage and Subscript Correction
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
Imbalance Price Modifications
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Correction to No Load Cost - “and” vs “or”
Interconnector trading in SEM 7th June 2007
Correction to COP and clarification to CNLR
Presentation transcript:

INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012

2 SEM Intra-Day Trading will be implemented in July SEM Intra-Day Trading (Mod_18_10_v2) requires that: MIUNs are fixed where possible in subsequent MSP Software Runs; Superposition is allowed; and There are three Gate Windows for each Trading Day. These changes to Appendix 2 of Agreed Procedure 2 (where the specific MIUN calculation rules are summarised) are required to align with Mod_18_10_v2. The MIUN Calculator vendor is currently making changes to the MIUN Calculator to deliver this requirement. The changes will be tested by SEMO and delivered prior to the start of Market Trial. The drafting changes in the Modification Proposal are in respect of the approved drafting for Intra-Day Trading. Background

3 Recap: SEM Intra-Day Trading Design Start Overlap Opt’n Period Trading Day - 1Trading Day Gate Window Closure (GWC) EA1 Gate Window Opening (GWO) e.g. as per current GWC EA2 GWO GWC WD1 GWO GATE WINDOW 10:00 TD-29 to 09:30 TD-1 GATE WINDOW 09:30 TD-1 to 11:30 TD-1 GATE WINDOW 11:30 TD-1 to 08:00 TD EA1 Trading Window EA2 Trading Window WD1 Trading Window Ending Overlap Opt’n Period Ending Overlap Opt’n Period Ending Overlap Opt’n Period OPTIMISATION TIME HORIZON EA1 Interconnector Unit trades fixed EA1 and EA2 Interconnector Unit trades fixed MIUN Calculator changes deliver this requirement (where possible).

4 Why do the current AP2 rules not deliver the IDT requirements? Do not allow for Superposition IUNs in each direction are capped by the corresponding ATC limit and ACH i.e. sum[IUNs + ]≤ATC + and sum[IUNs - ]≥ATC - Do not allow for multiple Gate Windows Only one Gate Window currently, taking into account Active Capacity Holdings. Currently, the rules would result in zero MIUNs for IUs without Capacity Holdings. Do not fix previously determined MIUNs MIUN Calculator currently does not consider MIUNs previously calculated. MIUN Calculator considers all Units at the same time (there is no ordering to the consideration of IUs).

5 What changes will deliver the IDT requirements? Allow for Superposition Total IUNs are capped by the ATC import and export limits i.e. sum[IUNs all ]≤ATC + and sum[IUNs all ]≥ATC - Allow for multiple Gate Windows Calculate MIUNs following each MSP Software Run or change in ATC. Fix previously determined MIUNs Track MIUNs calculated following the associated MSP Software Run (Original MIUNs). Fix Original MIUNs where possible (in some circumstances MIUNs cannot be fixed). Then consider IUs where there are no previously calculated MIUNs to fix.

6 The changes in the Modification Proposal are summarised as follows: 1.Clarification that the MIUNs as calculated following the relevant MSP Software Run will be fixed in subsequent MIUN calculations where possible. 2.Correction of the explanation of when Interconnector Units are considered to be ramping up or down. (This is currently incorrect in its description of the existing process.) 3.Introduction of Original MIUNs and Original IUNs as defined terms in Agreed Procedure 2, Appendix 2. These terms will enable fixing and make clear which version of the IUNs/MIUNs are used as inputs to the relevant MIUN Calculator run. Summary of Modification Proposal

7 Overview of MIUN Calculation for Intra-Day Trading EA1 MSP Software Run Interconnector Dispatch Schedule Area under the Interconnector Dispatch curve = sum of MIUNs, allocated to EA1 Interconnector Units COD TOD etc Original MIUNs for EA1 Units Input to MIUN Calc MIUN Calculator Original IUNs for EA1 Units EA2 MSP Software Run Interconnector Dispatch Schedule COD TOD etc Original MIUNs for EA2 Units Input to MIUN Calc MIUN Calculator Original IUNs for EA1, EA2 Units Area under the Interconnector Dispatch curve = sum of MIUNs, allocated to Interconnector Units (EA1 allocated first) WD1 MSP Software Run Interconnector Dispatch Schedule COD TOD etc Original MIUNs for WD1 Units MIUN Calculator Original IUNs for EA1, EA2, WD1 Units Area under the Interconnector Dispatch curve = sum of MIUNs, allocated to Interconnector Units (EA1, EA2, then WD1) Input to MIUN Calc

8 Overview of MIUN Calculation for Intra-Day Trading Ex-Ante One MSP Software: Calculate EA1 Original IUNs. MIUN Calculator Produce feasible Interconnector profile. Calculate EA1 Original MIUNs. If ATC changes, attempt to meet all Original MIUNs if possible. Ex-Ante Two MSP Software: Calculate EA2 Original IUNs. MIUN Calculator Produce feasible Interconnector profile. Fix EA1 Original MIUNs. Calculate EA2 Original MIUNs. If ATC changes, attempt to meet all Original MIUNs if possible. Within Day One MSP Software: Calculate WD1 Original IUNs. MIUN Calculator Produce feasible Interconnector profile. Fix EA1 and EA2 Original MIUNs. Calculate WD1 Original MIUNs. If ATC changes, attempt to meet all Original MIUNs if possible.

9 Correction of definition of Ramping Up/Down

10 Questions and Discussion