Www.izmirekonomi.edu.tr L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.

Slides:



Advertisements
Similar presentations
Rate of Return Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Advertisements

COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Internal Rate of Return (Multiple Rates of Return Problem) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
Annual Worth Analysis Lecture No.18 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Taxes and Depreciation MACRS. Review What is Depreciation? –Decline in value due to wear and tear (deterioration), obsolescence and lower resale value.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk Probability.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Dealing With Uncertainty
Engineering Economics in Canada
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 9 Making Capital Investment Decisions.
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Sensitivity and Breakeven Analysis
IEN255 Chapter 8 - Taxes Agenda Net Income Corporate Income Taxes
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Lecture No.33 Chapter 10 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture No. 38 Chapter 12 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter 8 Annual Equivalent Worth Analysis
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Copyright © 2003 Pearson Education Canada Inc. Slide 3-28 Chapter 3 Cost-Volume-Profit Analysis.
1 Understanding Project Cost Elements Lecture No. 22 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Chapter 10 Making Capital Investment Decisions McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin ©2001 The McGraw-Hill Companies All Rights Reserved 9.0 Chapter 9 Making Capital Investment Decisions.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 0 Chapter 9 Making Capital Investment Decisions.
L24: Net Income Versus Cash Flow ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
8-1 Capital Budgeting Decisions–Part II Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 8.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 Capital Budgeting Capital budgeting - A process of evaluating and planning expenditure on assets that will provide future cash flow(s).
L3: Economic Equivalence ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Making Capital Investment Decisions Chapter 9.
C H A P T E R 4 Capital Investment Decisions Capital Investment Decisions.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
(c) 2001 Contemporary Engineering Economics1 L:26 Project Cost Elements and Income Tax Rate to Be Used ECON 320 Engineering Economics.
Evaluating a Single Project
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Sensitivity and Breakeven Analysis Lecture No. 25 Chapter 10 Fundamentals of Engineering Economics Copyright © 2008.
0 Chapter 10 Making Capital Investment Decisions.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
10 0 Making Capital Investment Decisions. 1 Key Concepts and Skills  Understand how to determine the relevant cash flows for various types of proposed.
L14: Evaluating Business and Engineering Assets – Part II ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
10 0 Making Capital Investment Decisions. 1 Key Concepts and Skills  Understand how to determine the relevant cash flows for various types of proposed.
L6: Interest Formulas (Gradient Series) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.
L18: Annual Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L7: Unconventional Equivalence Calculations
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Making Capital Investment Decision 1.Expansion 2.Replacement 3.Mandatory 4.Safety and regulatory 5.Competitive Bid price.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
Effects of Inflation on Project Cash Flows
Methods of Describing Project Risk
Probabilistic Cash Flow Analysis
Project Cash Flow Analysis
Bus 512- Capital Budgeting | Dr. Menahem Rosenberg
Chapter 7 Present Worth Analysis
Project Cash Flow Analysis
FIN3013 Lab #7.
HANDLING PROJECT UNCERTAINTY CHAPTER 11
Presentation transcript:

L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences

Chapter 10 Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk Probability Concepts for Investment Decisions Risk-Adjusted Discount Rate Approach

Origins of Project Risk Risk: the potential for loss Project Risk: variability in a project’s NPW Risk Analysis: The assignment of probabilities to the various outcomes of an investment project

Methods of Describing Project Risk Sensitivity Analysis: a means of identifying the project variables which, when varied, have the greatest effect on project acceptability.  What might have greatest effect on NPW, if changed? Break-Even Analysis: a means of identifying the value of a particular project variable that causes the project to exactly break even. Scenario Analysis: a means of comparing a “base case” to one or more additional scenarios, such as best and worst case, to identify the extreme and most likely project outcomes.

Sensitivity Analysis – Example 10.1 Should we or should we not? Transmission-Housing Project by Boston Metal Company New investment = $125,000 Number of units = 2,000 units Unit Price = $50 per unit Unit variable cost = $15 per unit Fixed cost = $10,000/Yr Project Life = 5 years Salvage value = $40,000 at the end of project life. Income tax rate = 40% MARR = 15% Depreciation 7-year MACRS (Check out % depreciation from table 8.5) for a 5 year project. Develop a table for after-tax cash flow table! Then we will assess the situation under different scenarios

Example After-tax Cash Flow for BMC’s Transmission- Housings Project – “Base Case” Revenues: Unit Price50 Demand (units)2,000 Sales revenue$100,000 Expenses: Unit variable cost$15 Variable cost30,000 Fixed cost10,000 Depreciation17,86330,61321,86315,6135,575 Taxable Income$42,137$29,387$38,137$44,387$54,425 Income taxes (40%)16,85511,75515,25517,75521,770 Net Income$25,282$17,632$22,882$26,632$32,655

Cash Flow Statement Operating activities Net income 25,28217,63222,88226,63232,655 Depreciation 17,86330,61321,86315,6135,575 Investment activities Investment (125,000) Salvage 40,000 Gains tax (2,611) Net cash flow ($125,500)$43,145$48,245$44,745$42,245$75,619 (Example 10.1, Continued)

Example Sensitivity Analysis for Five Key Input Variables Deviation-20%-15%-10%-5%0%5%10%15%20% Unit price$57$9,999$20,055$30,111$40,169$50,225$60,281$70,337$80,393 Demand12,01019,04926,08833,13040,16947,20854,24761,28668,325 Variable cost52,23649,21946,20243,18640,16937,15234,13531,11828,101 Fixed cost44,19143,18542,17941,17540,16939,16338,15737,15136,145 Salvage value 37,78238,37838,97439,57340,16940,76541,36141,95742,553 Base Try to understand what will happen if estimates on unit prices, demand, variable and fixed cost, salvage value change?

