SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

2006/9/25-26 ILCDR06, Cornell University 1 DESIGN STUDY OF A MOVABLE COLLIMATOR WITH LOW BEAM IMPEDANCE Yusuke Suetsugu*, Kyo Shibata KEKB Vac. Group Introduction.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Vacuum and mechanical design of ILC DR O. B. Malyshev ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK Low Emittance Ring Workshop
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
18-20/12/2007 ILC Damping Ring R&D Mini-workshop, KEK, Japan Vacuum Design vs. e-cloud Oleg B. Malyshev ASTeC Daresbury Laboratory.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
Groove Mitigation and Plans
T. Agoh (KEK) Introduction CSR emitted in wiggler
Electron Cloud Effects in SuperB
Measurement of Electron Cloud in KEKB LER with RFA
CEPC Vacuum System Dong Haiyi 2017/11/5.
RECENT DEVELOPMENTS IN MODELING
Utilization of KEKB for ILC R&D
Challenges for FCC-ee MDI mechanical design
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Electron Clouds at SLAC
CEPC Vacuum Systems Design Consideration
Makoto Tobiyama KEK Accelerator Laboratory and SOKENDAI
Presentation transcript:

SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc section Beam pipes for wiggler section Pumps Bellows chambers, Gate valves Approximate costs Summary 2012/4/251KILC12 Daegu Korea

SuperKEKB SuperKEKB is an electron-positron double ring collider in Tsukuba, Japan. Electron ring (HER; High Energy Ring): 7 GeV Positron ring (LER; Low Energy Ring): 4 GeV Circumference: 3016 m Main features Goal luminosity: 8×10 35 cm -2 s -1 High beam current; LER: 3.6 A, HER: 2.6 A Short bunch length  z = 5-6 mm) Short bunch spacing 4 ns, 2500 bunches Low beam emittances  x =3.2 – 2.4 nm  y =13 – 8.4 pm 2012/4/252KILC12 Daegu Korea

SuperKEKB Vacuum System These features make strenuous demand on the vacuum system Endurance for high power synchrotron radiation (SR) from the high beam currents Low beam impedance for beam pipes and the components to avoid single and multi-bunch instabilities Suppression of electron cloud instability in the positron ring Suppression of ion instability in the electron ring 2012/4/253KILC12 Daegu Korea Very similar issues for damping rings for the damping rings of ILC. Here briefly reported are the designs of some key vacuum components for the SuperKEKB positron ring, and their approximate costs.

Design of SuperKEKB Vacuum System The designs of most of key components have been finished, and the production of them have started in full swing since last year. Beam pipes: Beam pipes with antechambers Aluminum part Groove surface (in bending magnets) Clearing electrode (beam pipes for arc section Copper beam pipes for wiggler section With countermeasures against electron cloud effects TiN coating for most in wiggler magnets) Solenoid (drift region) Pumps Distributed pumping system using NEG strips Bellows chambers and gate valves Comb-type RF shield: High HOM shielding property 2012/4/25 4 KILC12 Daegu Korea

Beam pipes for arc section _1 Beam pipes with antechambers Small effect of photoelectrons, low beam impedance, low SR power density at side wall To be fit to the existing magnets. Same cross section for flanges. Aluminum alloy is available for arc section Extrusion method 2012/4/25 5 KILC12 Daegu Korea Aluminum (A6063)

Beam pipes for arc section _2 Rough surface at the side wall Suppress the photon reflection Ra~20 Grooved surface in bending magnets Reduce effective SEY structurally Expected reduction of electron density by factors Formed by extrusion method With TiN coating 2012/4/25 6 KILC12 Daegu Korea B by L. Wang et al. d (Depth) Valley : R0.1~0.12 Top : R0.15 Angle : 18~18.3°

Beam pipes for arc section _3 2012/4/257KILC12 Daegu Korea Production Formed with an extrusion method (A6063) Aluminum-alloy flange (A2219) Type-S, Q and B: 1861 m Manufacturing is in progress. Type-B Type-Q Type-S BPM block SR Mask

Beam pipes for wiggler section _1 Beam pipes with antechambers Copper is required due to intense SR power Formed by cold drawing method Copper alloy flanges (CrCu) 2012/4/25 8 KILC12 Daegu Korea

Beam pipes for wiggler section _2 Clearing electrode in wiggler magnets Attract electrons by electrostatic field Very thin electrode has been developed 0.1 mm tungsten on 0.2 mm Al 2 O 3 Expected reduction in electron density around beam of ~1/ /4/25 9 KILC12 Daegu Korea +500 V +75 V 0 V ~3kV/m Antechamber Beam channel (  90mm) Electron density Electrode (+) L. Wang et al, EPAC2006, p.1489

Beam pipes for wiggler section _3 Production Nikko and Oho straight section Type-S and Q 223 m Type-S has two clearing electrodes. Type-Q has TiN coating. Beam pipes at the downstream of wiggler should be also made of copper. 2012/4/25 10 KILC12 Daegu Korea

Pumps _1 Main Pump: NEG strips Arc: Inserted in one of antechambers (inside of the ring) Distributed pumping system Effective pumping speed of ~ 80 l/s/m. Straight: Lumped pump ports at both antechambers Ion pumps: Placed every 10 m as an auxiliary pump 2012/4/25 11 KILC12 Daegu Korea Straight Section (Wiggler) Feed- through NEG strip

Pumps _2 Production Three layers of NEG strips “ST707 3D” Activated by micro-heaters (sheath heaters) Screens between pump and beam (  4 mm) NEG strips (3m x 2400 pcs.), Heaters (1070 pcs.), transformer (1105 pcs.), Feed-though (950 pcs.) 2012/4/25 12 KILC12 Daegu Korea Arc Section

Bellows chambers and gate valves _1 Bellows and gate valves with comb-type RF-shield Sure RF shielding, thermally strong Applicable to antechamber scheme Finger-type for some cases, if flexibility is required. 2012/4/25 13 KILC12 Daegu Korea

Bellows chambers and gate valves _2 Production Bellows chambers Aluminum alloy for arc section (690) Copper for wiggler and straight section (125) Gate valves 24 Stainless steel (Ag coating)+ Comb shield (copper) 2012/4/25 14 KILC12 Daegu Korea Copper bellows chamber Inside Aluminum alloy bellows chamber Inside

TiN coating system _1 TiN coating in KEK, followed by pre-baking Magnetron sputtering 5 sets for Q and S-types, and 2 sets for B-types Construction is in progress. 2012/4/25 15 KILC12 Daegu Korea