Sensitivity graph – BMC’s transmission-housings project -20% -15%-10%-5% 0%5%10%15%20% $100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10, ,000 Base Unit Price Demand Salvage value Fixed cost Variable cost

Example Sensitivity Analysis for Mutually Exclusive Alternatives

Capital (Ownership) Cost  Electrical power: CR(10%) = ($30,000 - $3,000)(A/P, 10%, 7) + (0.10)$3,000 = $5,845  LPG: CR(10%) = ($21,000- $2,000)(A/P, 10%, 7) + (0.10)$2,000 = $4,103  Gasoline: CR(10%) = ($20,000-$2,000)(A/P, 10%, 7) + (0.10) $2,000 = $3,897  Diesel fuel: CR(10%) = ($25,000 -$2,200)(A/P, 10%, 7) +(0.10) $2,200 = $4,903

REMEMBER L 17 FROM CHAPTER 6 ? Annual Equivalent Cost When only costs are involved, the AE method is called the annual equivalent cost. Revenues must cover two kinds of costs: Operating costs and capital costs. Capital costs Operating costs + Annual Equivalent Costs

REMEMBER L 17 FROM CHAPTER 6 ? Capital (Ownership) Costs Def: Owning an equipment is associated with two transactions—(1) its initial cost (I) and (2) its salvage value (S). Capital costs: Taking these items into consideration, we calculate the capital costs as: N 0 N I S CR(i)

Annual O&M Cost Let M be number of shifts per year  Electrical power: $500 + (1.60 + 5)M = $500 + 6.6M  LPG: $1,000 + (12 + 6)M = $1,000 + 18M  Gasoline: $800 + (13.2 + 7)M = $800  M  Diesel fuel: $1,500 + (7.7 + 9)M = $1,500 + 16.7M

Annual Equivalent Cost  Electrical power: AE(10%) = 6,345 + 6.6M  LPG: AE(10%) = 5,103 + 18M  Gasoline: AE(10%) = 4,697  M  Diesel fuel: AE(10%) = 6,403 + 16.7M

Break-Even Analysis  Excel using a Goal Seek function  Analytical Approach

Excel Using a Goal Seek Function NPW Breakeven Value Demand Can we find demand level for which NPW is 0?

Goal Seek Function Parameters

Analytical Approach Unknown Sales Units (X) for BMC transm. housing Cash Inflows : Net salvage 37,389 X(1-0.4)($50) 30X 0.4 (dep) 7,14512,2458,7456,2452,230 Cash outflows: Investment -125,000 -X(1-0.4)($15) -9X -(0.6)($10,000) -6,000 Net Cash Flow -125,00021X + 1,145 21X + 6,245 21X + 2,745 21X X + 33,617

PW of cash inflows PW(15%) Inflow = (PW of after-tax net revenue) + (PW of net salvage value) + (PW of tax savings from depreciation = 30X(P/A, 15%, 5) + $37,389(P/F, 15%, 5) + $7,145(P/F, 15%,1) + $12,245(P/F, 15%, 2) + $8,745(P/F, 15%, 3) + $6,245(P/F, 15%, 4) + $2,230(P/F, 15%,5) = 30X(P/A, 15%, 5) + $44,490 = X + $44,490

PW of cash outflows: PW(15%) Outflow = (PW of capital expenditure_ + (PW) of after-tax expenses = $125,000 + (9X+$6,000)(P/A, 15%, 5) = X + $145,113 The NPW: PW (15%) = X + $44,490 - ( X + $145,113) = X - $100,623. Breakeven volume: PW (15%)= X - $100,623 = 0 X b =1,430 units.

Demand PW of inflow PW of OutflowNPW X X - $44, X + $145, X -$100,623 0$44,490$145,113100, ,773160,19865, ,055175,28230, ,197188, ,298188, ,338190,3674, ,620205,45240, ,903220,53775,366

Break-Even Analysis Chart Outflow $350, , , , , ,000 50, , ,000 Profit Loss Break-even Volume X b = 1430 Annual Sales Units (X) PW (15%) Inflow

Scenario Analysis Variable Considered Worst- Case Scenario Most-Likely- Case Scenario Best-Case Scenario Unit demand1,6002,0002,400 Unit price ($) Variable cost ($) Fixed Cost ($)11,00010,0008,000 Salvage value ($)30,00040,00050,000 PW (15%)-$5,856$40,169$104,295